The document outlines a 17-month geotechnical project consisting of 4 phases: Phase 1 includes a desk study, site visit, land surveying, site investigation tendering, field works, and lab testing for soil mixing. Phase 2 focuses on compaction earthworks, in situ testing, data analysis, modeling, and predictions. Meetings and reporting occur throughout the project.
The document outlines a 17-month geotechnical project consisting of 4 phases: Phase 1 includes a desk study, site visit, land surveying, site investigation tendering, field works, and lab testing for soil mixing. Phase 2 focuses on compaction earthworks, in situ testing, data analysis, modeling, and predictions. Meetings and reporting occur throughout the project.
The document outlines a 17-month geotechnical project consisting of 4 phases: Phase 1 includes a desk study, site visit, land surveying, site investigation tendering, field works, and lab testing for soil mixing. Phase 2 focuses on compaction earthworks, in situ testing, data analysis, modeling, and predictions. Meetings and reporting occur throughout the project.
surveying 1 Phase 1: Site investigation –tendering and 2 process and site investigation works 3 Phase 1: Lab works Phase 1: Preparing and testing of trial mix 4 for Condisoil
5 Phase 2: Compaction Earthwork
6 Phase 2: In situ geotechnical tests Phase 2: Data analysis, FEM modelling 7 and the mathematical predictions 8 Meetings 9 Reporting 10 11 12 13 14 15 16 17 18