Nabila Oktaviani - TE D2016 - Energi Alternatif PDF
Nabila Oktaviani - TE D2016 - Energi Alternatif PDF
File: bandung.hgrid
Author:
Location: Jl. Pasadena No.17, Kb. Pisang, Sumur Bandung, Kota Bandung, Jawa Barat
40112, Indonesia (6°55.0'S, 107°37.1'E)
Notes:
System Architecture 3
Cost Summary 4
Cash Flow 5
Electrical Summary 6
Utility: LG: Large General > 25 KW 7
Schematic
Annualized Costs
Name Capital Operating Replacement Salvage Resource Total
Large General
> 25 KW $0.00 $11,890 $0.00 $0.00 $0.00 $11,890
System $0.00 $11,890 $0.00 $0.00 $0.00 $11,890
Production Summary
Component Production (kWh/yr) Percent
Grid Purchases 77,745 100
Total 77,745 100
Consumption Summary
Component Consumption (kWh/yr) Percent
AC Primary Load 77,745 100
Total 77,745 100