The document outlines a construction project taking place from March 2019 to December 2019. It details 15 sections of work including roofing, floors, walls, stairs, pools, doors/windows, landscaping, parking, electrical, and plumbing. A schedule is provided assigning sections to be worked on each month to complete the project by the end of 2019. Major holidays like Eid al-Fitr are noted.
The document outlines a construction project taking place from March 2019 to December 2019. It details 15 sections of work including roofing, floors, walls, stairs, pools, doors/windows, landscaping, parking, electrical, and plumbing. A schedule is provided assigning sections to be worked on each month to complete the project by the end of 2019. Major holidays like Eid al-Fitr are noted.
The document outlines a construction project taking place from March 2019 to December 2019. It details 15 sections of work including roofing, floors, walls, stairs, pools, doors/windows, landscaping, parking, electrical, and plumbing. A schedule is provided assigning sections to be worked on each month to complete the project by the end of 2019. Major holidays like Eid al-Fitr are noted.
1&7 I. Pekerjaan Atap / Roof Works a. Pemasangan Atap Kamar (Level -0.95 , -1.75, & -2.55) / Room Roof Installation (level -0.95, -1.75, & -2.55) b. Pemasangan Plafon / Ceiling Installation * Kalsiboar * Kayu parket II. Pekerjaan Lantai / Floor Works a. Pekerjaan Lantai Keramik / Tile Work b. Pekerjaan Lantai Terazzo / Terazzo Floor Work c. Pekerjaan Plint Keramik / Plint Ceramics Work III. Pekerjaan Dinding / Wall Work a. Pekerjaan Dinding / Wall work b. Pekerjaan Keramik Dinding / Wall Ceramics Works Wall Works c. Pekerjaan Dinding Batu / Stone Cladding d. Pekerjaan Pengecatan Dinding / Wall Painting Work IV. Pekerjaan Tangga dari Lt-1 ke Lt.2 / Stair work from Lt-1 to Lt.2 a. Pekerjaan Dinding Lantai Kayu & Handel Ralling Tangga / Work of Wood Floor Walls & Handel Ralling Stairs b. Pekerjaan Ralling Kaca / Glass Ralling Stairs V. Pekerjaan Kolam / Pool Work a. Pemasangan Batu Hijau / Green Stone Installation b. Pekerjaan Tangga / Stair work c. Pekerjaan Gutter / Gutter Work VI. Pekerjaan Pintu & Jendela / Doors & Windows Work a. Pekerjaan Pintu & Jendela Kayu / Door & Window Wood b. Pekerjaan Kaca Mati / Dead Glass Work c. Pekerjaan Pembuatan Frame Kaca ( Nako & Kaca Mati) / Glass Frame Manufacturing Work (Nako & Dead Glass) d. Pemasangan Nako & Kaca Nako / Nako & Nako Glass Installation e. Pekerjaan Pintu & Jendela Alumunium / Door & Windows Alumunium VII. Pekerjaan Loster / Loster work a. Pemasangan Loster / Loster installation b. Pekerjaan Finis Loster / Finter Loster Job VIII. Pekerjaan Pergola / Pergola Work a. Pemasangan rangka pergola & talang / Installation of pergola & gutter frames b. Pekerjaan Pengecatan rangka baja pergola / Painting work of steel frame pergola c. Pemasangan sistem sambungan kayu & baja / Installation of wood & steel connection systems d. Pekerjaan kayu pergola / Wood working pergola e. Pemasangan Penutup Pergola / Installation of Pergola Cover IX. Pekerjaan Jalan Setapak / Walk Way Work a. Pekerjaan Tangga / Stair Work access to the 1 st floor
b. Pekerjaan Struktur Taman disamping Tangga / Garden Structure Work
beside Stairs X. Pekerjaan SepticTank & Peresapan / Septic Tank & Inflation Work a. Pekerjaan Galian / Excavation work b. Pekerjaan SepticTank & Peresapan / Septic Tank & Inflation Work XI. Pekerjaan Pagar / Boundry Wall Works a. Pekerjaan Pemasangan Btako / Brick Work b. Pekerjaan Batu Tempel / Stone cladding c. Pekerjaan Kaca / Clear Glass d. Pemasangan pintu pagar / Installation Of Turnstile XII. Pekerjaan Lanscape / Lanscape work a. Pekerjaan Levelling Tanah / Ground Leveling Jobs b. Pekerjaan Perosotan / c. Pekerjaan Saluran Drainase / Drainage d. Pekerjaan WWG e. Pekerjaan Taman di Atap / Green Roof f. Pekerjaan Taman Samping & jalan setapak / Side Garden Work & Walkway g. Pekerjaan Garden Kamar & di Bordes / Garden Work Rooms & in Bordes h. Pekerjaan Taman diparkiran / Parking Park XIII. Pekerjaan Parkiran / Parking Work a. Pemasangan Paving Block / Paving Block Installation b. Pekerjaan Kolam / Pool Work XIV. Pekerjaan Listrik / Electrical a. Bangunan / Building * Kipas / Fan * Lampu / Light * StopKontak & Saklar / Stop Contact & Switch b. Taman / Lanscape * Lampu / Light * StopKontak & Saklar / Stop Contact & Switch c. Kolam / Pool * Lampu / Light * StopKontak & Saklar / Stop Contact & Switch XV. Pekerjaan Perpipaan / Plumbing a. Bangunan / Building * Pipa air bersih / Water pipe * Pipa air kotor Padat / Solid water pipe * Pipa air kotor Cair / Liquid dirty water pipe * Pipa air hujan / Rainwater pipes b. Taman / Lanscape * Pipa Siram tanaman / Plant Pipe * Pipa Saluran & Drainase / Pipeline roof garden & Drainage c. Kolam / Pool * Pipa pengisi / Filler pipe * Pipa pembuang / Waster pipe Month March 2019 Month April 2019 Month May 2019 II III IV I II III IV I II III 8 & 15 16 & 23 24 & 31 1&7 8 & 15 16 & 23 24 & 30 1&7 8 & 15 16 & 23 May 2019 Month June 2019 Month July 2019 Month August IV I II III IV I II III IV I 24 & 31 1&7 8 & 15 16 & 23 24 & 30 1&7 8 & 15 16 & 23 24 & 31 1&7
i Raya Idul Fitri)
EID MUBARAQ (Hari Raya Idul Month August 2019 Month September 2019 Month October 2019 II III IV I II III IV I II III 8 & 15 16 & 23 24 & 31 1&7 8 & 15 16 & 23 24 & 30 1&7 8 & 15 16 & 23 ctober 2019 Month November 2019 Month December 2019 IV I II III IV I II III IV 24 & 31 1&7 8 & 15 16 & 23 24 & 30 1&7 8 & 15 16 & 23 24 & 31
The Construction of the Small House: A Simple and Useful Source of Information of the Methods of Building Small American Homes, for Anyone Planning to Build