You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

05.29.2009
1-3/C #4/0

SEPT 12
MAR 13
SCE "JOSE" SUBSTATION US-2 US-4 SCE "HILLGEN" SUBSTATION SCE "CADILLAC" SUBSTATION

DATE
SCE "RENO" SUBSTATION

LACSD
2 M SCE
LS LS
15KV

INITIALS
15KV 15KV
600A
CB-501 600A 600A M SCE
150E

BB

BB
66KV
66KV H
NO
7.5/8.4MVA
NO
7.5/8.4MVA 66/4.16KV 40A 15MVA 15MVA
66/4.16KV Z=8.4% M DA 66/12KV 66/12KV
Z=6.95% 150A

2/2.24MVA
12KV/ 0.5/0.56MVA
SJC EAST WRP SWBD 1C SJC WEST WRP SWBD 1A
9 4.16KV 12KV/

SUPERCEEDS SHEET E-6, 69D-g-119, REV 7


0.48KV

A B 3.75MVA
CB-52L2 9 9 12.47/
CB-52L1

REVISIONS
1
2000A 4.16KV
2000A TO TO
N.O.
1 RECLAIMED WATER MAIN CANYON
10
M3520 PUMP STATION 1 GAS WELL PHASE II
M SCE
(3) AIR COMPRESSOR STATION
2000/5A
2
M DA PHLF GTE - PHASE I (PERG) G
6 120/
(2)
PM 4200V TRANSFER
1 G
PM BLOCKS
BUS 1C: 4160V,2000A,3-PH,3W BUS 1A:4160V,2000A,3-PH 52-2
A B D 1
3000A

AS-BUILT
1

C D 12KV,3000A,3-PH,3W
CB-52T7 CB-52T4 CB-52C7 CB-52C8 CB-52C9
2
2000A 2000A 1200A 1200A 1200A
M

NO.
E D

1
2
3 D
52-4

DISTRICT NO. 00
52-3 52-1

NO.
A
G D 2000A
1200A 3000A
(N.C.)

I
4

NO./JOB
3-3/C 750 KCMIL 1

N
R
1750 900 900 1750
10MVA 55.6MVA

O
12KV/ F

DWG.
0.9PF
12-1/C

F
EAST EAST EAST WEST 4.16KV
9 12KV
1000 PAC 1 PAC 4 PAC 5 PAC 3

NO.
I
1-3/C #4/0

REFERENCE
KCMIL

FIELD BOOK
A
SJC EAST WRP SWBD 1D SJC EAST WRP SWBD 2D SJC WEST WRP SWBD 1B SJC WEST WRP SWBD 2B

C
1B 9A
2000A 2000A 2000A

,
Y
CB-52T1

2011

2011

2011

2011
2000A

T
BUS 2B: 4160V 4160V

DATE

DATE

DATE

DATE
N
BUS 1D: 4160V,2000A 3-PH,3W BUS 2D: 4160V,2000A 3-PH,3W BUS 1B: 4160V,2000A 3-PH,3W 4160V,2000A 3-PH,3W SWBD "B" SWBD "A" SWBD 3 4160V

SANITATION

OCT

OCT

OCT

OCT
U
O
8 1200A
1200A

C
F N.O.
CB- CB- CB- CB- CB- N.C.
CB- CB- CB- CB- CB- CB- CB- 1200A 1200A
52D7 52D8 52T5 52G3 52G4 52D7 52D8 52T2 52G1

S
5209 52T6 52T3
1200A 1200A 1200A 2000A 1200A 1200A 1200A 1200A 2000A 1200A
2000A

E
2000A
N.O. N.O. N.O. N.O. N.O. E
SWBD 5

BARNOCK
E
450 500 G

SIMS
N
MYCOM MYCOM 2.5MW

A
GAS GAS SOLAR

B.
COUNTY

M.
1750 1750 1750 1750 COM COM GAS

t
NO.2 NO.1 TURBINE

ne.dgn -- MODEL= Defaul


O
7

DESIGNED

REVIEWED
TO JAO & EAST EAST 6-1/C 500 KCMIL EAST EAST WEST WEST 450 450 450 450
WEST

CHECKED
L
CENTRAL PAC 2 PAC 3 GEN 3 GEN 4 PAC 1 PAC 2
GEN 1

DRAWN
PLANT 4.16KV,2500KW,8PF

F
4.16KV,2500KW,8PF(EA)

O
LF GAS BLOWERS

6
TRIP 3-1/C #3/0 3-1/C #3/0
US-3

US-1 SWBD MRF D


12 12

i
NE\E01_operonel
400A 400A 400A
C F 12KV N.O.
CB-2 CB-3 SWBD 7B:4.16KV, 1000A,3-PH,3W SWBD 7A: 4.16KV,1000A,3-PH,3W
3000A 1200A LS
N.O. 15KV
LS LS LS
1 600A
15KV 15KV 15KV
600A 600A 600A
4160V,3000A,3-PH,3W CB
1200A SCE 12

DIAGRAM

ST ONE_LI
-- 400-Full-Gray.tbl

1000MVA METER 100A


12/13.44MVA
2
4.16/12KV
150A 150A 150A
1.5/1.68MVA
3P 3P 3P 3P
12KV/
400A 400A 400A 400A

ELDMOD\E\Energy Recovery GRP_BARNOCK\PH PW R DI


0.48KV
10
CB-1
1200A

PUENTE HILLS LANDFILL


TEMPORARY TO MATERIAL

ONE-LINE
SCE 15KV RECOVERY FACILITY C

DISTRIBUTION
FEEDER

6-1/C 350 KCMIL 300 300 300 300

3-3/C 750 KCMIL


TO BL-2404 BL-2403 BL-2402 BL-2401

MH-119-06 RECLAIMED WATER


PUMP STATION 2

SJC-ICEP-PERG
1-3/C 500 KCMIL WBS

POWER
2-3/C 350 KCMIL NOTES:
MSTNPLOT:

1 PROPOSED & EXIST KEY-INTERLOCK SYSTEM: TO CLOSE CB-4 AT PERG,


MH-119-07
a) KEYS "A" AND "B" SHALL BE INSERTED IN TRANSFER PANEL LOCKS TO REMOVE KEY FOR LOCK "D" OR
b) KEY "C" SHALL BE INSERTED IN TRANSFER PANEL LOCK TO REMOVE KEY FOR LOCK "D" OR
c) KEY "E" SHALL BE INSERTED IN TRANSFER PANEL LOCK TO REMOVE KEY FOR LOCK "D"

PHLF GTE - PHASE II (ICEP) 2


KEYS "A" AND "B" SHALL NOT FIT INTO THE LOCKS "C" OR "D" OR "E". KEYS "C" AND "E" SHALL NOT FIT INTO LOCK "A" OR "B" OR "D".

B
2 400A NEUTRAL GROUNDING RESISTOR.

CB-7
CB-9 CB-10 CB-11 3 SCE REVENUE METER.
M 1200A
1200A 1200A 2000A
N.C. 4 EXISTING ISO POWER METER.

Q:\PH\FI
12KV,2000A
12KV,2000A,3-PH,3W,60HZ 3O,3W,60HZ 5 EXISTING SCE/NOBLE POWER SERVICE REVENUE METER.

6 WDAT SCE RULE 21 REQUIREMENTS. TRIP CB-1 AT US-1.

EXISTING KEY-INTERLOCK "F" WITH CB-3 IN UNIT SUBSTATION US-1 TO BE DUPLICATED ON CB-52D9 IN SWITCHBOARD
msims

7
E EAST SWBD 1D.
CB-8
CB-1 CB-2 CB-3 CB-4 CB-5 CB-6 1 2000A 8 ELECTRICAL INTERLOCK: TO CLOSE CB-52T7,EXISTING CB-1 AND CB-2 AT US-1 MUST BE CLOSED.
(N.O.)
AM

8A EXISTING KEY-INTERLOCK "B" TO BE DUPLICATED IN PROPOSED SWITCHBOARD.


6:09:36

ELECTRICL INERLICK THAT ONLY ALLOWS FIVE (5) OUT OF SIX (6) CIRCUIT BREAKERS (CB-52L1,CB-52T1,CB-52T3,CB-52T6,CB-52T4
9
AND CB-52L2) TO BE CLOSED. A
SCALE:

10 ELECTRICAL INTERLOCK: NONE


a) TO CLOSE CB-52L2, EXIST CB-1 OR CB-2 OR CB-52T7 MUST BE OPEN.
GEN 1 GEN 2 GEN 3 GEN 4 STATION GROUNDING SHEET
b) TO CLOSE EXIST CB-1,CB-52L2 MUST BE OPENED.
E-1
3/20/2013

(FUTURE) POWER TRANSFORMER 1 2 NO.


400A,10 SEC 11 EXISTING KEY-INTERLOCK "A" TO BE DUPLICATED IN PROPOSED SWITCHBOARD.
DWG.
IF THIS LINE IS NOT 1" LONG,
12 KEY-INTERLOCK. ONLY TWO SWITCHES CAN BE CLOSED AT THE SAME TIME.
WARNING
1"
NO.
69D-g-38
THEN DWG IS NOT TO SCALE.

2 2 1 2

You might also like