Tender Clarifications
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V52
Version date: 05-03-2019
2 . 0 2 Volume III, Dwg. No. Access to the referred grid is required Confirmed.
16070-2020, Overall from VHFL side. Please confirm that the
General Layout, Grid 055 access will be provided.
to 140
2 . 0 3 Volume II, Scope of Work, Please clarify the scope of Relocation Optional budget price for relocation
Relocation works of FEWA pipeline of 400mm diameter. to be given.
2 . 0 4 Volume III, Dwg. No. We refer to the drawing 16070-2193 for The size in plan will be 250 mm x
16070-2193 footing intermediate cable try support, 400 mm. Please refer to drawing
please advice the sizes of pedestal to no. 16070-2193 rev. C, in Annex C
be used. of Clarification no. 2.
2 . 0 5 General Please extend the bid submission date The bid submission date has been
by two (2) weeks from current extended by 1 week (17-03-2019).
submission date.
2 . 0 6 General Kindly provide us the topographic Please refer to drawing no. 16070-
survey from the existing ground level. 2234 rev A, in Annex D, for the
topographic survey of the corridor
between VHFL and Spare Area 4.
2 . 0 7 General We presume there is no material Please refer to the notes in
restriction of structure material except Approved Vendor List document,
India & China. Please confirm. which was provided through Annex
A of Clarification no. 1.
2 . 0 9 Vol. 1, 16070-TD-01-V13- Engineer quantity for Piperack structure No steel structure at grid 104-105.
rev02-Annex01 Prices of Grid 104 - 105 ( Loop 4 ) & Grid 287 - Please refer to revised drawing
190212 291 (Loop 10) not found. Please 16070-2112 rev. C and 16070-2113
provide the same. rev. C, in Annex C of clarification
no. 2.
2 . 1 0 Vol. 2, 16070-TD-01-V21- Bidder could not find any information Please refer to Vol. II, Conditions of
rev02 Conditions of about "the value of Existing Principal Contract, Section 19.2.4 and 19.2.6
Contract - 19.2.4 Surrounding Limit" in order to obtain the for the amount of insurance
Third Party Liability Insurance Premium required for the assets of VHFL,
cost. Please advise the same. PoF and FOIZ.
Page 2 of 5
Tender Clarifications
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V52
Version date: 05-03-2019
2 . 1 4 Vol. 2 Sub clause 2.3.2.8 Please provide the existing road level of Please refer to clarification
Grid 169 to 296. provided for Sr. no. 2.06.
Also, please provide the existing ground
level along the grid 169 to 296 which is
in the north of VHFL plot.
2 . 1 5 Vol. 2 Sub clause 2.3.2.3 Rearrangement of FOIZ safety wall over Existing piles to be demolished up
a length of approx. 40m , including to full depth. Pile length is
demolition of existing piles and pile maximum 8.00 m.
caps. Please refer to As-built drawing in
Please confirm the existing piles full Annex E of Clarification no. 2.
depth need to be demolished. If so,
Please provide the as built drawings for
the FOIZ safety wall with the piling
drawings/details. (For option -1 pricing)
Page 3 of 5
Tender Clarifications
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V52
Version date: 05-03-2019
Page 4 of 5
Tender Clarifications
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V52
Version date: 05-03-2019
2 . 2 5 Bill no.4, Item No We found some Quantities difference in Please refer to revised Schedule of
4.2.0.0.0 (Page No 9) BOQ, Bill no.4, Item No 4.2.0.0.0 (Page Prices in Annex G of this
No 9) Clarification no. 2. Schedule of
Prices is revised for the following
a) Grids 32 – 36 (Loop 2) BOQ Qty items:
75.204 MT – we are getting approx.103 New Item no. 3.3.0.3.5,
MT (Only Profiles). Item no. 4.2.0.0.4,
b) Grids 60 – 64 (Loop 3) BOQ Qty Item no. 4.2.0.1.0,
75.204 MT – we are getting approx.103 New Item no. 4.2.0.2.5.
MT (Only Profiles). Quantities estimated by the
c) Grid 288 – 290 (Loop 10) Steel Contractor shall be provided in the
Quantities (62.709 MT) missing in the
alloted column in Schedule of
BOQ.
Prices.
2 . 2 6 Vol. IV, Information Data Borehole data BH 36, 37, 40, 41 and 42 Please refer to Annex F of this
as mentioned in drawing no. 16070- Clarification no. 2 for the borehole
2030 is missing from Vol. IV. data.
Page 5 of 5
M.U.C. Engineering
Capt. Mousa Building, Ground Floor,
Hamad Bin Abdulla Road, Fujairah, UAE Page: Annex
P.O. Box 7718, Fujairah, UAE
Tel.: +971 (9) 2232033
Document ref.: 16070-TD-01-V52-rev.00; dated 05-03-2019
Fax: +971 (9) 2232006 Subject: PR#4 P3 TD - Clarification 2
E-mail: muceng@muc.ae
ANNEX C
M.U.C. Engineering
PORT OF FUJAIRAH
M.U.C. Engineering
PORT OF FUJAIRAH
M.U.C. Engineering
PORT OF FUJAIRAH
M.U.C. Engineering
PORT OF FUJAIRAH
M.U.C. Engineering
PORT OF FUJAIRAH
M.U.C. Engineering
PORT OF FUJAIRAH
M.U.C. Engineering
PORT OF FUJAIRAH
M.U.C. Engineering
PORT OF FUJAIRAH
M.U.C. Engineering
M.U.C. Engineering
Capt. Mousa Building, Ground Floor,
Hamad Bin Abdulla Road, Fujairah, UAE Page: Annex
P.O. Box 7718, Fujairah, UAE
Tel.: +971 (9) 2232033
Document ref.: 16070-TD-01-V52-rev.00; dated 05-03-2019
Fax: +971 (9) 2232006 Subject: PR#4 P3 TD - Clarification 2
E-mail: muceng@muc.ae
ANNEX D
M.U.C. Engineering
PORT OF FUJAIRAH
M.U.C. Engineering
PORT OF FUJAIRAH
M.U.C. Engineering
M.U.C. Engineering
Capt. Mousa Building, Ground Floor,
Hamad Bin Abdulla Road, Fujairah, UAE Page: Annex
P.O. Box 7718, Fujairah, UAE
Tel.: +971 (9) 2232033
Document ref.: 16070-TD-01-V52-rev.00; dated 05-03-2019
Fax: +971 (9) 2232006 Subject: PR#4 P3 TD - Clarification 2
E-mail: muceng@muc.ae
ANNEX E
AS BUILT DRAWING
GROUND LEVEL GROUND LEVEL GROUND LEVEL GROUND LEVEL
BOTTOM OF COLUMN CONCRETE BOTTOM OF COLUMN CONCRETE BOTTOM OF COLUMN CONCRETE BOTTOM OF COLUMN CONCRETE
Client
Design Consultant:
Contractor:
C O CODE
D E H.O. :
Drawing Title:
Purpose of Issue
FOR APPROVAL
Original Drawing
Sheet Size
Scale Sheet No.
A1 AS SHOWN 1 OF 1
Drawn by Checked by Approved by
CMW-11112-C001 .......... --
Drawing No. Revision No.
CCC-11112-C001-00-GN-S-1007 AB
Authorities Approval
BAR MARK PATTERN
REAR FRONT
AS BUILT DRAWING
GROUND LEVEL
Client
Design Consultant:
Contractor:
REAR ELEVATION
C O CODE
D E H.O. :
Drawing Title:
Purpose of Issue
FOR APPROVAL
FRONT ELEVATION
Original Drawing
Sheet Size
Scale Sheet No.
A1 AS SHOWN 1 OF 1
Drawn by Checked by Approved by
CMW-11112-C001 .......... --
Drawing No. Revision No.
CCC-11112-C001-00-GN-S-1001 AB
Authorities Approval
GROUND LEVEL AS BUILT DRAWING
Client
Design Consultant:
Contractor:
C O CODE
D E H.O. :
Drawing Title:
Purpose of Issue
FOR APPROVAL
Original Drawing
Sheet Size
Scale Sheet No.
A3 AS SHOWN 1 OF 1
Drawn by Checked by Approved by
CMW-11112-C001 .......... --
Drawing No. Revision No.
CCC-11112-C001-00-GN-S-1011 AB
Authorities Approval
N
NOTES:
- ALL DIMENSIONS SHOWN ARE IN m,
UNLESS OTHERWISE NOTED
- ALL GRADE ELEVATIONS SHOWN ARE IN m,
UNLESS OTHERWISE NOTED
Client
COMMAND OF MILITARY WORKS
P.O.Box...............Abu Dhabi
United Arab Emirates
Tel.....................
Fax No: .....................
Design Consultant:
M.U.C. Engineering
Contractor:
Drawing Title:
CAPPING BLOCK
PILE DETAILS
Authorities Approval
CMW-D005-DWG-Rev01-111127
All rights reserved. No part of this drawing may be reproduced or transmitted in any forms by any means without written permission of the copyright holder.
ISO 9001-2008
M.U.C. Engineering
Capt. Mousa Building, Ground Floor,
Hamad Bin Abdulla Road, Fujairah, UAE Page: Annex
P.O. Box 7718, Fujairah, UAE
Tel.: +971 (9) 2232033
Document ref.: 16070-TD-01-V52-rev.00; dated 05-03-2019
Fax: +971 (9) 2232006 Subject: PR#4 P3 TD - Clarification 2
E-mail: muceng@muc.ae
ANNEX F
BOREHOLE DATA
UTILITIES
TO BE
RELOCATED
ETS
ETS
TR
F
ETS
TR
F
TR
F
TR
F
TR F
ETS
TR F
TR F
GAS
GAS TR F
GAS TR
F
TR
ETS
GAS F
EDN GAS TR F
TAN GAS TR
F
EDN
ACC-FO TR
F
TAN GAS
EDN TR F
ETS
GAS
ACC-FO TAN TR
F
EDN GAS
TR
F
TAN GAS TR
F
ACC-FO EDN
TR
TAN GAS F
ETS EDN TR
F
GAS
TR F
ETS ACC-FO TAN
EDN TR F
GAS
ETS TR F
TAN
ACC-FO EDN GAS
TR
ETS TAN GAS F
EDN TR
F
GAS
ETS ACC-FO TR
TAN F
ETS EDN GAS TR
F
GAS TR
TAN EDN F
ETS TR
GAS F
TAN TR
F
ETS ACC-FO EDN GAS
TR F
ETS
TAN GAS TR F
ACC-FO EDN
GAS TR F
ETS TAN
GAS TR
ETS ACC-FO F
EDN GAS TR
F
ETS ETS
TAN GAS TR
F
ETS
ETS
ETS
ETS EDN TR ETS
TAN GAS F
TR
ETS ACC-FO EDN GAS F
TAN TR
F
ETS
ETS
ETS EDN GAS TR
TAN F
ETS DSL ACC-FO GAS TR F
ETS EDN
DSL TAN TR F
ETS
ETS
ETS ACC-FO EDN GAS TR F
DSL TAN
ETS ETS GAS
DSL
TR F
EDN
ETS DSL TAN GAS TR F
ETS TR F
ETS
EDN GAS
ETS ETS DSL ACC-FO TAN TR F
GAS
DSL EDN
ETS
TR F
ETS TAN
ETS ACC-FO GAS TR F
DSL EDN
ETS ETS TAN GAS TR F
DSL
ACC-FO EDN GAS TR F
DSL
ETS ETS TAN GAS TR
ETS
DSL F TR F
EDN GAS
ETS DSL TAN TR
ETS GAS F TR F
ETS
EDN
ETS DSL ACC-FO TAN TR F
ETS GAS TR F
DSL GAS
ETS TAN TR F
ACC-FO EDN GAS TR F
ETS DSL
ETS
EDN GAS TR F
DSL
DSL ACC-FO TAN TR
F
ETS GAS TR F
TAN EDN
ETS
ETS DSL GAS TR F
EDN TR F
DSL TAN GAS TR F
ACC-FO TR F
ETS DSL TAN EDN GAS TR F
ETS ACC-FO TAN EDN GAS TR F
ETS
DSL GAS TR
F
ETS EDN TR F
DSL ACC-FO TAN GAS TR F
ETS
DSL TAN EDN GAS TR F
ETS
TR F
ETS DSL EDN GAS TR
ACC-FO TAN GAS F TR F
DSL
ETS TAN EDN GAS TR F
DSL ACC-FO GAS
ETS
TR F
ETS TAN GAS TR F
DSL EDN TR F
ETS ACC-FO GAS
DSL EDN GAS TR F
ETS TAN TR
ETS
DSL EDN GAS F TR
DMS
ETS TAN F TR F
DSL ACC-FO EDN GAS
ETS TAN EDN GAS TR F
DSL ACC-FO TAN GAS TR F
EDN TR F
ETS DSL TAN GAS TR F
ACC-FO EDN GAS
DSL TAN GAS TR F
DSL EDN TR F
ETS TAN EDN GAS TR F
DSL ACC-FO TAN GAS TR F
ETS EDN GAS TR F
BH-36
DSL TAN
DSL ACC-FO EDN GAS TR F
TAN GAS TR F
DSL ACC-FO EDN GAS TR F
DSL TAN TR F
TAN EDN GAS
DSL EDN GAS TR F
DSL ACC-FO TAN GAS TR F
EDN TR F
DSL TAN GAS TR F
DSL ACC-FO EDN
TAN GAS TR F
DSL ACC-FO EDN GAS TR
F
DSL TAN EDN GAS TR
F
TAN TR F
DSL EDN GAS
DSL ACC-FO TAN GAS TR F
DSL EDN TR F
TAN GAS TR F
DSL ACC-FO EDN GAS TR F
DSL TAN GAS
DSL ACC-FO TAN GAS TR F
EDN GAS TR
F
DSL TR F
DSL EDN GAS TR F
ACC-FO TAN EDN GAS TR F
DSL TAN GAS
DSL ACC-FO EDN GAS TR F
TAN GAS TR F
DSL EDN GAS TR F
DSL ACC-FO TAN EDN GAS TR F
TAN
DSL EDN GAS TR F
DSL TAN TR F
DSL ACC-FO EDN GAS TR F
TAN EDN GAS TR F
DSL ACC-FO TAN GAS
DSL EDN GAS TR F
TAN GAS TR
F
DSL ACC-FO EDN GAS TR
F
DSL TAN EDN TR F
TAN GAS
DSL EDN GAS TR F
DSL ACC-FO TAN GAS TR F
EDN GAS TR F
DSL ACC-FO TAN EDN GAS TR F
DSL TAN GAS
ACC-FO EDN TR F
DSL TAN GAS TR
F
EDN GAS TR F
DSL TAN EDN GAS TR F
ACC-FO TAN
DSL EDN GAS TR F
DSL ACC-FO TAN GAS TR F
DSL EDN GAS TR F
DSL TAN EDN GAS TR F
ACC-FO TAN GAS TR F
DSL
DSL TAN EDN GAS TR F
DSL ACC-FO GAS TR F
EDN GAS TR F
DSL TAN EDN GAS TR F
DSL ACC-FO GAS
TAN EDN GAS TR F
DSL ACC-FO TAN TR
F
DSL EDN GAS TR F
TAN EDN GAS TR F
DSL GAS
DSL ACC-FO TAN EDN GAS TR F
TAN GAS TR F
DSL ACC-FO EDN GAS TR F
DSL TAN EDN TR F
ACC-FO TAN GAS
DSL EDN GAS TR F
DSL TAN GAS TR
F
DSL EDN GAS TR F
ACC-FO TAN EDN TR F
DSL TAN GAS
DSL EDN GAS TR F
DSL ACC-FO TAN GAS TR F
EDN GAS TR F
DSL ACC-FO TAN EDN GAS TR F
DSL TAN GAS
DSL EDN TR F
DSL TAN GAS TR F
DSL ACC-FO EDN GAS TR F
DSL TAN EDN GAS TR F
ACC-FO TAN GAS TR F
DSL EDN
ETS DSL ACC-FO TAN GAS TR F
ETS DSL EDN GAS TR
ETS TAN EDN GAS F TR F
ETS DSL TAN GAS TR F
DSL ACC-FO EDN GAS
ETS TAN GAS TR F
ETS DSL ACC-FO EDN GAS TR F
TAN EDN TR F
ETS DSL TAN GAS TR F
ETS DSL ACC-FO EDN GAS TR F
ETS TAN GAS
ETS DSL EDN GAS TR F
ETS ACC-FO TAN EDN GAS
56˚21′13.277"
25˚12′38.377"
TR F
ETS DSL TAN GAS TR F
ETS DSL EDN GAS TR F
ETS ACC-FO TAN GAS
DSL EDN GAS
ETS ACC-FO TAN EDN GAS TR
ETS DSL TAN F TR F
ETS DSL EDN GAS GAS
ETS TAN GAS TR F
ETS DSL ACC-FO EDN TR F
ETS TAN EDN GAS TR F
ETS DSL ACC-FO TAN TR F
DSL EDN GAS
ETS ACC-FO TAN EDN TR F
ETS DSL GAS TR
DSL TAN EDN GAS F TR
ETS DSL TAN GAS F TR F
ETS ACC-FO EDN TR F
ETS DSL TAN EDN GAS
ETS DSL GAS TR F
ETS ACC-FO TAN EDN GAS TR F
DSL TAN GAS TR F
DSL ACC-FO EDN TR F
ETS TAN GAS
ETS DSL EDN GAS TR F
ETS DSL TAN GAS TR F
ACC-FO EDN TR F
ETS TAN GAS TR F
ETS DSL ACC-FO EDN GAS
ETS DSL TAN EDN GAS TR F
DSL ACC-FO TAN TR
F
ETS DSL EDN GAS TR
ETS DSL TAN GAS F TR F
ETS EDN
DSL ACC-FO TAN GAS TR F
ETS DSL EDN GAS TR F ETS
DSL ACC-FO TAN EDN GAS TR F
TAN GAS TR F
DSL EDN
DSL ACC-FO TAN GAS TR F
EDN GAS TR
F
DSL TAN GAS TR
F
DSL ACC-FO EDN GAS TR F
TAN EDN
ETS
EDN TR F
DSL ACC-FO TAN GAS TR F
DSL EDN GAS
DSL ACC-FO TAN EDN TR F
DSL GAS TR
F
DSL TAN EDN GAS TR
F
DSL TAN GAS TR F
DSL ACC-FO EDN GAS
DSL TAN EDN TR F
DSL ACC-FO GAS ETS TR F
DSL TAN EDN TR F
DSL TAN GAS TR F
ACC-FO EDN GAS
DSL TAN GAS TR F
DSL EDN GAS TR
F
ACC-FO TAN EDN TR
F
DSL TAN GAS TR F
EDN GAS
ETS
TR F
DSL TAN EDN GAS TR F
ACC-FO EDN GAS TR F
DSL TAN
DSL GAS TR F
ACC-FO TAN EDN GAS TR
F
DSL TR F
ACC-FO EDN GAS TR F
DSL TAN EDN GAS
TAN GAS TR F
DSL ETS ACC-FO EDN TR F
DSL TAN GAS TR F
ETS
EDN GAS TR F
DSL TAN EDN GAS
DSL ACC-FO TAN TR F
DMS
EDN GAS TR
F
DSL ACC-FO TAN GAS TR
F
DSL EDN TR F
DSL ACC-FO TAN EDN GAS
GAS TR F
DSL TAN GAS TR F
DSL TAN EDN GAS TR F
ACC-FO GAS TR F
ETS
DSL EDN
ETS
TAN EDN
DSL ACC-FO TAN
DSL EDN
ETS
ACC-FO TAN
DSL
TAN
DSL ACC-FO
DSL
DSL
BH-37
56˚21′16.563"
25˚12′38.1034"
REFINERY
/ IPIC
STOCKPILE
ARE A
4
4
Bore Hole
(Depth = 15 m)
DESCRIPTION
3
2
1
0
-1
-2
-3
-4
-5
--6
7
Hole
SYMBOL UNIT
-8-9
0
--1101
MOT Area
-1
2
-13
-14
-15
QUANTITIES
Pipeline Area
-16
-1
7
2
Total
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 15.45
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
0.00
3.0
1.0
1.10
1.10
1.10 m to 1.90 m - Light brownish grey,
gravelly, very silty, fine to medium, SAND.
B2
2.0 1.90
2.0 1.90 m to 2.45 m - Light reddish brown,
1.90
2.45
2.45
2.45 m to 2.90 m - Grey, very silty, fine to
B4
medium, SAND with shell fragments.
1.0 2.90
3.0 2.90 m to 4.40 m - Dense, grey, slightly silty,
2.90
3.40
S6 39 13 19 20
3.85
0.0
4.0
4.40
4.40 m to 5.40 m - Medium dense, light grey,
slightly silty, fine, SAND. S7 29 13 14 15
4.85
-1.0
5.0
5.40
5.40 m to 8.40 m - Medium dense, light grey,
silty, gravelly, fine to medium, SAND with shell S8 27 16 14 13
fragments. -2.0
5.85
6.0
6.40
S9 23 12 11 12
6.85
-3.0
7.0
7.40
S10 25 12 12 13
7.85
-4.0
8.0
8.40
8.40 m to 9.40 m - Medium dense, grey,
slightly gravelly, silty, fine to medium, SAND S11 29 7 13 16
with shell fragments. -5.0
8.85
9.0
9.40
9.40 m to 11.40 m - Loose to dense, light grey
to grey, slightly silty, fine to medium, SAND. S12 8 2 4 4
9.85
-6.0
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 15.45
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
10.0 9.40 m to 11.40 m - Loose to dense, light grey
to grey, slightly silty, fine to medium, SAND.
10.40
S13 39 16 18 21
10.85
-7.0
11.0
11.40
11.40 m to 13.40 m - Dense, grey, slightly
gravelly, silty, fine to medium, SAND with shell S14 34 12 17 17
fragments. -8.0
11.85
12.0
12.40
S15 34 13 14 20
12.85
-9.0
13.0
13.40
13.40 m to 15.45 m - Soft to firm, light grey to
grey, slightly gravelly, very sandy, SILT. S16 8 4 4 4
13.85
-10.0
14.0
14.40
S17 5 3 3 2
14.85
-11.0
15.0
15.00
S18 9 4 4 5
At 15.45 m - End of Borehole. 15.45
-12.0
16.0
-13.0
17.0
-14.0
18.0
-15.0
19.0
-16.0
20.0
Project : Topo Survey and Geotechnical Investigation, M Project
Remark: Logged by: MSM
(Surface Facilities and Pipelines)
50* means actual N value is greater
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MA
Client : SKEC
Plate: A4.36.2
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-37
Equipment: F-100 Start Date: 29/07/2018 Coordinates: E 434984m N 2788422m
End Date : 31/07/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 5.07 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 15.45
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
0.00
B3
2.0 2.00
3.0 2.00
2.00 m to 2.50 m - Light brown to brown,
slightly silty, slightly gravelly, fine to medium, B4
SAND. 2.50
2.50
2.50 m to 3.00 m - Medium dense, light brown
to brown, slightly silty, fine to medium, SAND S5 14 5 5 9
3.0 with rare shell fragments. 2.95
2.0 3.00
4.0
1.0 4.00
S7 41 14 17 24
4.45
3.15 30/07
5.0
0.0 5.00
5.00 m to 7.50 m - Medium dense, light grey,
silty, very gravelly, fine to medium, SAND with S8 23 11 10 13
shell fragments. 5.45
6.0
-1.0 6.00
S9 22 12 11 11
6.45
7.0
-2.0 7.00
S10 20 8 11 9
7.45
S11 34 17 15 19
8.45
9.0
-4.0 9.00
S12 40 14 19 21
9.45
10.0
Project : Topo Survey and Geotechnical Investigation, M Project
Remark: Logged by: MSM
(Surface Facilities and Pipelines)
50* means actual N value is greater
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MA/MMK
Client : SKEC
Plate: A4.37.1
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-37
Equipment: F-100 Start Date: 29/07/2018 Coordinates: E 434984m N 2788422m
End Date : 31/07/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 5.07 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 15.45
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
10.00
10.0 7.50 m to 12.00 m - Dense, light grey to grey, -5.0
11.0
-6.0 11.00
S14 45 12 22 23
11.45
12.0
-7.0 12.00
12.00 m to 13.00 m - Dense, light brown to
brown, silty, slightly gravelly, fine to medium, S15 42 12 20 22
SAND. 12.45
3.60 31/07
13.0
-8.0 13.00
13.00 m to 14.00 m - Stiff, grey, slightly
gravelly, slightly sandy, CLAY with shell S16 12 8 6 6
fragments. 13.45
14.0
-9.0 14.00
14.00 m to 15.45 m - Medium dense, grey to
dark grey, silty, gravelly, fine, SAND with rare S17 22 7 12 10
shell fragments. 14.45
15.0
-10.0 15.00
S18 17 7 7 10
At 15.45 m - End of Borehole. 15.45
16.0
-11.0
17.0
-12.0
18.0
-13.0
19.0
-14.0
20.0
Project : Topo Survey and Geotechnical Investigation, M Project
Remark: Logged by: MSM
(Surface Facilities and Pipelines)
50* means actual N value is greater
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MA/MMK
Client : SKEC
Plate: A4.37.2
Job No. : PU-18-0037-NE
SUMMARY OF LABORATORY TEST RESULTS
Client : SKEC
Project : Topo Survey and Geotechnical Investigation, M Project (Surface Facilities and Pipelines)
Location : Fujairah
Lab. Report No. :
Report Date :
Page 9 of 11
Sample Identification Density Particle Size Distribution Atterberg limits Chemical Analysis Compaction CBR Shear Box Triaxial Consolidation Rock Properties
Water Water Soluble Carbonate Content Organic Gypsum Electrical Type MDD OMC Max. Peak Type Angle of Initial Compr. Est. Point
B.H. Sample Sample Sample Top Specimen Moisture Bulk Dry Particle Silt/ <425 Method Chloride Sulphate Chloride Sulphate as as matter Content Conductivity (Rammer value Permeability Cohesion Angle of Shear void index Precon UCS E Poissons Slake Splitting Load
No. No. Type Depth (m) Depth (m) Content Density Density Density Gravel Sand Clay LL PL PI mm of *Class as Cl as SO3 as Cl as SO3 pH CO2 CaCO3 content of Weight) Intercept Resist. Resist. ratio Cc solidation Modulus Ratio Durability tensile Index
Preparation Water c' f' cu f' e0 pressure Index strength IS/(50)
(%) (Mg/m³) (Mg/m³) (Mg/m³) (%) (%) (%) (%) (%) (%) (%) (%) (g/L) (%) (g/L) (%) (%) (%) (%) (ms) (kg) (Mg/m³) (%) (%) (kPa) (°) (kPa) (°) (MPa) (MPa) (MPa) (%) (MPa) (MPa)
4.58
FME Project No.PU-18-0037-NE Note: Sample Type; D=small disturbed sample,B=bulk disturbed sample, C=core sample; W=water sample [* Atterberg Limits,NP = Non Plastic] Authorised by: J. De Leon, Laboratory Supervisor Plate: B1.9
SUMMARY OF LABORATORY TEST RESULTS
Client : SKEC
Project : Topo Survey and Geotechnical Investigation, M Project (Surface Facilities and Pipelines)
Location : Fujairah
Lab. Report No. :
Report Date :
Page 10 of 11
Sample Identification Density Particle Size Distribution Atterberg limits Chemical Analysis Compaction CBR Shear Box Triaxial Consolidation Rock Properties
Water Water Soluble Carbonate Content Organic Gypsum Electrical Type MDD OMC Max. Peak Type Angle of Initial Compr. Est. Point
B.H. Sample Sample Sample Top Specimen Moisture Bulk Dry Particle Silt/ <425 Method Chloride Sulphate Chloride Sulphate as as matter Content Conductivity (Rammer value Permeability Cohesion Angle of Shear void index Precon UCS E Poissons Slake Splitting Load
No. No. Type Depth (m) Depth (m) Content Density Density Density Gravel Sand Clay LL PL PI mm of *Class as Cl as SO3 as Cl as SO3 pH CO2 CaCO3 content of Weight) Intercept Resist. Resist. ratio Cc solidation Modulus Ratio Durability tensile Index
Preparation Water c' f' cu f' e0 pressure Index strength IS/(50)
(%) (Mg/m³) (Mg/m³) (Mg/m³) (%) (%) (%) (%) (%) (%) (%) (%) (g/L) (%) (g/L) (%) (%) (%) (%) (ms) (kg) (Mg/m³) (%) (%) (kPa) (°) (kPa) (°) (MPa) (MPa) (MPa) (%) (MPa) (MPa)
FME Project No.PU-18-0037-NE Note: Sample Type; D=small disturbed sample,B=bulk disturbed sample, C=core sample; W=water sample [* Atterberg Limits,NP = Non Plastic] Authorised by: J. De Leon, Laboratory Supervisor Plate: B1.10
PARTICLE SIZE DISTRIBUTION- REPORT
Page 52 of 75
Client : SKEC
Project : Topo Survey and Geotechnical Investigation, M Project (Surface Facilities and Pipelines)
Location : Fujairah
Laboratory Information
0.600
0.425
0.150
0.075
4.75
2.36
1.18
37.5
12.5
100
9.5
75
50
25
19
100
90
80
70
60
Percentage Passing
50
40
30
20
10
0
Sand
Gravel Silt Clay
coarse medium fine
75 4.75 2.00 0.425 0.075 0.00 0.001
Particle Size - mm
Borehole Sample No. Depth (m) Curve Mass Gravel Sand Silt/Clay D10 Dmax Cu Cc
BH36 B2 1.10 to 1.90 101.1g 12% 62% 26% 0.0038 25 67.00 8.46
BH36 B4 2.45 to 2.90 102g 0% 78% 22% 0.0147 9.5 17.00 3.56
BH36 S6 3.40 to 3.85 X 208.2g 3% 92% 5% 0.1602 12.5 3.54 0.90
BH36 S8 5.40 to 5.85 + 201.4g 20% 72% 8% 0.0877 19 15.00 0.51
Laboratory Information
0.600
0.425
0.150
0.075
4.75
2.36
1.18
37.5
12.5
100
9.5
75
50
25
19
100
90
80
70
60
Percentage Passing
50
40
30
20
10
0
Sand
Gravel Silt Clay
coarse medium fine
75 4.75 2.00 0.425 0.075 0.00 0.001
Particle Size - mm
Borehole Sample No. Depth (m) Curve Mass Gravel Sand Silt/Clay D10 Dmax Cu Cc
BH36 S11 8.40 to 8.85 212g 4% 86% 10% - 12.5 - -
BH36 S13 10.40 to 10.85 173.1g 2% 92% 6% 0.0852 9.5 3.03 1.17
BH36 S15 12.40 to 12.85 X 170.1g 4% 87% 9% 0.0786 9.5 4.34 1.17
Laboratory Information
0.600
0.425
0.150
0.075
4.75
2.36
1.18
37.5
12.5
100
9.5
75
50
25
19
100
90
80
70
60
Percentage Passing
50
40
30
20
10
0
Sand
Gravel Silt Clay
coarse medium fine
75 4.75 2.00 0.425 0.075 0.005 0.001
Particle Size - mm
Borehole Sample No. Depth (m) Curve Mass Gravel Sand Silt/Clay D10 Dmax Cu Cc
BH36 S16 13.40 to 13.85 83.6g 8% 45% 47% 0.0022 12.5 58.00 0.99
BH36 S17 14.40 to 14.85 99.8g 7% 55% 38% 0.0021 9.5 83.00 2.88
Laboratory Information
0.600
0.425
0.150
0.075
4.75
2.36
1.18
37.5
12.5
100
9.5
75
50
25
19
100
90
80
70
60
Percentage Passing
50
40
30
20
10
0
Sand
Gravel Silt Clay
coarse medium fine
75 4.75 2.00 0.425 0.075 0.005 0.001
Particle Size - mm
Borehole Sample No. Depth (m) Curve Mass Gravel Sand Silt/Clay D10 Dmax Cu Cc
BH37 B3 0.70 to 2.00 13104g 44% 49% 7% 0.088 50 73.00 0.11
BH37 S5 2.50 to 2.95 104.2g 6% 78% 16% 0.0243 12.5 10.00 2.14
BH37 S7 4.00 to 4.45 X 137.2g 5% 88% 7% 0.1066 12.5 3.94 1.05
BH37 S9 6.00 to 6.45 + 161.8g 29% 65% 6% 0.1205 19 25.00 0.91
Laboratory Information
0.600
0.425
0.150
0.075
4.75
2.36
1.18
37.5
12.5
100
9.5
75
50
25
19
100
90
80
70
60
Percentage Passing
50
40
30
20
10
0
Sand
Gravel Silt Clay
coarse medium fine
75 4.75 2.00 0.425 0.075 0.005 0.001
Particle Size - mm
Borehole Sample No. Depth (m) Curve Mass Gravel Sand Silt/Clay D10 Dmax Cu Cc
BH37 S12 9.00 to 9.45 198.4g 18% 75% 7% 0.0969 19 16.00 0.63
BH37 S15 12.00 to 12.45 167.9g 1% 93% 6% 0.1216 12.5 2.68 1.02
BH37 S16 13.00 to 13.45 X 64.6g 17% 31% 52% - 19 - -
BH37 S17 14.00 to 14.45 + 102.1g 6% 77% 17% 0.0269 12.5 9.63 1.88
Laboratory Information
Test Result
Bore Hole Sample FME Depth Sample Moisture Bulk Dry Particle
No. No. Sample (m) Type Content Density Density Density
No. % Mg/m3 Mg/m3 Mg/m3
Notes:
Moisture content : ASTM D 2216-2010
Bulk density : ASTM D7263-09
Dry density : ASTM D7263-09
Particle density (SG) : ASTM D 854-14 Method A
Sample Type; D = small disturbed sample, U = undisturbed sample, C = core sample
Laboratory Information
Test Result
Bore Hole Sample FME Depth Sample Moisture Bulk Dry Particle
No. No. Sample (m) Type Content Density Density Density
No. % Mg/m3 Mg/m3 Mg/m3
Notes:
Moisture content : ASTM D 2216-2010
Bulk density : ASTM D7263-09
Dry density : ASTM D7263-09
Particle density (SG) : ASTM D 854-14 Method A
Sample Type; D = small disturbed sample, U = undisturbed sample, C = core sample
Laboratory Information
Test Result
Bore Sample FME Depth Type Sample Natural Passing Liquid Plastic Plasticity Plasticity
Hole No. Sample (m) History Moisture 425mm Limit Limit Index Class
No. No. Content sieve D 2487
(%) (%) (%) (%)
Laboratory Information
Test Result
80 125
100
60 stage 3
Shear Stress (kPa)
75
40
stage 3
stage 2 50
20
stage 1 stage 2
25
stage 1
0 0
0.0 2.0 4.0 6.0 8.0 0 25 50 75 100 125
Note : Graphical printout may not produce a true 1:1 axis ratio
Authorised by: R. Alay
Laboratory Manager
Test Result
Consolidation Stage
0.10
0.10 0.20
0.20
Settlement (mm)
Settlement (mm)
Settlement (mm)
0.20 0.40
0.30
0.50
0.40 0.80
stage 3
stage 1 0.60
0.50 stage 2 1.00
0.70
Square Root Time (minutes) Square Root Time (minutes) Square Root Time (minutes)
Shearing Stage
Change in Specimen Thickness During Change in Specimen Thickness During Change in Specimen Thickness During
Shear Shear Shear
-0.02 0.00 0.00
0.03
0.10 0.10
Vertical Displacement (mm)
0.08
0.13
0.20 0.20
0.18
0.23 0.30 0.30
0.28
0.40 0.40
0.33
0.38
0.50 stage 2 0.50
0.43 stage 1
stage 3
0.48 0.60 0.60
0 2 4 6 8 10 0 2 4 6 8 10 0 2 4 6 8 10
Horizontal Displacement (mm) Horizontal Displacement (mm) Horizontal Displacement (mm)
Laboratory Information
Test Result
80 125
100
60 stage 3
Shear Stress (kPa)
75
40
stage 3
stage 2 50
20
stage 1 stage 2
25
stage 1
0 0
0.0 2.0 4.0 6.0 8.0 0 25 50 75 100 125
Note : Graphical printout may not produce a true 1:1 axis ratio
Authorised by: R. Alay
Laboratory Manager
Test Result
Consolidation Stage
Settlement (mm)
Settlement (mm)
0.60
0.40
0.60 0.80
0.50
0.80 1.00
0.60
1.20
0.70 1.00
stage 1 1.40
0.80 stage 2 stage 3
1.20
0.90 1.60
Square Root Time (minutes) Square Root Time (minutes) Square Root Time (minutes)
Shearing Stage
Change in Specimen Thickness During Change in Specimen Thickness During Change in Specimen Thickness During
Shear Shear Shear
-0.02 0.00 0.00
0.20 0.05
0.18
Vertical Displacement (mm)
0.40 0.10
0.38
0.15
0.60
0.58 0.20
0.80
0.78 0.25
1.00
0.30
0.98
1.20 0.35 stage 3
1.18 stage 2
stage 1 1.40 0.40
1.38 1.60 0.45
0 2 4 6 8 10 0 2 4 6 8 10 0 2 4 6 8 10
Horizontal Displacement (mm) Horizontal Displacement (mm) Horizontal Displacement (mm)
Laboratory Information
Test Result
Bore Hole Sample Depth Sample FME % by Chloride (as Cl) Sulphate (as SO3) pH Electrical Carbonate Organic
No. No. Type Sample mass water water Conductivity as as Content
< 2mm Water Water
No. soluble soluble of CO2 CaCO3
(m) % % g/L g/L Water (ms) % % %
Notes:
Chloride content (Cl) of water : BS 1377: Pt 3: 1990 Cl 7 AMD 9028-96
Chloride content (Cl) of soil, water soluble : BS 1377: Pt 3: 1990 Cl 7.2 AMD 9028-96 (2:1 water:soil extract)
Chloride content (Cl) of groundwater : BS 1377: Pt 3: 1990 Cl 7.2 AMD 9028-96
Sulphate content (SO3) of water : BS 1377: Pt 3: 1990 Cl 5.5 AMD 9028-96
Sulphate content (SO3) of soil, water soluble : BS 1377: Pt 3: 1990 Cl 5.3 AMD 9028-96 (2:1 water:soil extract)
Sulphate content (SO3) of groundwater : BS 1377: Pt 3: 1990 Cl 5.4 AMD 9028-96
pH determination : BS 1377: Pt 3: 1990 Cl 9.5 & Cl 9.0 AMD 9028-96
Carbonate content (CO2) of soil : BS 1377: Pt 3: 1990 Cl 6.3 AMD 9028-96 (% by dry mass)
Organic matter content of soil : BS 1377: Pt 3: 1990 Cl 3 AMD 9028-96 (% by dry mass in fraction < 2mm)
Electrical Conductivity of Water : BS 1427: Pt 3: 1990 Cl 5.2
Sample Type; D = small disturbed sample, U = undisturbed sample, C = core
sample, B = bulk disturbed sample, W = water sample Authorised by : J. De Leon
Laboratory Supervisor
Laboratory Information
Lab Report No.: -
Date test started : 26/06/2018 Report Date: -
Date test completed : 22/07/2018
Test location : Fugro Middle East, Main laboratory, P.O.Box 2863 Dubai
Test Result:
Sample FME Sample Depth Natural Moisture Bulk Density Dry Density Permeability
Borehole No.
No. No. (m) Content (%) (Mg/m³) (Mg/m³) (m/sec.)
BH05 B2 18-1333 0.70-1.50 3.2 2.00 1.94 4.84E-06
BH06 B3 18-1201 0.20-0.50 5.2 2.00 2.03 1.47E-05
BH09 B2 18-1207 0.90-1.50 11.2 2.00 2.03 1.80E-05
BH11 B1 18-1334 0.20-0.65 0.8 2.22 2.20 7.29E-07
BH12 B1 18-1142 0.00-1.00 3.3 2.00 1.93 5.67E-06
BH14 B2 18-1336 0.30-1.50 2.0 2.00 1.96 6.95E-06
BH16 B2 18-1485 0.30-0.70 3.9 2.23 2.15 6.39E-09
BH18 B1 18-1489 0.00-0.90 2.0 1.96 1.92 1.32E-07
BH21 B1 18-1506 0.00-0.80 0.7 2.19 2.17 1.56E-07
BH22 B2 18-1487 0.30-1.50 3.6 1.99 1.92 4.65E-03
BH24 B3 18-1162 0.70-1.20 16.7 2.00 2.05 4.83E-06
BH26 B2 18-1164 0.30-0.70 2.2 2.18 2.14 3.18E-08
BH28 B2 18-1166 0.30-0.80 4.3 2.11 2.02 3.50E-08
BH30 B3 18-1168 0.80-1.50 9.9 2.00 1.82 1.85E-05
BH32 B3 18-1192 0.65-1.20 4.9 2.00 1.91 4.91E-06
BH33 B4 18-1143 0.90-1.50 14.0 2.00 1.75 7.25E-06
BH37 B2 18-1541 0.30-0.70 4.2 1.88 1.8 1.36E-07
J. De Leon
Authorised by: Laboratory Supervisor
PU-18-0037-NE
Plate: B2
Fujairah, UAE
Abstract:
Fugro was commissioned by SK Engineering and Construction Co., Ltd. to perform a geotechnical investigation
for the proposed Seepage Water Disposal Pipeline, M Project, Fujairah UAE. The Client’s agreement with Fugro
is under the optional scope of the signed service agreement dated 19 March, 2018 with reference subcontract no:
SR17137D-L00B-501
The scope of geotechnical investigation work for proposed seepage water disposal pipeline, included drilling
exploratory rotary boreholes, laboratory testing on selected soil and rock samples, and factual reporting.
This report presents information from the completed field works, in situ and laboratory testing. Its objective is to
assess the sub-surface conditions with respect to the existing geological and geotechnical features at the
proposed location(s).
Disclaimer:
This investigation identifies subsurface conditions only at the points where sampling and testing have been carried
out. Interpretation of the subsurface conditions mentioned herein, are based solely on the findings of the
investigation works conducted on site at the time of the study. Subsurface conditions throughout the site, if stated,
are determined from extrapolating the results at these points through applying the best professional opinion and
engineering judgment.
Changes brought to site and its vicinity due to construction, manmade or natural events, following the time of study
are not within the scope of this report. Should this occur, Fugro should be notified immediately to discuss the
necessity of assessing the conclusions reported.
Issue No. Date Report Status Prepared Checked Approved
By By By
01 14/11/2018 Geotechnical Factual Report MU AMS AMS
GEOTECHNICAL FACTUAL REPORT
Geotechnical Investigation for Seepage Water Disposal Pipeline, M Project, Fujairah – UAE
CONTENTS
1. INTRODUCTION 1
1.1 General 1
1.2 Scope of work 1
1.3 Project responsibilities 1
1.4 Guidelines on Use of Report 1
2. SITE DESCRIPTION 2
2.1 Location 2
3. GEOLOGY 2
3.1 Regional geology of Fujairah 2
4. FIELDWORK 3
4.1 General 3
4.2 Surveying test locations 3
4.3 Exploratory boreholes 3
4.4 Standard Penetration Test (SPT) 4
4.5 Sampling, handling and transporting of samples 4
4.5.1 Soil sampling 4
4.5.2 Rock sampling 4
4.5.3 Handling and transport of samples 4
4.5.4 Handling of samples at laboratory 5
4.5.5 Logging 5
5. LABORATORY TESTING 6
6. SITE CHARACTERISATION 7
6.1 General subsurface conditions 7
7. GROUNDWATER 8
8. REPORT LIMITATIONS 9
LIST OF TABLES
APPENDICES
1) The report issue number is the same as the highest issue number of any individual page.
2) Pages of this report are at issue ‘01’ except those pages listed above.
A Field Testing
- Borehole Logs MB MU
- Logging Soil and Rock MS MU
C Core Photographs MU MU
Person(s):
AMS: Alexis Maria Spencer
BD: Bryan Dimaano
ES: Elpideo Salvador, Jr.
JDL: Jennifer De Leon
MB: Melanie Bier
MS: Muhammed Saleem
MU: Muhammad Usman
ABBREVIATIONS
1. INTRODUCTION
1.1 General
Fugro was commissioned by SK Engineering and Construction Co., Ltd. to carry out a
geotechnical investigation for the proposed Seepage Water Disposal Pipeline, M Project in
Fujairah, UAE.
The field investigation work was conducted during the period from 14th October 2018 to 30th
October 2018. The overall scope of geotechnical investigation for the proposed Seepage
Water Disposal Pipeline, M Project included: drilling of exploratory rotary boreholes of 35.0m
depths, performing of physical and mechanical laboratory testing on selected soil and rock
samples for geotechnical purposes and factual reporting of the geotechnical investigation.
• Drilling three (03 nos.) soil/rock sampling boreholes to depths of 35.0m below existing
ground level;
− In general the borehole investigation includes:
o SPT testing in soil;
o Rotary coring and sampling in rock;
• Perform geotechnical laboratory tests on recovered selected soil/rock samples from
the boreholes to evaluate the physical and mechanical properties of the strata
encountered;
• Prepare a factual geotechnical investigation report presenting the results of field and
laboratory test results.
All site investigation works and laboratory testing are conducted in accordance to the relevant
British or ASTM standards.
Fugro understands that this report will be used to facilitate formulating recommendations for
the foundation design of the planned structures. Information provided herein may not be
relevant if the purpose for which the report was prepared or the Client’s proposed
development or activity change.
2. SITE DESCRIPTION
2.1 Location
The proposed M project site, is located adjacent to Gulf petroleum oil terminal, which is
approximately 10km from Fujairah city along the Khor Fakhan road in Fujairah, United Arab
Emirates as shown on Plate 1
3. GEOLOGY
The rocks of the early crustal section of the ophiolite were formed at around 96 Ma (Dilek and
Flower, 2003). Magma from the deep in the mantle moved upwards along conduits through
the upper mantle, melting orthopyroxene in the process and leaving behind a network of
refractory dunite veins (Nicolas, 1986). The magma collected in the magma chambers where
layered gabbros and high level gabbros of the lower ocean crust were formed. Magma raised
from the magma chambers, through vertical fissures produced the sheeted dyke complex and
was erupted onto the ocean floor as pillows basalts.
During the Quaternary, there has been a complex interplay between fluvial, aeolian and
marine processes, driven principally by climatic changes associated with high latitude
glaciation. A more humid climate in the eastern Quaternary led to the deposition of the coarse
alluvial gravels in many of the wadis and the development of extensive alluvial fans.
Fluctuations of sea level during this period deposited the marine raised beach deposits during
the high sea-level stands.
The coastal section of the Fujairah sheet is made up of a system of coastal barriers, and
beach deposits (recent and older). The marine deposits comprise typically of shelly, well
sorted carbonate beach sand, forming a variably sloping bank into ocean. Terrigenous
material is a locally important component, where black, heavy –mineral-rich sands are typical.
The sediment consists of medium to coarse grained, shells and ooliths with a considerable
lithic component (Thomas et al., 2006).
4. FIELDWORK
4.1 General
The field investigation work was conducted during the period from 14th October 2018 to 30th
October 2018. Three (03 nos.) boreholes were drilled within the proposed project site at
locations provided by the Client. All test locations are provided in Plate 2 and their coordinates
presented in Plate 3.
Coordinates are referenced to UTM, Grid Zone 40, WGS 84 Datum, whereas elevations are
reference to the Fujairah Municipality Datum (FMD).
Seepage Water
BH-41 +4.98 35.00
Disposal Pipeline
All the fieldwork was performed by experienced Fugro personnel, in general accordance with
the “British Standard BS 5930: 2015 Code of Practice for Site Investigations” under the
supervision of an experienced Fugro geologist. Details of the coring techniques, in situ testing,
sampling and handling of samples follow in the subsequent sections.
Logging of soil and rock samples/cores was undertaken by experienced geologists on-site.
After logging of each borehole, core boxes were delivered to Fugro office in Dubai and core
samples from rock drilling were photographed at Fugro office.
Field test data is included as Appendix A of the report. Symbol legend for Geotechnical logs
and a summary of soil and rock definitions are included as Plates A1.1 to A1.2 and A2
respectively.
Borehole logs are presented as Appendix A4, while geological cross section from the borehole
logs is presented as Appendix A3.
SPT’s were conducted in accordance with British Standard BS 1377: Part 9: 1990, “Methods
of test for soils for civil engineering purposes”. SPT ‘N’ value, number of blows and penetration
achieved for each 7.5cm were recorded and are presented on the borehole logs. In very dense
strata, SPTs were terminated after achieving 50 blows, and the total penetration was recorded
where less than 300mm.
Fresh water was used as a flushing medium to facilitate drilling and to flush out cuttings.
Core samples were transferred from the core barrels to purpose-built plastic and wooden core
boxes and consecutive core runs were separated using labelled core spacers.
• Upon retrieval, split-spoon samples were measured for the length of sample recovered
and preserved in airtight plastic bags.
• Samples were labelled to include date, borehole number, sample number, and the
depths from which the sample was obtained.
• Rock core samples were placed inside core boxes with each sample and each core
run separated by a plastic or wooden spacer with depth marked on it.
• Core samples were wrapped with Polyethylene wrap to preserve moisture content.
• The core boxes were transported upon completion of each borehole from the drill
location to Fugro laboratory in Dubai.
• Core photography on all samples using DSLR camera was used to record permanently
the unaltered appearance of the rock.
• A colour strip chart was used to serve as a reference to check the accuracy of the
photographic production of the rock core colours.
• The core boxes were transported upon completion of each borehole from the drill
location to Fugro laboratory in Dubai.
• Laboratory scheduled were generated by Fugro engineering geologist and approved
by the main contractor prior testing.
4.5.5 Logging
Soil and rock core samples were logged and described on site by experienced geologists.
The descriptions of soil and rock samples were carried out in accordance with the following
standards:
5. LABORATORY TESTING
Laboratory testing was undertaken on selected soil and rock samples obtained from all
boreholes. Laboratory schedules were generated by a Fugro engineering geologist and
approved by the main contractor prior testing.
A summary of the laboratory test results performed provided in Table 5.1. Results from the
tests have been used to confirm the visual classification of soil and rock undertaken during
site logging to confirm borehole logs and stratigraphy. Laboratory test results are presented
in Appendix B.
6. SITE CHARACTERISATION
The SPT N-Values range from 12 to 50 (i.e. medium dense to dense) and are plotted against
elevation and presented in Plate 4. The quality of natural rock varies from fair to good and the
RQD% vs elevation is presented in Plate 5
7. GROUNDWATER
Groundwater levels were measured in the course of the investigation during drilling activities.
The water table readings obtained during drilling activities are presented in Table 7.1 and
ranged from +1.99m FMD to +2.83m FMD .
Groundwater levels during drilling activities are highly influenced by the daily base activities
and drill cuttings. Accordingly, groundwater levels during drilling activities should be used with
caution; since they are not representative of actual groundwater conditions at site.
Groundwater levels should be verified with the use of available standpipe piezometers prior
to construction. Tidal levels and seasonal variability should also be taken into consideration.
8. REPORT LIMITATIONS
Conclusions of sub-surface conditions mentioned herein, are based solely on the findings of
the investigation works conducted on site at the time of the study. This investigation identifies
sub-surface conditions at the points where sampling and testing have been carried out.
Subsurface conditions throughout the site, if stated, are rendered from extrapolating the
results at these points through applying the best professional opinion and engineering
judgment.
Changes brought about to site and its adjacent vicinities due to construction, manmade or
natural events, proceeding the time of study are not within the scope of this report, neither is
contradictory subsurface conditions observed at later stages. Should this occur, Fugro Middle
East should be notified immediately to discuss with you the necessity of assessing the
conclusions reported.
References
▪ ASTM International (2009), “Standard Practice for Description and Identification of Soils
(Visual-Manual Procedure)", ASTM D2488-17
▪ ASTM International, “Standard Practice for Classification of Soils for Engineering Purposes
(Unified Soil Classification System)", ASTM D2487-17
▪ BSI British Standards Institution (1986), "British Standard Code of Practice for Foundations
(Formerly CP 2004)", BS 8004:2015
▪ BSI British Standards Institution (1986), “British Standard Code of Practice for Earthworks”, BS
6031: 2009
▪ BSI British Standards Institution (1990), "British Standard Methods of Test for Soils for Civil
Engineering Purposes", BS 1377:1990. (Parts 1-9, with Amendments)
▪ BSI British Standards Institution (1999), "Code of Practice for Ground Investigations", British
Standard BS 5930:2015
▪ Subsurface Data Management and Reporting Software gNIT. Recording, Presentation and
Analysis of Geo-data
PLATES
Project
Geotechnical Investigation for
Seepage Water Disposal Pipeline,
M Project
Project Number
PU-18-0037-NE
Client
SKEC
Site Location
Location
Fujairah, U.A.E.
Site Location
Title
Plate 1
Geotechnical Investigation Report
Project
Geotechnical Investigation for
Seepage Water Disposal Pipeline,
M Project
Project Number
PU-18-0037-NE
Client
SKEC
Location
Fujairah, U.A.E.
Site Location
Title
Borehole Locations
Plate 2
Geotechnical Investigation for Seepage Water
Project Title: Disposal Pipeline, M Project Location: Fujairah
Client: SK E&C Date: 30-Oct-18
Project No.: PU-18-0037-NE SK E&C Surveyor: Bright
References: PU-18-0037-NE-001 (Rev. B)
All Test Locations
SPT N'Value
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0
10.0
5.0
0.0
Elevation (m FMD)
-5.0
-10.0
-15.0
-20.0
-25.0
-30.0
Plate 4
FUGRO MIDDLE EAST
RQD (%)
0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0
10.0
5.0
0.0
Elevation (m FMD)
-5.0
-10.0
-15.0
-20.0
-25.0
-30.0
Plate 5
GEOTECHNICAL FACTUAL REPORT
Geotechnical Investigation for Seepage Water Disposal Pipeline, M Project, Fujairah – UAE
APPENDIX A
FIELD TESTING
7KH ERUHKROH ORJ FRQWDLQV D JUDSKLF ORJ RI WKH JURXQG FRQGLWLRQV )LJXUHV WKURXJK SUHVHQW GHWDLOV IRU VRLOV
FHPHQWDWLRQ GHJUHHV DQG URFNV ,Q DGGLWLRQ WKH ERUHKROH ORJ PD\ VKRZ VSHFLILF V\PEROV IRU VDPSOLQJ DQG LQVLWX
WHVWLQJ)LJXUHSUHVHQWVGHWDLOV
0$,162,/
&(0(17$7,21 $'',7,21$/62,/3$57,&/(6 (;$03/(62)*5$3+,&/2*
7<3(
6OLJKWO\
3($7 2UJDQLF0DWWHU 3($7FOD\H\
&HPHQWHG
0RGHUDWHO\ 6KHOOVRU6KHOO
&/$< &/$<VDQG\
&HPHQWHG )UDJPHQWV
6,/7 :HOO&HPHQWHG &RUDO)UDJPHQWV &/$<YHU\VDQG\
6$1'
$OJDO&UXVWDWLRQV 6,/7VDQG\
*5$9(/ *\SVXP&U\VWDOV
6$1'FOD\H\
&RUDOOLQH'(%5,6 5RFN)UDJPHQWV
6$1'YHU\JUDYHOO\FOD\H\
6$1'VLOW\ZHOOFHPHQWHG
'(%5,6 ,QFOXVLRQV
0$'(*5281'
&$/&,/87,7( &/$<6721(
&DUERQDWH&21*/20(5$7( &21*/20(5$7(
&DUERQDWH%5(&&,$ %5(&&,$
/,0(6721( 08'6721(
'RORPLWLF/,0(6721( 6+$/(
& &
& &+$/.
& &
3ODWH$
SYMBOL LEGEND FOR GEOTECNICAL LOGS
0(7$0253+,&52&.6 ,*1(28652&.6
)LQHJUDLQHGURFN )LQHJUDLQHGURFN
0HGLXPJUDLQHGURFN 0HGLXPJUDLQHGURFN
&RDUVHJUDLQHGURFN &RDUVHJUDLQHGURFN
Water Table
6DPSOH 6376376DPSOH &RQH
' 'LVWXUEHG6DPSOH 3HQHWUDWLRQ
&RUH 88QGLVWXUEHG6DPSOH 7HVW
5XQ 5&&RUH5XQ
: :DWHU6DPSOH ,Q6LWX7HVW
3ODWH$
Classification of Soil for Engineering Purpose
- based on British Standards, BS:5930, 2015
Annexure
/ Page 2 of 8
Plate A2.1
Classification of Soil for Engineering Purpose
- based on British Standards, BS:5930, 2015
Annexure
IP-12/IC/02/00 Plate A2.2
Page 3 of 8
Classification of Soil for Engineering Purpose
- based on British Standards, BS:5930, 2015
Note:
measurements
made on material
passing a 425ȝm
sieve
Table 6, Table describing Rock strength from field indentification and UCS value
Extract from BS:5930 A2, 2015
Annexure
12-Geotech/IC/01/00 Plate A2.4
Page 1 of 7
Classification of Rock for Engineering Purpose
-based on British Standards, BS:5930, 2015
Annexure
12-Geotech/IC/01/00 Page 3 of 7
Plate A2.5
ClassificationofRockforEngineeringPurpose
Ͳbased onBritishStandards, BS:5930, 2015
Extract from
BS:5930 A2, 2015
Plate A2.6
ClassificationofRockforEngineeringPurpose
Ͳbased onBritishStandards, BS:5930, 2015
Table15,Terminologyandchecklistforrockdiscontinuitydescription
.ExtractfromBS:5930A2,2015
Plate A2.7
Plate A2.8
Geological Cross
Section
A BH-40
4.74m
BH-41
4.98m
E: 435613.55
BH-42
4.99m
E: 435938.46 A'
E: 435286.47
N: 2788396.81 SPT
N: 2788355.68 SPT
0 10 20 30 40 50 60
N: 2788320.49 SPT
0 10 20 30 40 50 60
Project Name:
0 10 20 30 40 50 60
4.0 4.0
Geotechnical Investiogation for Seepage Water
Disposal Pipeline, M Project
0.0 0.0
Client:
SKEC
-2.0 -2.0
Location:
-16.0 -16.0
-18.0 -18.0
-20.0 -20.0
-24.0 -24.0
435200 435400 435600 435800 436000
2788600 2788600
-26.0 -26.0
A BH-40
2788400 BH-41 2788400
-28.0 -28.0 BH-42
2788200
A' 2788200
-30.0 -30.0 435200 435400 435600 435800 436000
FUGRO MIDDLE EAST Borehole:
BH-40
Equipment: T-30 Start Date: 15/10/2018 Coordinates: E 435286m N 2788397m
End Date : 18/10/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 4.74 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 35.00
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
0.00
gabbro. (Backfilled)
C3 75 0 0
3.0 1.75
1.75
2.0
C4 45 0 0
2.30
2.30
C5 20 0 0
2.0
2.80
2.80
1.0
4.0
4.00
S3 19 9 9 10
4.45
0.0
5.0
5.00
S4 12 6 6 6
5.45
-1.0
6.0
6.00
S5 17 7 9 8
6.45
-2.0
7.0
7.00
S6 17 7 10 7
7.45
-3.0
8.0
8.00
8.00 m to 14.00 m - Medium dense, light grey
to light greyish brown, slightly gravelly, silty, S7 21 10 10 11
fine to medium, SAND. 8.45
-4.0
9.0
9.00
S8 23 8 11 12
9.45
-5.0
10.0
Remark:2.65 16/10 Project : Geotechnical Investigation for Seepage Water Disposal
Logged by: MSM
50* means actual N value is greater Pipeline, M Project
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MU
Client : SKEC
Plate: A4.1.1
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-40
Equipment: T-30 Start Date: 15/10/2018 Coordinates: E 435286m N 2788397m
End Date : 18/10/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 4.74 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 35.00
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
10.00
-6.0
11.0
11.00
S10 26 9 13 13
11.45
-7.0
12.0
12.00
S11 12 7 7 5
12.45
13.0
13.00
S12 26 13 14 12
13.45
14.0
14.00
14.00 m to 18.00 m - Dense, light greyish
brown to reddish brown, slightly silty, fine to S13 38 14 19 19
medium, SAND with shell fragments. 14.45
-10.0
15.0
15.00
S14 41 13 20 21
15.45
-11.0
16.0
16.00
S15 33 10 14 19
16.45
-12.0
17.0
17.00
S16 30 14 16 14
17.45
-13.0
18.0
18.00
18.00 m to 20.00 m - Medium dense, light
grey to grey, very silty, fine to medium, SAND. S17 14 5 7 7
18.45
-14.0
19.0
19.00
S18 12 6 6 6
19.45
2.67 17/10
-15.0
20.0
Remark:
Project : Geotechnical Investigation for Seepage Water Disposal
Logged by: MSM
50* means actual N value is greater Pipeline, M Project
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MU
Client : SKEC
Plate: A4.1.2
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-40
Equipment: T-30 Start Date: 15/10/2018 Coordinates: E 435286m N 2788397m
End Date : 18/10/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 4.74 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 35.00
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
20.00
20.0 20.00 m to 22.50 m - Dense, light brownish
grey to light grey, silty, very gravelly, fine to S19 30 12 17 13
medium, SAND. 20.45
-16.0
21.0
21.00
S20 39 24 21 18
21.45
-17.0
22.0
22.00
S21 40 12 16 24
22.45
-20.0
25.0
C8 100 83 83
-22.0
C9 97 67 60
27.0
From 27.10 m to 27.20 m - Non-intact core,
recovered as cemented sand.
70
From 27.32 m to 27.50 m - Non-intact core, 27.50
27.50
28.0
C10 99 80 80
From 28.45 m to 28.63 m - Non-intact core,
recovered as cemented sand and sand. -24.0
C11
-25.0
30.0
Remark:
Project : Geotechnical Investigation for Seepage Water Disposal
Logged by: MSM
50* means actual N value is greater Pipeline, M Project
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MU
Client : SKEC
Plate: A4.1.3
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-40
Equipment: T-30 Start Date: 15/10/2018 Coordinates: E 435286m N 2788397m
End Date : 18/10/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 4.74 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 35.00
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
29.00
30.0 22.60 m to 34.50 m - Extremely weak to very
weak, light brownish grey, fine to medium C11 97 97 97
70 grained, SANDSTONE with locally thin beds 30.50
30.50
70 33.50
33.50
-31.0
36.0
-32.0
37.0
-33.0
38.0
-34.0
39.0
-35.0
40.0
Remark:
Project : Geotechnical Investigation for Seepage Water Disposal
Logged by: MSM
50* means actual N value is greater Pipeline, M Project
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MU
Client : SKEC
Plate: A4.1.4
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-41
Equipment: T-30 Start Date: 20/10/2018 Coordinates: E 435614m N 2788356m
End Date : 23/10/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 4.98 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 35.10
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
0.00
C3 76 14 0
1.50
1.50
C4 100 0 0
2.0 3.0 2.00
2.00
C5 70 0 0
2.50
2.50
C6 86 28 28
3.0 2.0 3.00
3.00
C7 80 0 0
3.50
3.50
2.54 21/10
C8 100 0 0
4.0 1.0 4.00
4.00
C9 80 36 36
4.50
4.50
C10 76 0 0
5.0 0.0 5.00
5.00
C11 100 0 0
5.50
5.50
C12 100 30 0
6.0 -1.0 6.00
6.00
C13 42 20 20
8.0 -3.0
8.00
S2 16 6 7 9
8.45
9.0 -4.0
9.00
S3 13 7 6 7
9.45
10.0 -5.0
Remark:
Project : Geotechnical Investigation for Seepage Water Disposal
Logged by: MSM
50* means actual N value is greater Pipeline, M Project
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MU
Client : SKEC
Plate: A4.2.1
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-41
Equipment: T-30 Start Date: 20/10/2018 Coordinates: E 435614m N 2788356m
End Date : 23/10/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 4.98 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 35.10
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
10.00
10.0 7.00 m to 14.00 m - Medium dense, light grey
to grey, slightly silty, fine to medium, SAND S4 15 6 7 8
with shell fragments. 10.45
11.0 -6.0
11.00
S5 26 7 11 15
11.45
12.0 -7.0
12.00
S6 16 6 9 7
12.45
13.0 -8.0
13.00
S7 23 9 12 11
13.45
2.45 22/10
14.0 -9.0
14.00
14.00 m to 16.00 m - Medium dense, light
grey to grey, very silty, fine to medium, SAND S8 25 8 11 14
with shell fragments. 14.45
15.0 -10.0
15.00
S9 25 10 11 14
15.45
16.0 -11.0
16.00
16.00 m to 19.00 m - Medium dense to
dense, light grey to greyish brown, slightly S10 37 10 16 21
silty, slightly gravelly, fine to coarse, SAND 16.45
17.0 -12.0
17.00
S11 31 10 14 17
17.45
18.0 -13.0
18.00
S13 50* 19 50
SANDSTONE with fine clasts of gabbro 19.30
19.30
interbedded with local beds of conglomerate.
Slightly weathered. Fractures dip 0-10°, close C14 100 90 71
to medium spaced, undulating, rough and
50 20.0 clean. -15.0 20.00
Remark:
Project : Geotechnical Investigation for Seepage Water Disposal
Logged by: MSM
50* means actual N value is greater Pipeline, M Project
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MU
Client : SKEC
Plate: A4.2.2
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-41
Equipment: T-30 Start Date: 20/10/2018 Coordinates: E 435614m N 2788356m
End Date : 23/10/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 4.98 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 35.10
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
20.00
20.0 19.30 m to 24.50 m - Very weak to weak, light
brown to brown, fine to medium grained
SANDSTONE with fine clasts of gabbro
interbedded with local beds of conglomerate.
Slightly weathered. Fractures dip 0-10°, close C15 99 99 97
21.0 to medium spaced, undulating, rough and -16.0
clean.
50 21.50
21.50
22.0 -17.0
C16 100 88 57
Remark:
Project : Geotechnical Investigation for Seepage Water Disposal
Logged by: MSM
50* means actual N value is greater Pipeline, M Project
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MU
Client : SKEC
Plate: A4.2.3
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-41
Equipment: T-30 Start Date: 20/10/2018 Coordinates: E 435614m N 2788356m
End Date : 23/10/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 4.98 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 35.10
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
29.10
30.0 28.60 m to 35.10 m - Very weak, light greyish
brown to light brown, fine to medium grained, C21 97 90 90
SANDSTONE with locally medium bed of
70
conglomerate. Slightly weathered. Fractures 30.60
30.60
32.0 -27.0
70 32.10
32.10
70 33.60
33.60
34.0 -29.0
C24 93 92 92
36.0 -31.0
37.0 -32.0
38.0 -33.0
39.0 -34.0
40.0 -35.0
Remark:
Project : Geotechnical Investigation for Seepage Water Disposal
Logged by: MSM
50* means actual N value is greater Pipeline, M Project
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MU
Client : SKEC
Plate: A4.2.4
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-42
Equipment: T-30 Start Date: 24/10/2018 Coordinates: E 435938m N 2788320m
End Date : 30/10/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 4.99 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 35.00
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
0.00
C3 100 0 0
1.50
1.50
C4 92 0 0
2.0 3.0 2.00
2.00
C5 92 70 70
2.50
2.50
C6 100 12 0
3.0 2.0 3.00
3.00
C7 90 90 80
3.50
3.50
4.0 1.0 C8 82 18 0
4.35
4.35
2.85 25/10
C9 46 46 23
5.0 0.0 5.00
5.00
C10 64 64 64
5.50
5.50
6.0 -1.0
C11 70 8 0
6.50
6.50
C12 76 36 36
7.0 -2.0 7.00
7.00
C13 88 0 0
7.50
7.50
C14 96 88 88
8.0 -3.0 8.00
8.00
C15 80 56 44
8.50
8.50
C16 94 50 30
9.0 -4.0 9.00
9.00
C17 86 16 0
9.50
9.50
3.28 27/10
C18 100 16 0
10.0 -5.0 10.00
Remark:
Project : Geotechnical Investigation for Seepage Water Disposal
Logged by: MSM
50* means actual N value is greater Pipeline, M Project
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MU
Client : SKEC
Plate: A4.3.1
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-42
Equipment: T-30 Start Date: 24/10/2018 Coordinates: E 435938m N 2788320m
End Date : 30/10/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 4.99 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 35.00
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
10.00
10.0 0.00 m to 12.00 m - Recovered as slightly
silty, slightly sandy, GRAVEL with some C19 96 70 48
cobbles. Gravel is medium to coarse, angular 10.50
10.50
to sub-angular, fine to coarse of gabbro.
(Backfilled) C20 100 90 90
11.0 -6.0 11.00
11.00
C21 88 85 85
13.0 -8.0
13.00
S2 22 9 10 12
13.45
14.0 -9.0
14.00
S3 22 8 12 10
14.45
15.0 -10.0
15.00
S4 28 10 14 14
15.45
16.0 -11.0
16.00
S5 29 10 13 16
16.45
17.0 -12.0
17.00
S6 29 8 12 17
17.45
18.0 -13.0
18.00
S7 26 10 14 12
18.45
19.0 -14.0
19.00
S8 29 9 13 16
19.45
20.0 -15.0
Remark:
Project : Geotechnical Investigation for Seepage Water Disposal
Logged by: MSM
50* means actual N value is greater Pipeline, M Project
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MU
Client : SKEC
Plate: A4.3.2
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-42
Equipment: T-30 Start Date: 24/10/2018 Coordinates: E 435938m N 2788320m
End Date : 30/10/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 4.99 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 35.00
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
20.00
20.0 20.00 m to 20.20 m - Very dense, light grey, S9
20.20
50* 26 50/
slightly silty, slightly sandy, GRAVEL. Gravel 20.20
50mm
is fine to coarse, sub-angular to sub-rounded
of sandstone.
20.20 m to 27.70 m - Extremely weak to very
C22 97 93 93
21.0 weak, light greyish brown to light brown, fine -16.0
C24 98 98 98
C25 100 97 97
24.0 -19.0
24.50
24.50
25.0 -20.0
27.50
27.70 m to 35.00 m - Extremely weak to very 27.50
Remark:
Project : Geotechnical Investigation for Seepage Water Disposal
Logged by: MSM
50* means actual N value is greater Pipeline, M Project
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MU
Client : SKEC
Plate: A4.3.3
Job No. : PU-18-0037-NE
FUGRO MIDDLE EAST Borehole:
BH-42
Equipment: T-30 Start Date: 24/10/2018 Coordinates: E 435938m N 2788320m
End Date : 30/10/2018
Method: Rotary Boring/Coring Bore Diameter (mm): 121 Surface Elevation (m): 4.99 m FMD
Fluid Flush: Fresh water Core Diameter (mm): 85 End Borehole Depth (m below surface): 35.00
Borehole Progress Test Records Rock Core Quality
Depth Graphic Test /
Strata Description TCR SCR RQD
Seating
Blwct 1
Blwct 2
Flush W.D. Sample
Datum
[m] Symbol N
Drive
ret. % [m] Date [%] [%] [%]
No.
29.00
30.0 27.70 m to 35.00 m - Extremely weak to very
weak, light brown to brown, locally mottled C29 60 37 17
multi-coloured, fine to medium grained 30.50
30.50
SANDSTONE with fine clasts of gabbro,
interbedded with local beds of conglomerate. C30 80 70 56
31.0 Slightly weathered. Fractures dip 0-10°, close -26.0 31.00
31.00
to medium spaced, undulating, rough and
clean.
C31 92 85 85
30/10
C32 100 99 97
33.0 -28.0
C33 97 97 97
From 34.40 m to 34.55 m - Thin bed of matrix
supported Conglomerate.
85 35.0 At 35.00 m - End of Borehole. -30.0 35.00
36.0 -31.0
37.0 -32.0
38.0 -33.0
39.0 -34.0
40.0 -35.0
Remark:
Project : Geotechnical Investigation for Seepage Water Disposal
Logged by: MSM
50* means actual N value is greater Pipeline, M Project
than 50 or refusal. Location : Fujairah, U.A.E. Checked by:MU
Client : SKEC
Plate: A4.3.4
Job No. : PU-18-0037-NE
GEOTECHNICAL FACTUAL REPORT
Geotechnical Investigation for Seepage Water Disposal Pipeline, M Project, Fujairah – UAE
APPENDIX B
LABORATORY TEST RESULTS
Sample Identification Density Particle Size Distribution Atterberg limits Chemical Analysis Compaction CBR Shear Box Triaxial Consolidation Rock Properties
Water Water Soluble Carbonate Content Organic Electrical Type MDD OMC Max. Peak Type Angle of Initial Compr. Est. Point
Conductivity Permeability Splitting
B.H. Sample Sample Sample Top Specimen Moisture Bulk Dry Particle Silt/ <425 Method Chloride Sulphate Chloride Sulphate as as matter (Rammer value Cohesion Angle of Shear void index Precon UCS E Poissons Slake Load
No. No. Type Depth (m) Depth (m) Content Density Density Density Gravel Sand Clay LL PL PI mm of *Class as Cl as SO3 as Cl as SO3 pH CO2 CaCO3 content of Weight) Intercept Resist. Resist. ratio Cc solidation Modulus Ratio Durability tensile Index
Preparation Water c' f' cu f' e0 pressure Index strength IS/(50)
(%) (Mg/m³) (Mg/m³) (Mg/m³) (%) (%) (%) (%) (%) (%) (%) (%) (g/L) (%) (g/L) (%) (%) (%) (ms) (kg) (Mg/m³) (%) (%) (kPa) (°) (kPa) (°) (MPa) (MPa) (MPa) (%) (MPa) (MPa)
FME Project No.PU-18-0037-NE Note: Sample Type; D=small disturbed sample,B=bulk disturbed sample, C=core sample; W=water sample [* Atterberg Limits,NP = Non Plastic] Authorised by: J. De Leon, Laboratory Supervisor Plate: B1.1
PARTICLE SIZE DISTRIBUTION- REPORT
Page 1 of 5
Client : SKEC
Project : Geotechnical Investigation for Seepage Water Disposal Pipeline, M Project
Location : Fujairah
Laboratory Information
0.600
0.425
0.150
0.075
4.75
2.36
1.18
37.5
12.5
100
9.5
75
50
25
19
100
90
80
70
60
Percentage Passing
50
40
30
20
10
0
Sand
Gravel Silt Clay
coarse medium fine
75 4.75 2.00 0.425 0.075 0.0 0.001
Particle Size - mm
Borehole Sample No. Depth (m) Curve Mass Gravel Sand Silt/Clay D10 Dmax Cu Cc
BH-40 S2 2.80 to 3.25 224.4g 0% 94% 6% 0.0856 4.75 3.04 1.18
BH-40 S5 6.00 to 6.45 150g 0% 98% 2% 0.1734 9.5 3.05 0.85
BH-40 S8 9.00 to 9.45 X 101.1g 0% 88% 12% - 4.75 - -
BH-40 S11 12.00 to 12.45 + 100.7g 4% 77% 19% - 12.5 - -
Laboratory Information
0.600
0.425
0.150
0.075
4.75
2.36
1.18
37.5
12.5
100
9.5
75
50
25
19
100
90
80
70
60
Percentage Passing
50
40
30
20
10
0
Sand
Gravel Silt Clay
coarse medium fine
75 4.75 2.00 0.425 0.075 0.0 0.001
Particle Size - mm
Borehole Sample No. Depth (m) Curve Mass Gravel Sand Silt/Clay D10 Dmax Cu Cc
BH-40 S14 15.00 to 15.45 204.3g 1% 95% 4% 0.1616 9.5 2.85 0.84
BH-40 S18 19.00 to 19.45 101.6g 0% 79% 21% - 4.75 - -
BH-40 S21 21.00 to 21.45 X 221.3g 35% 57% 8% 0.0942 19 30.00 0.28
Laboratory Information
0.600
0.425
0.150
0.075
4.75
2.36
1.18
37.5
12.5
100
9.5
75
50
25
19
100
90
80
70
60
Percentage Passing
50
40
30
20
10
0
Sand
Gravel Silt Clay
coarse medium fine
75 4.75 2.00 0.425 0.075 0.0 0.001
Particle Size - mm
Borehole Sample No. Depth (m) Curve Mass Gravel Sand Silt/Clay D10 Dmax Cu Cc
BH-41 S2 8.00 to 8.45 100.8g 0% 90% 10% - 4.75 - -
BH-41 S6 12.00 to 12.45 100g 1% 80% 19% 0.0015 9.5 89.00 39.00
BH-41 S8 14.00 to 14.45 X 100g 0% 69% 31% - 9.5 - -
BH-41 S10 16.00 to 16.45 + 183.5g 0% 98% 2% 0.2181 4.75 3.71 1.42
Laboratory Information
0.600
0.425
0.150
0.075
4.75
2.36
1.18
37.5
12.5
100
9.5
75
50
25
19
100
90
80
70
60
Percentage Passing
50
40
30
20
10
0
Sand
Gravel Silt Clay
coarse medium fine
75 4.75 2.00 0.425 0.075 0.0 0.001
Particle Size - mm
Borehole Sample No. Depth (m) Curve Mass Gravel Sand Silt/Clay D10 Dmax Cu Cc
BH-41 S12 18.00 to 18.45 183.7g 1% 95% 4% 0.1533 9.5 3.39 0.88
BH-41 S18 19.00 to 19.45 159.2g 48% 47% 5% 0.215 19 29.00 2.13
Laboratory Information
0.600
0.425
0.150
0.075
4.75
2.36
1.18
37.5
12.5
100
9.5
75
50
25
19
100
90
80
70
60
Percentage Passing
50
40
30
20
10
0
Sand
Gravel Silt Clay
coarse medium fine
75 4.75 2.00 0.425 0.075 0.0 0.001
Particle Size - mm
Borehole Sample No. Depth (m) Curve Mass Gravel Sand Silt/Clay D10 Dmax Cu Cc
BH-42 S2 12.00 to 12.45 105.4g 0% 77% 23% 0.0062 4.75 18.00 9.18
BH-42 S6 16.00 to 16.45 102.2g 12% 65% 23% 0.0078 19 16.00 6.96
BH-42 S9 19.00 to 19.45 X 102.8g 1% 73% 26% 0.0054 9.5 22.00 9.42
Laboratory Information
Test Result
Bore Hole Sample FME Depth Sample Moisture Bulk Dry Specific
No. No. Sample (m) Type Content Density Density Gravity /
No. Particle
Mg/m3 Mg/m3 Density
% Mg/m3
Notes:
Moisture content : ASTM D 2216-2010
Bulk density : ASTM D7263-09
Dry density : ASTM D7263-09
Particle density (SG) : ASTM D 854-14 Method B
Sample Type; D = small disturbed sample, U = undisturbed sample, C = core sample
Authorised by: J. De Leon
Laboratory Supervisor
Laboratory Information
Test Result
Bore Sample FME Depth Type Sample Natural Passing Liquid Plastic Plasticity Plasticity
Hole No. Sample (m) History Moisture 425mm Limit Limit Index Class
No. No. Content sieve D 2487
(%) (%) (%) (%)
Laboratory Information
Test Result
2
Area of specimen : 3600 mm
Height of specimen : 25 mm
Moisture content : 6.0 %
Bulk density : 1.76 Mg/m³ Stage No. 1 2 3
Dry density : 1.66 Mg/m³ Applied normal stress kPa 25 50 100
Particle density : 2.65 (Assumed) Peak shear stress kPa 17 33 66
Displacement at peak stress mm 4.0 4.6 5.8
Rate of displacement : 0.4 mm/min
Specimen tested : Submerged Angle of shearing resistance f' 33
Method of reversal : not applicable Apparent cohesion c' 0 kPa
80 125
stage 3 100
60
Shear Stress (kPa)
75
40 stage 3
stage 2 50
20 stage 2
stage 1 25
stage 1
0 0
0.0 2.0 4.0 6.0 8.0 0 25 50 75 100 125
Note : Graphical printout may not produce a true 1:1 axis ratio
Authorised by: J. De Leon
Laboratory Supervisor
Trial Pit / Bore Hole No. : BH-40 Lab. Report No. 1468/4
Sample Ref. / Type : S4 / (Small disturbed sample) Report Date 15/11/2018
Depth : 5.00 to 5.45
Visual description : SHELLY SAND
Test Result
Consolidation Stage
0.10
0.10 0.20
0.20
0.20
Settlement (mm)
Settlement (mm)
Settlement (mm)
0.30 0.40
0.30 0.40
0.60
0.40 0.50
0.60 0.80
0.50 stage 3
stage 1 0.70
0.60 stage 2 1.00
0.80
Square Root Time (minutes) Square Root Time (minutes) Square Root Time (minutes)
Shearing Stage
Change in Specimen Thickness During Change in Specimen Thickness During Change in Specimen Thickness During
Shear Shear Shear
-0.02 0.00 0.00
Laboratory Information
Test Result
2
Area of specimen : 3600 mm
Height of specimen : 25 mm
Moisture content : 5.0 %
Bulk density : 1.79 Mg/m³ Stage No. 1 2 3
Dry density : 1.71 Mg/m³ Applied normal stress kPa 25 50 100
Particle density : 2.65 (Assumed) Peak shear stress kPa 17 33 65
Displacement at peak stress mm 4.0 5.2 5.6
Rate of displacement : 0.4 mm/min
Specimen tested : Submerged Angle of shearing resistance f' 33
Method of reversal : not applicable Apparent cohesion c' 0 kPa
80 125
stage 3 100
60
Shear Stress (kPa)
75
40 stage 3
stage 2 50
20 stage 2
stage 1 25
stage 1
0 0
0.0 2.0 4.0 6.0 8.0 0 25 50 75 100 125
Note : Graphical printout may not produce a true 1:1 axis ratio
Authorised by: J. De Leon
Laboratory Supervisor
Trial Pit / Bore Hole No. : BH-41 Lab. Report No. 1468/5
Sample Ref. / Type : S4 / (Small disturbed sample) Report Date 15/11/2018
Depth : 10.00 to 10.45
Visual description : Sand with Shell Fragments
Test Result
Consolidation Stage
0.10 0.20
0.20
0.20
0.40
Settlement (mm)
Settlement (mm)
Settlement (mm)
0.40
0.30
0.60
0.40 0.60
0.80
0.50
0.80
1.00 stage 3
0.60 stage 2
stage 1
1.00 1.20
0.70
Square Root Time (minutes) Square Root Time (minutes) Square Root Time (minutes)
Shearing Stage
Change in Specimen Thickness During Change in Specimen Thickness During Change in Specimen Thickness During
Shear Shear Shear
-0.02 0.00 0.00
0.08
0.20 0.20
0.13
0.30 0.30
0.18
0.40 0.40
0.23
stage 3
0.28 0.50 0.50
stage 1 stage 2
Laboratory Information
Test Result
2
Area of specimen : 3600 mm
Height of specimen : 25 mm
Moisture content : 6.1 %
Bulk density : 1.61 Mg/m³ Stage No. 1 2 3
Dry density : 1.52 Mg/m³ Applied normal stress kPa 25 50 100
Particle density : 2.65 (Assumed) Peak shear stress kPa 17 31 59
Displacement at peak stress mm 4.4 4.4 5.0
Rate of displacement : 0.4 mm/min
Specimen tested : Submerged Angle of shearing resistance f' 31
Method of reversal : not applicable Apparent cohesion c' 0 kPa
80 125
100
60 stage 3
Shear Stress (kPa)
75
40
stage 3
50
stage 2
20
stage 1 stage 2
25
stage 1
0 0
0.0 2.0 4.0 6.0 8.0 0 25 50 75 100 125
Note : Graphical printout may not produce a true 1:1 axis ratio
Authorised by: J. De Leon
Laboratory Supervisor
Trial Pit / Bore Hole No. : BH-42 Lab. Report No. 1468/6
Sample Ref. / Type : S3 / (Small disturbed sample) Report Date 15/11/2018
Depth : 13.00 to 13.45
Visual description : Sand with Shell Fragments
Test Result
Consolidation Stage
0.10
0.10 0.20
0.20
Settlement (mm)
Settlement (mm)
Settlement (mm)
0.20 0.30 0.40
0.40
0.30 0.60
0.50
Square Root Time (minutes) Square Root Time (minutes) Square Root Time (minutes)
Shearing Stage
Change in Specimen Thickness During Change in Specimen Thickness During Change in Specimen Thickness During
Shear Shear Shear
-0.02 0.00 0.00
0.03 0.05
0.10
Vertical Displacement (mm)
0.08 0.10
0.15 0.20
0.13
0.20
0.18 0.30
0.25
0.23
0.30 0.40
0.28 0.35
0.50
0.33 stage 1 0.40 stage 2 stage 3
Laboratory Information
Test Result
Failure pattern
Photographs
Before Test After Test
BH-40 BH-40
Specimen Depth 24.30 to 24.50 Specimen Depth 24.30 to 24.50
Photographs
Before Test After Test
BH-40 BH-40
Specimen Depth 32.00 to 32.20 Specimen Depth 32.00 to 32.20
Laboratory Information
Test Result
Failure pattern
Photographs
Before Test After Test
BH-41 BH-41
Specimen Depth 20.70 to 20.90 Specimen Depth 20.70 to 20.90
Photographs
Before Test After Test
BH-41 BH-41
Specimen Depth 27.00 to 27.20 Specimen Depth 27.00 to 27.20
Laboratory Information
Test Result
Failure pattern
Photographs
Before Test After Test
BH-41 BH-41
Specimen Depth 32.50 to 32.70 Specimen Depth 32.50 to 32.70
Laboratory Information
Test Result
Failure pattern
Photographs
Before Test After Test
BH-42 BH-42
Specimen Depth 20.60 to 20.80 Specimen Depth 20.60 to 20.80
Photographs
Before Test After Test
BH-42 BH-42
Specimen Depth 31.00 to 31.20 Specimen Depth 31.00 to 31.20
Laboratory Information
Test Result
Failure pattern
Photographs
Before Test After Test
BH-42 BH-42
Specimen Depth 33.50 to 33.70 Specimen Depth 33.50 to 33.70
APPENDIX C
CORE PHOTOGRAPHS
Core Photographs
Core Photographs
Core Photographs
Core Photographs
Core Photographs
Core Photographs
Core Photographs
Core Photographs
Core Photographs
Core Photographs
Core Photographs
Core Photographs
PU-18-0037-NE
M.U.C. Engineering
Capt. Mousa Building, Ground Floor,
Hamad Bin Abdulla Road, Fujairah, UAE Page: Annex
P.O. Box 7718, Fujairah, UAE
Tel.: +971 (9) 2232033
Document ref.: 16070-TD-01-V52-rev.00; dated 05-03-2019
Fax: +971 (9) 2232006 Subject: PR#4 P3 TD - Clarification 2
E-mail: muceng@muc.ae
ANNEX G
SCHEDULE OF PRICES
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
Summary
BILL DESCRIPTION AMOUNT
NUMBER
Page 1 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
Bill no. 1
ITEM DESCRIPTION UNIT QUANTITY ESTIMATED AMOUNT
NUMBER BY BY
ENGINEER CONTRACTOR
1 0 0 0 0 GENERAL ITEMS AND PRELIMINARIES
1 1 0 0 0 CONTRACTUAL REQUIREMENTS
Amounts are to be fully inclusive as per the requirements of the
Specification. Tenderers are to ensure that all costs not included for
in the works items are allowed for in this section.
1 1 0 0 1 Performance Security LS 1 AED
1 1 0 0 2 Insurance of the Works (CAR) LS 1 AED
1 1 0 0 3 Third Party Insurance LS 1 AED
1 1 0 0 4 Professional Indemnity Insurance LS 1 AED
… [Tenderer to add ]
1 2 0 0 0 SPECIFIED REQUIREMENTS
Any services and facilities over and above the "Permanent Works"
of which are instructed in the Contract Documents.
1 2 0 0 1 Services for the Engineer's Staff months 10 AED
1 2 0 0 2 Equipment for use by the months 10 AED
Engineer's Staff
1 2 0 0 3 Testing of Materials LS 1 AED
1 2 0 0 4 Testing of the Works LS 1 AED
1 2 0 0 5 Project signboard no. 1 AED
1 2 0 0 6 Geotechnical investigations LS 1 AED
1 2 0 0 8 Survey of FNLRP revetment LS 1 AED
1 2 0 0 9 Large scale plate load tests (excluded no. 2 ( AED )
from total)
… [Tenderer to add ]
… [Tenderer to add ]
Page 2 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
Bill no. 2
ITEM DESCRIPTION UNIT QUANTITY ESTIMATED AMOUNT
NUMBER BY BY
ENGINEER CONTRACTOR
2 0 0 0 0 PILES AND SHEET PILES
2 1 0 0 0 CONCRETE PILES DIA. 650 MM
2 1 0 0 1 Grids 85-86 (Loop 4) no. 6 AED
2 1 0 0 2 Grids 104-105 (Loop 4) no. 6 AED
2 1 0 0 3 Grids 106-132 no. 54 AED
2 1 0 0 4 Grids 133-137 (Loop 5) no. 10 AED
2 1 0 0 5 Grids 141-165 no. 50 AED
2 1 0 0 6 Grids 166-168 no. 9 AED
2 1 0 0 7 Grids 169-173 (Loop 6) no. 8 AED
2 1 0 0 8 Grids 200-204 (Loop 7) no. 10 AED
2 1 0 0 9 Grids 232-236 (Loop 8) no. 10 AED
2 1 0 1 0 Grids 264-268 (Loop 9) no. 10 AED
2 1 0 1 1 Grids 287-291 (Loop 10) no. 10 AED
2 1 0 1 2 Grids SA5-1 to SA5-4 no. 8 AED
… [Tenderer to add ]
… [Tenderer to add ]
2 3 0 0 0 SHEET PILES
2 3 1 0 0 VHFL SPM PIPE PROTECTION COFFERDAM
2 3 1 0 1 Sheet piles type NSP-IIIW with fittings LS 1 AED
… [Tenderer to add ]
Page 3 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
… [Tenderer to add ]
Total for Bill no. 3.1 (carried forward to Summary of Bill No. 3): AED
Page 4 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
Total for Bill no. 3.2 (carried forward to Summary of Bill No. 3): AED
Page 5 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
… [Tenderer to add ]
Total for Bill no. 3.3 (carried forward to Summary of Bill No. 3): AED
Page 6 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
… [Tenderer to add ]
3 6 0 0 0 EXTENSION OF FOOTINGS
3 6 0 0 1 Grids 93-98 LS 1 AED
… [Tenderer to add ]
… [Tenderer to add ]
… [Tenderer to add ]
Total for Bill no. 3.4 (carried forward to Summary of Bill No. 3): AED
Page 7 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
Page 8 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
Bill no. 4
ITEM DESCRIPTION UNIT QUANTITY ESTIMATED AMOUNT
NUMBER BY BY
ENGINEER CONTRACTOR
4 0 0 0 0 STEEL STRUCTURES
4 1 0 0 0 STRUCTURES TO BE DISMANTLED
4 1 0 0 1 Grids 9-15, transverse beams LS 1 AED
only
4 1 0 0 2 Grids 16-20 (Loop 1) LS 1 AED
4 1 0 0 3 Grids 33-35 (Loop 2) LS 1 AED
4 1 0 0 4 Grids 61-63 (Loop 3) LS 1 AED
… [Tenderer to add ]
4 2 0 0 0 PIPERACK STRUCTURE
4 2 0 0 1 Grids 16-20 (Loop 1) t 44.571 AED
4 2 0 0 2 Grids 21-25 (4 bays) t 17.731 AED
4 2 0 0 3 Grids 26-31 (SP2, 5 bays) t 20.843 AED
4 2 0 0 4 Grids 32-36 (Loop 2) t 96.453 AED
4 2 0 0 5 Grids 37-40 (3 bays) t 14.411 AED
4 2 0 0 6 Grids 41-45 (4 bays) t 17.731 AED
4 2 0 0 7 Grids 46-51 (SP3, 5 bays) t 21.051 AED
4 2 0 0 8 Grids 52-55 (3 bays) t 14.411 AED
4 2 0 0 9 Grids 56-59 (3 bays) t 14.411 AED
4 2 0 1 0 Grids 60-64 (Loop 3) t 96.453 AED
4 2 0 1 1 Grids 65-69 (4 bays) t 17.731 AED
4 2 0 1 2 Grids 70-75 (SP4A, 5 bays) t 21.051 AED
4 2 0 1 3 Grids 76-80 (4 bays) t 17.731 AED
4 2 0 1 4 Grids 81-84 (3 bays) t 14.411 AED
4 2 0 1 5 Grids 85-86 (Loop 4) t 23.033 AED
4 2 0 1 6 Grids 87-92 (Loop 4, bridge) t 56.625 AED
4 2 0 1 7 Grids 133-137 (Loop 5) t 91.361 AED
4 2 0 1 8 Grids 169-173 (Loop 6) t 121.667 AED
4 2 0 1 9 Grids 200-204 (Loop 7) t 95.533 AED
4 2 0 2 0 Grids 232-236 (Loop 8) t 62.709 AED
4 2 0 2 1 Grids 264-268 (Loop 9) t 62.709 AED
4 2 0 2 2 Intermediate Grids 15* and 20* t 5.454 AED
4 2 0 2 3 Intermediate Grids 31* and 36* t 5.454 AED
4 2 0 2 4 Intermediate Grids 59* and 64* t 5.454 AED
4 2 0 2 5 Grids 288-290 (Loop 10) t 62.709 AED
… [Tenderer to add ]
… [Tenderer to add ]
Page 9 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
… [Tenderer to add ]
… [Tenderer to add ]
Total for Bill no. 5.1 (carried forward to Summary of Bill No. 5): AED
Page 10 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
… [Tenderer to add ]
Total for Bill no. 5.2 (carried forward to Summary of Bill No. 5): AED
Page 11 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
Page 12 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
Bill no. 6
ITEM DESCRIPTION UNIT QUANTITY ESTIMATED AMOUNT
NUMBER BY BY
ENGINEER CONTRACTOR
6 0 0 0 0 OPTIONAL ITEMS
6 0 0 0 1 TBA LS 1 AED
… [Tenderer to add ]
Page 13 of 14
Schedule of Prices
Project: Construction of Piperack #4 Phase 3 in Port of Fujairah, United Arab Emirates.
Client: Port of Fujairah, P.O. Box 787, Fujairah, United Arab Emirates.
Consultant: MUC Engineering, P.O. Box 7718, Fujairah, United Arab Emirates.
Document ref.: 16070-TD-01-V13 - Annex 01
Version date: 05-03-2019
Tenderer: [Tenderer to fill ] Date: [Tenderer to fill ]
Bill no. 7
ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
NUMBER
… [Tenderer to add ]
… [Tenderer to add ]
Page 14 of 14