0% found this document useful (0 votes)
1K views5 pages

UPS Weekly Check List

The document contains weekly checklists for 4 UPS systems (8500A, 8500B, 8501A, 8501B). It lists voltage, current, frequency and other parameters at each stage (rectifier, batteries, inverter, reserve, load) of the UPS systems. The checklists were filled on May 3rd, 2004 by technicians Altaf, Azam and Sajid and include measurements such as voltages ranging from 525VDC to 241V, currents from 0 to 9 amps, frequencies from 49.9Hz to 50Hz and temperatures from 26 to 28 degrees Celsius.

Uploaded by

abid aziz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views5 pages

UPS Weekly Check List

The document contains weekly checklists for 4 UPS systems (8500A, 8500B, 8501A, 8501B). It lists voltage, current, frequency and other parameters at each stage (rectifier, batteries, inverter, reserve, load) of the UPS systems. The checklists were filled on May 3rd, 2004 by technicians Altaf, Azam and Sajid and include measurements such as voltages ranging from 525VDC to 241V, currents from 0 to 9 amps, frequencies from 49.9Hz to 50Hz and temperatures from 26 to 28 degrees Celsius.

Uploaded by

abid aziz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

WEEKLY CHECKLIST - UPS

Process UPS - 8500 A


Sr. No Stage Description Value Remarks
a. Rectifier Stage
1 Voltage 526 VDC
2 Current 3 Amps (DC)
b. Batteries Stage
1 Voltage 423 VDC
2 Current 0 Amps (DC)
3 Battery Temperature 28 0C
4 Battery Autonomy Time Seconds
c. Inverter Stage
1 Frequency 49.9 Hz
2 Voltaeg - Phase A 240 Volts
3 Voltaeg - Phase B 241 Volts
4 Voltaeg - Phase C 241 Volts
5 Current - Phase A 0 Amps
6 Current - Phase B 5 Amps
7 Current - Phase C 0 Amps
d. Reserve Stage
1 Frequency 49.9 Hz
2 Voltage - Phase A 236 Volts
3 Voltage - Phase B 239 Volts
4 Voltage - Phase C 237 Volts
e. Load Stage
1 Frequency 50 Hz
2 Voltage - Phase A 240 Volts
3 Voltage - Phase B 241 Volts
4 Voltage - Phase C 241 Volts
5 Current - Phase A 0 Amps
6 Current - Phase B 5 Amps
7 Current - Phase C 0 Amps
8 Apparent Power - Phase A 0 KVA
9 Apparent Power - Phase B 1.2 KVA
10 Apparent Power - Phase C 0 KVA
11 Total Aparent Power 1.2 KVA
f. General
1 Inlet Air Temperature: 27 0C

Checklist filled by: ALTAF/AZAM/SAJID


Date: 5/3/2004

file:///conversion/tmp/scratch/414498637.xls 1 of 5
WEEKLY CHECKLIST - UPS

Process UPS - 8500 B


Sr. No Stage Description Value Remarks
a. Rectifier Stage
1 Voltage 526 VDC
2 Current 9 Amps (DC)
b. Batteries Stage
1 Voltage 430 VDC
2 Current 0 Amps (DC)
3 Battery Temperature 28 0C
4 Battery Autonomy Time Seconds
c. Inverter Stage
1 Frequency 50 Hz
2 Voltaeg - Phase A 241 Volts
3 Voltaeg - Phase B 240 Volts
4 Voltaeg - Phase C 239 Volts
5 Current - Phase A 0 Amps
6 Current - Phase B 5 Amps
7 Current - Phase C 9 Amps
d. Reserve Stage
1 Frequency 49.9 Hz
2 Voltage - Phase A 237 Volts
3 Voltage - Phase B 237 Volts
4 Voltage - Phase C 235 Volts
e. Load Stage
1 Frequency 50 Hz
2 Voltage - Phase A 235 Volts
3 Voltage - Phase B 237 Volts
4 Voltage - Phase C 234 Volts
5 Current - Phase A 0 Amps
6 Current - Phase B 5 Amps
7 Current - Phase C 9 Amps
8 Apparent Power - Phase A 0 KVA
9 Apparent Power - Phase B 1.2 KVA
10 Apparent Power - Phase C 2.2 KVA
11 Total Aparent Power 3.8 KVA
f. General
1 Inlet Air Temperature 28 0C

Checklist filled by: ALTAF/AZAM/SAJID

file:///conversion/tmp/scratch/414498637.xls 2 of 5
WEEKLY CHECKLIST - UPS
Date: 5/3/2004

Process UPS - 8501 A


Sr. No Stage Description Value Remarks
a. Rectifier Stage
1 Voltage 525 VDC
2 Current 4 Amps (DC)
b. Batteries Stage
1 Voltage 427 VDC
2 Current 0 Amps (DC)
3 Battery Temperature 26 0C
4 Battery Autonomy Time Seconds
c. Inverter Stage
1 Frequency 49.9 Hz
2 Voltaeg - Phase A 240 Volts
3 Voltaeg - Phase B 241 Volts
4 Voltaeg - Phase C 239 Volts
5 Current - Phase A 0 Amps
6 Current - Phase B 0 Amps
7 Current - Phase C 0 Amps
d. Reserve Stage
1 Frequency 50 Hz
2 Voltage - Phase A 233 Volts
3 Voltage - Phase B 238 Volts
4 Voltage - Phase C 235 Volts
e. Load Stage
1 Frequency 50 Hz
2 Voltage - Phase A 240 Volts
3 Voltage - Phase B 241 Volts
4 Voltage - Phase C 239 Volts
5 Current - Phase A 0 Amps
6 Current - Phase B 0 Amps
7 Current - Phase C 0 Amps
8 Apparent Power - Phase A 0 KVA
9 Apparent Power - Phase B 0 KVA
10 Apparent Power - Phase C 0 KVA
11 Total Aparent Power 0 KVA
f. General
1 Inlet Air Temperature 27 0C

file:///conversion/tmp/scratch/414498637.xls 3 of 5
WEEKLY CHECKLIST - UPS
Checklist filled by: ALTAF/AZAM/SAJID
Date: 5/3/2004

Process UPS - 8501 B


Sr. No Stage Description Value Remarks
a. Rectifier Stage
1 Voltage 525 VDC
2 Current 3 Amps (DC)
b. Batteries Stage
1 Voltage 428 VDC
2 Current 0 Amps (DC)
3 Battery Temperature 26 0C
4 Battery Autonomy Time Seconds
c. Inverter Stage
1 Frequency 49.9 Hz
2 Voltaeg - Phase A 240 Volts
3 Voltaeg - Phase B 240 Volts
4 Voltaeg - Phase C 239 Volts
5 Current - Phase A 0 Amps
6 Current - Phase B 0 Amps
7 Current - Phase C 0 Amps
d. Reserve Stage
1 Frequency 49 Hz
2 Voltage - Phase A 234 Volts
3 Voltage - Phase B 238 Volts
4 Voltage - Phase C 234 Volts
e. Load Stage
1 Frequency 49 Hz
2 Voltage - Phase A 240 Volts
3 Voltage - Phase B 241 Volts
4 Voltage - Phase C 238 Volts
5 Current - Phase A 0 Amps
6 Current - Phase B 0 Amps
7 Current - Phase C 0 Amps
8 Apparent Power - Phase A 0 KVA
9 Apparent Power - Phase B 0 KVA
10 Apparent Power - Phase C 0 KVA
11 Total Aparent Power 0 KVA

file:///conversion/tmp/scratch/414498637.xls 4 of 5
WEEKLY CHECKLIST - UPS
f. General
1 Inlet Air Temperature 28 0C

Checklist filled by: ALTAF/AZAM/SAJID


Date: 5/3/2004

file:///conversion/tmp/scratch/414498637.xls 5 of 5

file:///conversion/tmp/scratch/414498637.xls
1 of 5
WEEKLY CHECKLIST - UPS
Process UPS - 8500 A
Sr. No
Stage Description
Valu
file:///conversion/tmp/scratch/414498637.xls
2 of 5
WEEKLY CHECKLIST - UPS
Process UPS - 8500 B
Sr. No
Stage Description
Valu
file:///conversion/tmp/scratch/414498637.xls
3 of 5
WEEKLY CHECKLIST - UPS
                               Date:
5/3/2004
Proc
file:///conversion/tmp/scratch/414498637.xls
4 of 5
WEEKLY CHECKLIST - UPS
             Checklist filled by:  
ALTAF/AZAM/SAJ
file:///conversion/tmp/scratch/414498637.xls
5 of 5
WEEKLY CHECKLIST - UPS
f.
General
1
Inlet Air Temperature
28