No DESCRIPTION VOLUME SATUAN TOTAL
SATUAN
I Site Preperation
-Persiapan Lahan By PSMI 1.00 Lot
-Mobilization & Demobilization
B Pendestal
a. Cor Beton K-300 17.29 m3 200,000.00 3,458,000.00
b. Bekisting 36.00 m2 50,000.00 1,800,000.00
c. Pembesian 1,459.92 Kg 4,500.00 6,569,640.00
d. Pemasangan Angkur 20.00 titik 7,000.00 140,000.00
TOTAL 57,373,190.00
Profit 10%
Grand total 57,373,190.00
Dibulatkan 57,374,000.00
Lima Puluh Tujuh Juta Tiga Ratus Tujuh Puluh Empat Ribu Rupiah
PEMBORONG
SARNITO