You are on page 1of 1

1.

Remove SOE approved


2. Change from Sven to Eight
3. Remove Primevera and add ERP software
4. Remove entire line
5. Put Experience as Follows
Nov'18 to Present Jazal Engineering and Contracting LLC Quantity
Surveyor/Cost Controller
Nov'14 to Nov'18 Bin Shafar Contracting LLC Quantity Surveyor/Cost
Controller
Aug'13 to Aug'14 Mfar Construction Pvt. LTD Junior Quantity Suveyor
Jan'11 to Aug'13 Bahuleyan Constructions Site Engineer
6. Change 2015 to 2005
7. Change Document approval to ERP software
8. Change address to Room No 402, Madianat Zayed, Abu Dhabi
9. Change duties and responsibilities as follows
 Verification of contract Documents and Project Specification
 Making the Tender queries to get clarifications.
 Review the scope of work based on construction drawings and contract
conditions. Quantity Take off as per site & Escalation cost claiming
 Monitoring the Budget and making sure the project does not go over
 Preparing the Cash Flow program for the Project
 Prepare the Details quantity of as per the approved drawing and ensure the
actual quantity done at site, if it's difference then claim the variation along
the running bill accounts with the approval of Consultant and clients
 Preparing Interim Bill Based on the monthly Progress
 Prepare cost and value comparisons on a monthly basis
 Identify the required potential sub-contractors and obtain competitive prices
 Certifying the Payment Certificate for the Sub contractor work done
 Communicating with Client/Consultant/Sub-Contractor as per the professional
requirement.
 Monitoring the progress and submitting the reports to the Project Manager.
10. Change project Details as follows
 Put Danube
 Put Serenia
 Put Binshafar Building
 Lulu Hypermarket, WTC, (Client - Lulu, Developer – Al Dar Properties,
Consultant – Peter Dew and Associates.

You might also like