Faizan Bakht
Sumbal
Reg. No.
BSCT01111020
Semester # 5
(morning)
BS-Civil Tech.
ACKNOWLEDGEMENT
“Starting with the name of ALLAH the most beneficent and the most merciful whose
blessings are abundant and favors are unlimited.”
As a mater a fact, people tend to forget those who are behind their achievements and
have stood for them whenever they need assistant. Our gratitude will be meaningless if
we are not grateful to almighty Allah for His kindness upon us. His benevolence and
blessings have made us capable.
I am extremely grateful to Project Manager Mr. Shahbaz Ali Qureshi who spent a lot
of valuable time with me and gave all the related information and expertise very
generously about related work at site.
3
Table of Contents
Table of Contents --------------------------------------------------------------------------------- 4
Introduction of Organization----------------------------------------------------------------------- 5
Projects--------------------------------------------------------------------------------------------- 5
Completed Projects: -------------------------------------------------------------------------------- 5
FWT Hospital : ------------------------------------------------------------------------------------- 5
HIT COMPLEX TAXILA, PAKISTAN:------------------------------------------------------------- 6
WHISPERING PINES VILLAS PATRIATA, PAKISTAN:------------------------------------------ 7
EXPO CENTER LAHORE, PAKISTAN: ----------------------------------------------------------- 7
US CONSULATE HERAT, AFGHANISTAN: ------------------------------------------------------ 8
Projects in Hand: ---------------------------------------------------------------------------------- 8
Pearl City, Multan:--------------------------------------------------------------------------------- 8
Walled City ,Lahore: ------------------------------------------------------------------------------- 9
Future Projects: ------------------------------------------------------------------------------------ 9
Project Master Plan ------------------------------------------------------------------------------- 11
PROJECT DATA ------------------------------------------------------------------------------------ 12
Project Scope-------------------------------------------------------------------------------------- 12
Design Wise division ------------------------------------------------------------------------------ 12
Covered Area of Project -------------------------------------------------------------------------- 12
Group Wise Division ------------------------------------------------------------------------------ 13
4
Introduction of Organization
Qavi was established in May 1979, as a partnership concern under the name of “Qavi
Engineers”. After doing brisk business for over three years, it was incorporated as a private
limited company in November 1982. Since then Qavi Engineers Ltd. has rapidly grown in
stature, experience and reputation.
The company, in a very short span of time, completed projects of various nature including
Residential units, Industrial buildings, Allied services and Metallic Roads. This was made
possible because of the inherent organizational flexibility and versatility of the company, which
enabled it to simultaneously undertake projects at different locations. Decentralized control and
delegation of authority and responsibility to Project Managers ensured quick decisions, efficient
material and labor utilization and hence early completion of works.
In 2010, Qavi went international, with its first project in Herat Afghanistan entailing the creation
of United States Consulate.
Projects:
Completed Projects:
FWT Hospital :
Client:
Location:
Islamabad
5
HIT COMPLEX TAXILA, PAKISTAN:
Location:
Taxila
Largest Clear Span Pre-Engineered Structure in Pakistan with a span of 62 meters. Building
includes office areas on both sides of the structure with roof mounted crane systems.Front office
comprise of high end interior and exterior finish. Exterior finish includes Glass structure glazing,
alluco paneling and vertical granite application on walls and imported marble. Office interior
space is complete with porcelain tiles and UPVC do
6
WHISPERING PINES VILLAS PATRIATA, PAKISTAN:
Location: Murree
Qavi Engineers was entrusted with the design, development and construction of Whispering
Pines, a gated community of luxury residential villas situated on a scenic mountain tourist
destination. The project was challenging in both design and construction. Recent earthquake in
adjacent areas required in depth review of architectural and structural designs and construction
on a mountain slope with three water channels running through it.
Spread over 50 acres, Expo Center Lahore is Pakistan’s largest and most advanced Exhibition
Center. QEL is tasked with construction of all four exhibition halls (pre-engineered) with each
hall (100M x 62M) accompanied by a 3 storey RCC building. Infrastructure development
includes water supply network, waste management, electrical works covering HT, LT and
internal wiring and voice + data networking.
7
US CONSULATE HERAT,
AFGHANISTAN:
Client:
US Department of State
Location:
Afghanistan
Projects in Hand:
Hashoo Group
Multan
8
Walled City ,Lahore:
Location:
Lahore
Future Projects:
NESPAK HOUSE, ISLAMABAD, PAKISTAN
Location:
Islamabad
National Engineering Services Pakistan (Pvt.) Limited (NESPAK) is Pakistan’s premier consultancy organization. Its
international stature is well established and it enjoys the reputation of being one of the top engineering consultancy
organizations in Asia and Africa and is ranked amongst the world’s top 200 consulting firms. Qavi Engineers has
been entrusted by NESPAK to construct its Islamabad Office. QEL was selected again to extention of this buiding
9
10
Project Master Plan
11
PROJECT DATA
Project Scope
500 sq yards villas …………………………….. 64 villas
250 sq yards villa ……………………………… 36 villas
Total number of Villas ……………………………… 100 villas
12
Group Wise Division
Group – 01 (M+P+I)(21+2+1) ………….…………… 24 villas
Group – 02 (I+P)(17+4) …………………………… 21 villas
Group – 03 (I+R)(19+2) …………………………… 21 villas
Group – 04 (R+D)(13+4) …………………………… 17 villas
Group – 05 (R+D)(15+2) …………………………… 17 villas
13