SAP Multiresource Scheduling is a module introduced by SAP specially to assign required employees or
resources for working on plant maintenance order operations as well as service orders demand. Other SAP
modules where SAP MRS can be integrated are as follows.

 SAP CRM service orders


 Projects from Project System
 Projects from Collaboration Projects (cProjects)

SAP Multiresource Scheduling help us to:

1. Check availability of resources


2. Assign suitable employees to requirements (demands) from different areas
3. Assign production resource tools using SAP MRS.
4. Check material availability from planning board itself.
5. Check qualification for resources from planning board and assign them suitable task or demand.and
6. Check report for resource availability and number of demands assigned to him from planning board
itself.

In this edition of blog we are going to understand, how SAP MRS is deeply integrated with SAP HCM.

How SAP HCM Employees are Planned as Resources.

SAP MRS is all about planning of available resources working within organization. Like Maintenance
Department, Project Department or Service division.

We can work with resources two ways i.e. either creating employee master data or creating employee as
Business Partners in the role employee. Few functions does not work when we consider employees as
Business Partners.

Reference :- https://help.sap.com/viewer/7a593796fb564c7a9e832b8b6a476863/10/en-US

Below are few steps to start with the HCM configuration

Step 1:-Configure Basic Settings

We have to model personnel resources:

Either as As business partners with the employee role OR As employees in SAP ERP HR.

We specify the option that we want to use at client level in Customizing for SAP Multiresource Scheduling at

Basic Settings >> Configure Basic Settings.


In above screen shot we can see that we have specifically chosen HR resource. This integration will rule
further configuration of resources, their availability, qualification and requirement profile.

Based upon this configuration, we need to create employee master, assign them required info types and
transfer their availability, vacation, substitutes and holiday calender to SAP MRS.

The role of SAP HCM consultant is very crucial in implementation of this module, so it is recommended that
MRS consultant should have basic knowledge of employee master.(But Not Mandatory).

Step 2:- Configure Settings for HR Integration (ERP)

As mentioned in above, when we use SAP HR for personnel resources, we need to transfer availability
information from SAP HR to SAP Multiresource Scheduling and vice versa. To perform this task, standard
infotypes need to be configured and transferred in both directions. i.e. SAP MRS to ECC and viceversa.

 Absence (infotype 2001)


 Attendance (infotype 2002)
 Alternative working times or (infotype 2003)
Important Note :- Planned working time (infotype 0007) can only be transferred from SAP HR to SAP
Multiresource Scheduling.So it is not maintained in above MRS configuration.

Master Data Creation for resource utilization.


Next step after configuration is creation of Master Data. Following are important master data, which needs to
be created in SAP HCM.

1. Create Organization Structure and Staffing – Transaction Code – PPOME

Organizational Unit represents a Human resource department in our organization. Based upon hierarchy in the
organization and task divided, we can divide department in organization structure along with position
allocated under that department. For e.g. If we have organization where we provide services to customer, then
we can create service department under organization header and allocate different positions under it to carry
out task or provide services to customer.

One of the simple Representation of the reporting structure and the distribution of tasks using organizational
units (departments, for example) in an enterprise is as follows.
Courtesy – SAP

For demo purpose let us have a look at below structure.


According to how tasks are divided within an enterprise,This structure differs and might contain multiple
levels or few levels.

When we maintain organization unit, following views we need to maintain so that we could get correct
reporting.

 Basic Data
 Account Assignment
 Cost distribution
 Address
 Work schedule
 Quota planning

Let’s see one example how it looks in SAP.

In above example, we can see that simple structure of Project Department is defined where,

Manager is assigned to department, whereas resources are reporting to Manager.

Under each head of Senior Mechanic or Senior Technician, we can assign multiple resources.

2. Create Employee Master Using Transaction Code PA30 with info type mentioned above.

Employee master is nothing but collection of employee details in information system. Master file of Employee
contains descriptive data, such as name of the employee, his hiring status, whether he is contractor or
permanent employee, his personal as well as working details.
We need to maintain all details related to employee in employee master taking care that infotypes which are
configured in SAP MRS are used while maintaining data, other wise it will not work.

3.Maintain Working Hours, Vacations and Various time frames required for employee as
per business requirement.

Based upon infotype 2002, we need to maintain, work schedule for employee for required period.
4.And Most important part, transfer all these working hours to SAP MRS using
program “/MRSS/HCM_RPTWFMIF”.

We have to transfer working hours of employees along with his vacations, holidays, substitute data etc. to
SAP MRS, so that while scheduling of demand, we will come to know, which resource is available, who is on
vacation, who needs substitute, who is underutilized and over-utilized.

We can create batch job for this program, so that in future, as per batch frequency, working hours of
employees will get transfer to SAP MRS.

5. Assign these resources in SAP ECC work center.

We have to assign these all resources created, in work center master. This is important because we have to
establish relationship between work center assigned to work order with employees available. We can see
employee available in internal tab of work order, if these settings are good.
6. Now, we can start using this work centers in work orders and link between SAP MRS resources and
Work orders is established.

In below screen shot, we can see that once work center is assigned to operation, resource and its suitability is
also displayed.

This makes easier for taking decisions on resource allocation.


Hope above procedure helps to start for SAP MRS basic setting.

For more information please refer the online documentation at:

1.MRSS Help Link

http://help.sap.com/mrs1000

2. Employee Profile Maintenance

https://help.sap.com/viewer/7a593796fb564c7a9e832b8b6a476863/10/en-
US/45c1e4edb98b47f2e10000000a114a6b.html

3. Availability Transfer Between SAP ERP HCM and SAP Multiresource Scheduling

https://help.sap.com/viewer/7a593796fb564c7a9e832b8b6a476863/10/en-
US/d29281a89c244ceabfbf5a592fe96576.html

4. Master Data and Organization Unit.

https://help.sap.com/viewer/7a593796fb564c7a9e832b8b6a476863/10/en-
US/473c52db2d152f35e10000000a1553f6.html
In coming editions we will discuss further more points on SAP MRS.

Please feel free to comment and add knowledge points.

Thanks and Regards

Pankaj U. Nimkar