You are on page 1of 1

ORGANIZATIONAL CHART OF QUALITY CONTROL LABORATORY

Q.C Manager Assistant Manager

Q.C Supervisor Q.C Supervisor Q.C Supervisor


(Goods-in-process (Research & (Raw Material)
/Finished product) Development/Stability Testing)

Analyst 1, 2, 3 Analyst 1 Analyst 1, 2, 3

Researchers – will be the one to get


Q.A – will be the one to get the the sample from the research studies Sampler 1, 2, 3
sample from the production
Sampler – will be the one to get the
stability testing Sampler – will be the one to get the
sample from the delivery
-they get sample from TOP, MIDDLE
AND BOTTOM for every batch per
FOR STABILITY TESTING:
tank
Actual Stability- samples from the
production site.
Withdrawal of samples depends on
the product.

for example:
each batch will withdraw every 1
month, 3 months, 1 yr-5years, then
every 5 years.

Accelerated Stability - samples from


modified products done by the
reseachers, this are samples to be
monitored inside the oven and will
withdraw also depends on the
product specification or the
researcher

Note: withdrawal of samples of


stability testing means that the
sample will be analyze by its standard
specification.

You might also like