PORTFOLIO OF POWER GENERATION AND TRANSMISSION LINE PROJECTS BEING IMPLEMENTED BY

PPIB UNDER THE CHINA-PAKISTAN ECONOMIC CORRIDOR (CPEC)

Financial
Capacity
S# Project Name Fuel Location Outlay/Project cost Status
(MW)
(US$ M)
1 Sahiwal Coal Power Project Imported Coal Sahiwal, Punjab 1,320 1912.2 Commissioned
Port Qasim Coal Power 1912.2
2 Imported Coal Port Qasim, Sindh 1,320 Commissioned
Project
3 HUBCO Coal Power Project Imported Coal Hub, Balochistan 1,320 1912.2 Under construction
Engro Thar Coal Power &
4 Thar Coal Thar Block-II, Sindh 660 995.4 Under construction
Mine Project
Shanghai Electric Coal
5 Thar Coal Thar Block-I, Sindh 1,320 1912.2 Under Financial Closing
Power & Mining
HUBCO Thar Coal Power
6 Thar Coal Thar Block-II, Sindh 330 497.70 Under Financial Closing
Project
ThalNova Thar Coal Power
7 Thar Coal Thar Block-II, Sindh 330 497.70 Under Financial Closing
Project
8 Gwadar Coal Project Imported Coal Gwadar, Balochistan 300 Yet to be determined Under Tariff Determination
Thar Electricity (Oracle) Under issuance of NTP/LOI to
9 Thar Coal Thar Block-VI, Sindh 1,320 Yet to be determined
Coal Project Phase-I (700 MW)
River Jhelum,
10 Karot Hydropower Project Hydro 720 1698 Under construction
Punjab *
Suki Kinari Hydropower
11 Hydro River Kunhar, KP 870 1956 Under construction
Project
12 Kohala Hydropower Project Hydro River Jhelum, AJ&K 1,124 2355 Under Financial Closing
Total (MW) 10,934
Matiari-Lahore HVDC
HVDC + 660
13 Transmission Line of 4000 Sindh & Punjab 4,000 1658.34 Under Financial Closing
kV
MW load carrying capability

* Located at dual boundary of Punjab & AJ&K