Professional Documents
Culture Documents
JORC - Standard Exploration Procedure PDF
JORC - Standard Exploration Procedure PDF
STANDARD PROCEDURE
INTRODUCING
SRK CONSULTING
Patrick J. Hanna (Principal Consultant)
Graeme Duncan (Associate Senior Mine Eng.)
Yoga Suryanegara (Senior Consultant)
Tri Yoso (Senior Consultant)
Galih Lutfihadi (Consultant)
Eko Agus (Consultant)
BACKGROUND
JORC Code
•MINE DEVELOPMENT
¾INFILL DRILLING
PRELIMINARY DRILLING
•DEFINES IN-SITU COAL CONDITION (IN FRESH
CONDITION)
•PROSPECT AREA
DEEP DRILLING
•DEFINES LIFE-OF-MINE RESOURCES
•INFERRED RESOURCES
SHALLOW DRILLING
•DEFINES 10-YEAR RESOURCES
•INDICATED RESOURCES
INFILL DRILLING
•GENERAL STRATIGRAPHIC OF
COAL BEARING FORMATION
•LACK OF DATA (FIELD SECTION
DATA)
•LACK OF COAL QUALITY DATA
•UN-CORRECT GEOLOGY MODEL
INTERPRETATION
PRIORITY OF EXPLORATION AREA
•STAGE OF EXPLORATION
PROGRAM
•KEY WORD : QUANTITY (BULK),
QUALITY, COAL LOGISTIC
TRANSPORTATION
STAGE OF EXPLORATION
(GENERAL INFORMATION)
•CONSEQUENCES
¾UNDER-ESTIMATING RESOURCES AND ECONOMICS
¾INCORRECT COAL QUALITY ESTIMATION
QUALITY OF DRILLING DATA
MAJOR ISSUES
•COAL QUALITY
¾UNRELIABLE RESULTS DUE TO SAMPLING
PROCEDURES
¾CURRENTLY ESTIMATED AFTER MINING
•CONSEQUENCES
¾OVER-ESTIMATING CALORIFIC VALUE OF COAL
¾INCORRECT COAL DENSITY ESTIMATION AND
INSITU TONNAGE
QUALITY OF DATA
MINOR ISSUES
•LOGGING IN SPLITS
¾MORE ACCURATE SEAM DEPTH AND
THICKNESS INFORMATION
•CORE PHOTOGRAPHY
¾PERMANENT RECORD OF CORE FOR FUTURE
REFERENCE
JORC DRILLING PROGRAM
•MUST BE PLANNED CAREFULLY
¾EXPENSIVE AND CRUCIAL
•REQUIRED TO DELINEATE
¾INTERBURDEN VARIATIONS BETWEEN SEAMS
¾CHANGES IN SEAM DIP
¾QUALITY CONTENT IN MORE DETAIL
QUALITY PROBLEM
•HIGHLY UNPREDICTABLE
¾NO CORRECT PATTERN
¾NOT A COMMON PROBLEM
¾NOT UNDERSTOOD
•SUGGESTIONS
¾CORRECT STANDARD PROCEDURE IN
SAMPLING
¾TRAINED WELL SITE
¾MONITORING OF DRILLING ACTIVITY
¾REPUTABLE LABORATORIUM
THEREFORE
PRIORITY OF EXPLORATION AREA
GUNUNG
CATEGORIES MASAHA JANGKANG MAS
2 SEAM WITH 2 SEAM WITH 1 SEAM WITH
GENTLE GENTLE FLATT
QUANTITY DIPPING DIPPING DIPPING
PRIORITY 2 1 3
EXPLORATION PROGRAM FOR
LONG-TERM PLANNING
•REQUIRE TO DELINEATE POTENTIAL
MINING AREAS
•1ST REPORT
•2ND REPORT
•3RD REPORT
STRATEGY FOR COMPILING
JORC REPORT
•TRAIN ALL FIELD GEOLOGIST
•MASAHA
•JANGKANG
•GUNUNG MAS
•OTHER POTENTIAL AREA
•ON-GOING EXPLORATION
MASAHA AND JANGKANG
GUNUNG
MASAHA JANGKANG MAS TOTAL
DRILLING COSTS
ANALYSIS
E-LOGGING
ADMINISTRATION
TOTAL
COST BASIS
SHALLOW
DEEP BORES BORES CORED SEAMS
MASAHA
JANGKANG
GUNUNG MAS
STRATEGY FOR COMPILING
JORC REPORT