You are on page 1of 6

Obra

Ejecutor : CONSORCIO ESPERANZA


Supervisor : AV
PRUEBA HIDRAULICA

Tiempo
Diametro Longitu
de
Buzon del Buzon al de d Pendient
N° Localidad Fecha
Nº Nº
Clase de Tuberia
Tuberia probada e (S=%)
prueba
T
Øi (mm) L (m)
(mints)
1 Caururo 3/1/2019 44 43 PVC-ISO 4435 S-25 153.60 35.50 -2.00% 720.00
2 Caururo 3/1/2019 43 42 PVC-ISO 4435 S-26 153.60 36.20 -3.84% 720.00
3 Caururo 3/1/2019 42 41 PVC-ISO 4435 S-27 153.60 50.00 -9.52% ###
4 Caururo 3/1/2019 41 40 PVC-ISO 4435 S-28 153.60 32.90 -8.33% 720.00
5 Caururo 3/1/2019 40 Bz 2B PVC-ISO 4435 S-29 153.60 25.40 -5.43% ###
6 Caururo 3/1/2019 39 Nuevo1 PVC-ISO 4435 S-30 192.20 19.00 -4.79% 720.00
7 Caururo 3/8/2019 Nuevo1 38 PVC-ISO 4435 S-31 192.20 18.00 -4.81% ###
8 Caururo 3/8/2019 38 20 PVC-ISO 4435 S-32 192.20 50.00 -11.84% 720.00
9 Caururo 3/1/2019 37 36 PVC-ISO 4435 S-33 153.60 14.40 -9.79% 720.00
10 Caururo 3/1/2019 36 35 PVC-ISO 4435 S-34 153.60 48.20 -14.02% 720.00
11 Caururo 3/1/2019 35 34 PVC-ISO 4435 S-35 153.60 42.90 -12.54% 720.00
12 Caururo 3/1/2019 34 33 PVC-ISO 4435 S-36 153.60 40.40 -1.04% ###
13 Caururo 3/8/2019 33 32 PVC-ISO 4435 S-37 153.60 7.70 -10.52% 720.00
14 Caururo 3/8/2019 32 31 PVC-ISO 4435 S-38 153.60 47.10 -6.28% 720.00
15 Caururo 3/8/2019 31 23 PVC-ISO 4435 S-39 153.60 35.90 -11.34% ###
16 Caururo 3/1/2019 30 29 PVC-ISO 4435 S-40 153.60 49.50 -0.91% 720.00
17 Caururo 3/1/2019 29 24 PVC-ISO 4435 S-41 192.20 27.50 -2.27% ###
18 Caururo 3/6/2019 28 27 PVC-ISO 4435 S-42 153.60 20.70 -6.81% 720.00
19 Caururo 3/6/2019 27 26 PVC-ISO 4435 S-43 153.60 26.00 -3.69% ###
20 Caururo 3/6/2019 26 25 PVC-ISO 4435 S-44 153.60 49.70 -4.06% 720.00
21 Caururo 3/1/2019 25 24 PVC-ISO 4435 S-45 153.60 50.00 -7.74% ###
22 Caururo 3/1/2019 24 23 PVC-ISO 4435 S-46 192.20 23.40 -0.51% 720.00
23 Caururo 3/12/2019 23 22 PVC-ISO 4435 S-47 192.20 30.60 -1.76% 720.00
24 Caururo 3/12/2019 22 21 PVC-ISO 4435 S-48 192.20 42.90 -0.09% ###
25 Caururo 3/12/2019 21 20 PVC-ISO 4435 S-49 192.20 41.30 -3.29% 720.00
26 Caururo 3/5/2019 20 19 PVC-ISO 4435 S-50 192.20 48.20 -11.14% ###
27 Caururo 3/5/2019 19 Nuevo2 PVC-ISO 4435 S-51 192.20 29.61 -9.96% ###
28 Caururo 3/5/2019 Nuevo2 18 PVC-ISO 4435 S-52 192.20 19.39 -13.51% 720.00
29 Caururo 3/5/2019 18 Nuevo3 PVC-ISO 4435 S-53 192.20 19.00 -11.63% ###
30 Caururo 3/5/2019 Nuevo3 17 PVC-ISO 4435 S-54 192.20 17.00 -7.18% 720.00
31 Caururo 3/22/2019 17 6 PVC-ISO 4435 S-55 192.20 50.00 -9.58% 720.00
32 Caururo 3/13/2019 16 15 PVC-ISO 4435 S-56 153.60 48.60 -4.12% 720.00
33 Caururo 3/13/2019 15 14 PVC-ISO 4435 S-57 153.60 37.80 -2.09% ###
34 Caururo 3/13/2019 14 13 PVC-ISO 4435 S-58 153.60 48.90 -5.24% 720.00
35 Caururo 3/21/2019 13 12 PVC-ISO 4435 S-59 192.20 17.90 -7.26% ###
36 Caururo 3/21/2019 12 11 PVC-ISO 4435 S-60 192.20 40.10 -8.38% 720.00
37 Caururo 3/21/2019 11 10 PVC-ISO 4435 S-61 192.20 34.00 -8.79% ###
38 Caururo 3/23/2019 10 9 PVC-ISO 4435 S-62 192.20 28.10 -2.17% ###
39 Caururo 3/23/2019 9 8 PVC-ISO 4435 S-63 192.20 47.40 -5.23% 720.00
40 Caururo 3/28/2019 8 7 PVC-ISO 4435 S-64 192.20 50.00 -8.68% ###
41 Caururo 3/28/2019 7 6 PVC-ISO 4435 S-65 192.20 50.00 -4.78% ###
42 Caururo 3/26/2019 6 5 PVC-ISO 4435 S-66 192.20 41.40 -6.04% 720.00
43 Caururo 3/26/2019 5 4 PVC-ISO 4435 S-67 192.20 50.00 -9.12% 720.00
44 Caururo 3/26/2019 4 3 PVC-ISO 4435 S-68 192.20 11.90 -11.85% 720.00
45 Caururo 3/26/2019 3 2 PVC-ISO 4435 S-69 192.20 41.90 -8.85% ###
46 Caururo 3/26/2019 2 1 PVC-ISO 4435 S-70 192.20 34.00 -10.91% 720.00
47 Caururo 3/26/2019 1 ExistentePVC-ISO 4435 S-71 192.20 35.00 -11.40% ###

RESIDENTE

PRUEBA HIDRAULICA DEL TRAMO 01 EL CALVARI

Tiempo
Diametro Longitu
de
Buzon del Buzon al de d Pendient
Localidad Fecha Clase de Tuberia prueba
Nº Nº Tuberia probada e (S=%)
T
Øi (mm) L (m)
(mints)
El calvario 6/14/2014 Bz 3 Bz 4 PVC-UF 160.00 32.60 -1.68% 60.00
El calvario 6/14/2014 Bz 4 Bz 5 PVC-UF 160.00 80.00 -1.15% 60.00
El calvario 6/14/2014 Bz 5 Bz 6 PVC-UF 160.00 56.53 -4.35% 60.00
El calvario 6/14/2014 Bz 6 Bz 7 PVC-UF 160.00 24.00 -4.35% 60.00
El calvario 6/14/2014 Bz 7 Bz 11 PVC-UF 160.00 39.30 -1.12% 60.00
El calvario 6/14/2014 Bz 11 Bz 12 PVC-UF 160.00 20.36 -2.35% 60.00
El calvario 6/14/2014 Bz 12 Bz 15 PVC-UF 160.00 43.50 -3.30% 60.00
El calvario 6/14/2014 Bz 15 Bz 16 PVC-UF 160.00 104.68 -8.42% 60.00
El calvario 6/14/2014 Bz 16 Bz 17 PVC-UF 160.00 48.70 -11.05% 60.00
El calvario 6/14/2014 Bz 17 Bz 17A PVC-UF 160.00 63.00 -12.03% 60.00
El calvario 6/14/2014 Bz 17A Bz 18 PVC-UF 160.00 70.50 -6.27% 60.00
El calvario 6/14/2014 Bz 18 Bz 21 PVC-UF 160.00 74.80 -13.82% 60.00
El calvario 6/14/2014 Bz 21 Bz 22 PVC-UF 160.00 21.00 -7.50% 60.00
El calvario 6/14/2014 Bz 22 Bz 23 PVC-UF 160.00 69.00 -6.11% 60.00
El calvario 6/14/2014 Bz 23 Bz 23A PVC-UF 160.00 48.00 -7.71% 60.00
El calvario 6/14/2014 Bz 23A Bz 24 PVC-UF 160.00 80.00 -7.59% 60.00
El calvario 6/14/2014 Bz 24 Bz 25 PVC-UF 160.00 63.00 -9.11% 60.00
El calvario 6/16/2014 Bz 25 Bz 25A PVC-UF 160.00 35.00 -10.84% 60.00
El calvario 6/16/2014 Bz 25A Bz 25B PVC-UF 160.00 38.00 -7.96% 60.00
El calvario 6/16/2014 Bz 25B Bz 26 PVC-UF 160.00 58.00 -5.72% 60.00
El calvario 6/16/2014 Bz 26 Bz 27 PVC-UF 160.00 51.00 -9.09% 60.00
El calvario 6/16/2014 Bz 27 Bz 28 PVC-UF 160.00 78.00 -6.30% 60.00
El calvario 6/16/2014 Bz 28 Bz 29 PVC-UF 160.00 94.00 -14.67% 60.00
El calvario 6/16/2014 Bz 29 Bz 29A PVC-UF 160.00 54.00 -8.71% 60.00
El calvario 6/16/2014 Bz 29A Bz 30 PVC-UF 160.00 65.00 -15.36% 60.00
El calvario 6/16/2014 Bz 30 Bz 30A PVC-UF 160.00 55.00 -17.61% 60.00
El calvario 6/16/2014 Bz 30A Bz 31 PVC-UF 160.00 68.00 -9.08% 60.00
El calvario 6/16/2014 Bz 31 Bz 32 PVC-UF 160.00 33.00 -15.77% 60.00
El calvario 6/16/2014 Bz 32 Bz 32A PVC-UF 160.00 77.00 -11.66% 60.00
El calvario 6/16/2014 Bz 32A Bz 33 PVC-UF 160.00 57.00 -9.40% 60.00
El calvario 6/16/2014 Bz 33 Bz 33A PVC-UF 160.00 65.00 -9.88% 60.00
El calvario 6/24/2014 Bz 33A Bz 34 PVC-UF 160.00 29.00 -12.39% 60.00
El calvario 6/24/2014 Bz 34 Bz 35 PVC-UF 160.00 90.00 -13.00% 60.00
El calvario 6/24/2014 Bz 35 Bz 36 PVC-UF 160.00 67.00 -9.23% 60.00
El calvario 6/24/2014 Bz 36 Bz 36A PVC-UF 160.00 55.00 -14.69% 60.00
El calvario 6/24/2014 Bz 36A Bz 37 PVC-UF 160.00 50.00 -3.24% 60.00
El calvario 6/24/2014 Bz 37 Bz 37A PVC-UF 160.00 65.00 -10.35% 60.00
El calvario 6/24/2014 Bz 37A Bz 38 PVC-UF 160.00 72.00 -10.96% 60.00
El calvario 6/24/2014 Bz 38 Bz 39 PVC-UF 160.00 118.40 -16.98% 60.00
El calvario 6/24/2014 Bz 39 Bz 40 PVC-UF 160.00 87.00 -15.25% 60.00
El calvario 6/24/2014 Bz 40 Bz 41 PVC-UF 160.00 47.00 -9.61% 60.00
El calvario 6/24/2014 Bz 41 Bz 41A PVC-UF 160.00 54.00 -2.85% 60.00
El calvario 6/24/2014 Bz 41A Bz 42 PVC-UF 160.00 65.00 -3.00% 60.00
El calvario 6/24/2014 Bz 42 Bz 42A PVC-UF 160.00 59.00 -2.78% 60.00
El calvario 6/24/2014 Bz 42A Bz 42B PVC-UF 160.00 71.00 -6.11% 60.00
El calvario 6/24/2014 Bz 42B Bz 42C PVC-UF 160.00 50.00 -3.04% 60.00
El calvario 6/24/2014 Bz 42C Bz 42D PVC-UF 160.00 77.00 -3.43% 60.00

RESIDENTE

PRUEBA HIDRAULICA DEL TRAMO 02 EL CALVAR

Tiempo
Diametro Longitud
Buzon del Buzon al Pendient de prueba
Localidad Fecha Clase de Tuberia de Tuberia probada
Nº Nº e (S=%) T
Øi (mm) L (m)
(mints)

El calvario 6/13/2014 Bz 8 Bz 9 PVC-UF 160.00 78.00 -12.97% 60.00


El calvario 6/13/2014 Bz 9 Bz 9A PVC-UF 160.00 40.00 -6.89% 60.00
El calvario 6/13/2014 Bz 9A Bz 10 PVC-UF 160.00 48.00 -0.950% 60.00
El calvario 6/13/2014 Bz 10 Bz 7 PVC-UF 160.00 32.00 -1.24% 60.00

RESIDENTE
AULICA

Altura
Diametr Altura de Altura Filtración Filtración
de
o de Descenso final de Admisible habida en Resultado de
inicial
Buzon en Buzón Buzon en Prueba Prueba Prueba
Buzon
D (cm) h (cm) (m) Fa (Lts/dia) Fh (Lts/Hr)
H (m)
0.90 0.80 0.00 0.90 25.63 0.00 BUENA
1.70 0.80 0.02 1.68 26.13 1.41 BUENA
0.90 0.80 0.00 0.90 36.10 0.00 BUENA
0.90 0.80 0.00 0.90 23.75 0.00 BUENA
0.90 0.80 0.01 0.89 18.34 0.18 BUENA
0.90 0.80 0.00 0.90 17.16 0.00 BUENA
0.90 0.80 0.00 0.90 16.26 0.00 BUENA
0.90 0.80 0.00 0.90 45.17 0.00 BUENA
0.90 0.80 0.01 0.89 10.40 0.20 BUENA
0.90 0.80 0.00 0.90 34.80 0.00 BUENA
0.90 0.80 0.00 0.90 30.97 0.00 BUENA
0.90 0.80 0.02 0.88 29.17 0.56 BUENA
1.80 0.80 0.00 1.80 5.56 0.00 BUENA 747.80
1.50 0.80 0.00 1.50 34.00 0.00 BUENA 917.60
0.90 0.80 0.01 0.89 25.92 0.25 BUENA 1,665.40
0.90 0.80 0.00 0.90 35.74 0.00 BUENA
1.90 0.80 0.00 1.90 24.84 0.00 BUENA
0.90 0.80 0.00 0.90 14.94 0.00 BUENA
0.90 0.80 0.00 0.90 18.77 0.00 BUENA
0.90 0.80 0.02 0.88 35.88 1.39 BUENA
0.90 0.80 0.00 0.90 36.10 0.00 BUENA
2.00 0.80 0.00 2.00 21.14 0.00 BUENA
2.50 0.80 0.02 2.48 27.64 1.54 BUENA
1.90 0.80 0.00 1.90 38.75 0.00 BUENA
0.90 0.80 0.00 0.90 37.31 0.00 BUENA
0.90 0.80 0.01 0.89 43.54 0.34 BUENA
1.20 0.80 0.01 1.19 26.75 0.21 BUENA
1.20 0.80 0.00 1.20 17.52 0.00 BUENA
1.20 0.80 0.01 1.19 17.16 0.15 BUENA
1.20 0.80 0.00 1.20 15.36 0.00 BUENA
1.20 0.80 0.00 1.20 45.17 0.00 BUENA
1.20 0.80 0.00 1.20 35.09 0.00 BUENA
1.20 0.80 0.02 1.18 27.29 0.61 BUENA
1.20 0.80 0.00 1.20 35.30 0.00 BUENA
1.20 0.80 0.00 1.20 16.17 0.00 BUENA
1.20 0.80 0.00 1.20 36.22 0.00 BUENA
1.20 0.80 0.00 1.20 30.71 0.00 BUENA
1.20 0.80 0.00 1.20 25.38 0.00 BUENA
1.20 0.80 0.01 1.19 42.82 0.76 BUENA
1.20 0.80 0.00 1.20 45.17 0.00 BUENA
1.70 0.80 0.02 1.68 45.17 0.98 BUENA
1.20 0.80 0.00 1.20 37.40 0.00 BUENA
1.20 0.80 0.00 1.20 45.17 0.00 BUENA
1.20 0.80 0.02 1.18 10.75 0.38 BUENA
1.20 0.80 0.00 1.20 37.85 0.00 BUENA
1.20 0.80 0.00 1.20 30.71 0.00 BUENA
1.20 0.80 0.00 1.20 31.62 0.00 BUENA

VºBº SUPERVISOR

RAMO 01 EL CALVARIO

Altura Diametr Altura de Volume Filtración Filtración


de o de Descenso n Permisible habida en Resultado de
Buzon Buzon en Buzón Filtrado en Prueba Prueba Prueba
H (m) D (cm) h (cm) V (Lts) Fp (Lts/Hr) Fh (Lts/Hr)
1.20 120.00 0.00 0.00 1.02 0.00 BUENA
1.20 120.00 0.00 0.01 2.51 0.01 BUENA
2.10 120.00 0.00 0.03 1.77 0.03 BUENA
2.50 120.00 0.00 0.00 0.75 0.00 BUENA
2.10 120.00 0.01 0.11 1.23 0.11 BUENA
2.00 120.00 0.01 0.11 0.64 0.11 BUENA
1.50 120.00 0.01 0.11 1.36 0.11 BUENA
1.50 120.00 0.00 0.02 3.28 0.02 BUENA
1.50 120.00 0.00 0.00 1.53 0.00 BUENA
1.50 120.00 0.00 0.02 1.97 0.02 BUENA
1.20 120.00 0.00 0.00 2.21 0.00 BUENA
1.20 120.00 0.00 0.00 2.34 0.00 BUENA
1.20 120.00 0.00 0.00 0.66 0.00 BUENA
1.20 120.00 0.00 0.00 2.16 0.00 BUENA
1.50 120.00 0.01 0.11 1.50 0.11 BUENA
1.20 120.00 0.00 0.00 2.51 0.00 BUENA
1.20 120.00 0.00 0.02 1.97 0.02 BUENA
1.20 120.00 0.00 0.00 1.10 0.00 BUENA
1.20 120.00 0.00 0.00 1.19 0.00 BUENA
1.20 120.00 0.00 0.00 1.82 0.00 BUENA
1.50 120.00 0.00 0.00 1.60 0.00 BUENA
1.20 120.00 0.00 0.00 2.44 0.00 BUENA
1.20 120.00 0.01 0.11 2.95 0.11 BUENA
1.20 120.00 0.00 0.00 1.69 0.00 BUENA
1.20 120.00 0.00 0.00 2.04 0.00 BUENA
1.20 120.00 0.00 0.02 1.72 0.02 BUENA
1.20 120.00 0.00 0.00 2.13 0.00 BUENA
1.20 120.00 0.00 0.00 1.03 0.00 BUENA
1.20 120.00 0.04 0.45 2.41 0.45 BUENA
1.20 120.00 0.00 0.00 1.79 0.00 BUENA
1.20 120.00 0.00 0.00 2.04 0.00 BUENA
1.20 120.00 0.00 0.00 0.91 0.00 BUENA
1.20 120.00 0.01 0.11 2.82 0.11 BUENA
1.20 120.00 0.00 0.00 2.10 0.00 BUENA
1.20 120.00 0.00 0.00 1.72 0.00 BUENA
1.20 120.00 0.00 0.00 1.57 0.00 BUENA
1.20 120.00 0.00 0.00 2.04 0.00 BUENA
1.20 120.00 0.01 0.11 2.26 0.11 BUENA
1.20 120.00 0.00 0.00 3.71 0.00 BUENA
1.20 120.00 0.00 0.00 2.73 0.00 BUENA
2.50 120.00 0.00 0.00 1.47 0.00 BUENA
1.20 120.00 0.02 0.23 1.69 0.23 BUENA
1.80 120.00 0.00 0.00 2.04 0.00 BUENA
1.20 120.00 0.00 0.00 1.85 0.00 BUENA
1.80 120.00 0.03 0.34 2.22 0.34 BUENA
1.50 120.00 0.00 0.00 1.57 0.00 BUENA
1.20 120.00 0.00 0.00 2.41 0.00 BUENA

VºBº SUPERVISOR

RAMO 02 EL CALVARIO

Diametro Altura de Filtración Filtración


Altura de Volumen
de Buzon Descenso Permisible habida en Resultado de
Buzon Filtrado
D en Buzón en Prueba Prueba Prueba
H (m) V (Lts)
(cm) h (cm) Fp (Lts/Hr) Fh (Lts/Hr)

1.20 120.00 0.01 0.11 2.44 0.11 BUENA


1.20 120.00 0.01 0.11 1.25 0.11 BUENA
1.20 120.00 0.00 0.03 1.50 0.03 BUENA
2.50 120.00 0.00 0.00 1.00 0.00 BUENA

VºBº SUPERVISOR