Professional Documents
Culture Documents
000
600
400
800
400
0200
E-354
9
0
9
9
N-828
N-829
N-828
N-828
N-828
N-829
10+000 11+000
00 2
E-354
PT9+950.421
PC10+057.616
PT10+127.669
Mid10+092.643
10+000 10+600 10+700 10+800 10+900 11+000
10+100 10+200 10+300 10+400 10+500
PLANO EN PLANTA
1.5 X 1.00
PROYECCIÓN UNIVERSAL TRANSVERSAL MERCATOR
DATO HORIZONTAL: W.G.S. - 84
00
0000
9800
9600
9200
9400
02
N-829
N-829
N-828
N-828
N-828
N-828
200
E-354
EST: 10+509.66
ELEV: 3851.506
ELEV: 3851.534
EST: 10+309.659
EST: 10+635.930
EST: 10+785.93
ELEV: 3851.265
ELEV: 3851.123
EST: 10+160.42
ELEV: 3851.146
0.241% -0.213%
Ext.
-0.001
-0.005
-0.010
-0.018
-0.028
-0.041
-0.056
-0.073
-0.092
-0.114
-0.092
-0.073
-0.056
-0.041
-0.028
-0.018
-0.010
-0.005
-0.001
0.000
0.000
SC Lc
0.000
0.001
0.003
0.007
0.013
0.020
0.029
0.039
0.045
0.033
0.024
0.016
0.010
0.005
0.002
0.000
CS
0.013
0.021
0.030
0.041
0.054
0.068
0.084
0.068
0.054
0.041
0.030
0.021
0.013
0.008
0.003
0.001
0.000
R
TS ST
1 1
2 2
1.5 1.5
1 1
10+125.57
10+132.57
10+139.57
PERALTE
OBRAS DE DRENAJE
1.5 1.5
1 1
10+000 10+100 10+200 10+300 10+400 10+500 10+600 10+700 10+800 10+900 11+000
PERFIL LONGITUDINAL
ESC. 1/2000 SECCION TIPICA EN BANQUETAS DE CORTE Y RELLENO
ESCALA: 1/75
PPL- 10
GOBIERNO REGIONAL DE PUNO HOR:
VER:
GERENCIA REGIONAL DE INFRAESTRUCTURA CABANILLA - CABANILLAS) Sistema Proyeccion WGS-84/19S-L SUB GERENCIA DE OBRAS ELABORADO POR:
CODIGO SNIP: 104300 APROVADO POR :
GESTION DEPARTAMENTO:
PUNO
PROVINCIA:
LAMPA
DISTRITO:
LAMPA
INFORME CORTE DE OBRA
2019 - 2022