Professional Documents
Culture Documents
2) INSTALL
(1) Carry out installation in the reverse order
to removal.
※ Take care of turning joint direction.
※ Assemble hoses to their original positions. 1
※ Confirm the hydraulic oil level and check
the hydraulic oil leak or not.
130ZF8TJ02
8-145
2. DISASSEMBLY AND ASSEMBLY
1) STRUCTURE
※ Descriptions are based on the without dozer blade.
14 3
15 6
10
12 4
11 5
11
9
8
14098TJ03
8-146
2) DISASSEMBLY 14
※ Before the disassembly, clean the turning 15
joint.
3
(1) Remove bolts (14), washer (15) and cover
(3).
21078DA10
21078DA11
(4) Place hub (1) on a V-block and by using a Secure with hand
wood buffer at the shaft end, hit out shaft Wooden block
(2) to about 1/2 from the body with a
hammer.
※ Take care not to damage the shaft (2)
when remove hub (1) or rest it sideway.
V block
※ Put a fitting mark on hub (1) and shaft (2).
Work bench
8-14(3) (360-7)
11
9
21078DA12
8-147
3) ASSEMBLY
※ Clean all parts.
※ As a general rule, replace oil seals and
O-ring.
※ Coat the sliding surfaces of all parts with
engine oil or grease before installing.
11
9
1
21078DA12
21078DA13
21078DA11
8-148
(7) Install cover (3) to body (1) and tighten
14
bolts (14).
15
·Torque : 10~12.5 kgf·m
(72.3~90.4 lbf·ft) 3
21078DA10
8-149