TO GHOGHA TO PANJWARA A1

A1 P1 P2 A2

TO GHOGHA TO PANJWARA
A1 P1 P2 A2

FX FR FX FR FX FR
A
B

RAIL TOP LEVEL


36.159

FOUNDING LEVEL FOUNDING LEVEL


FOUNDING LEVEL FOUNDING LEVEL KEY PLAN
DETAIL-A
NOTES:

P1

LONGITUDINAL ELEVATION

A1 P1 P2 A2

B
A

DETAIL-B

BH-1 BH-2 BH-3 BH-4


A B
PLAN AT DECK LEVEL

AT ARI
ION
Y. KCH
A1 P1 ST P2 A2
E
TO
RL

X-SECTION OF PLATE
GIRDER AT MID SPAN
ION
ST GHA

BH-1 BH-2 BH-3 BH-4


AT
RL GHO

PLAN AT PILE CAP LEVEL


Y.
TO

FRL
FRL

BORE HOLE DETAIL

HEAD QUARTER (E.R) KOLKATA MALDA DIVISION (E.R) ROB AT BHAGALPUR


RE WALL
CBE EASTERN RAILWAYS
DRM
GROUND LEVEL
GROUND LEVEL DY CE DIVISION : MALDA, SECTION : BHAGALPUR
PILE CAP TOP LEVEL W.S HQ Sr. DEN (CO-ORDN)
PILE CAP TOP LEVEL RLY. DRG. NO :
AEN/ROB
Sr. DOM CLIENT :

DRG. TITLE : GENERAL ARRANGEMENT DRAWING


PILE CAP BOTTOM LEVEL Sr. DSTE
PILE CAP BOTTOM LEVEL DESCRIPTION : PROPOSED ROBON 4-LANING OF NH-80 IN MUNGER
CEDE TO MIRZACHAUKI AT CH.132+670 (RAILWAY KM. 4
Sr. DEE/TRD
ACROSS BG RAILWAY LINE BETWEEN TP NO 4/5 TO
Dy. CEE/RE 4/6, IN BETWEE BHAGALPUR RAILWAY STATION AND
FOUNDATION LEVEL
FOUNDATION LEVEL
DIMENSIONS MENTIONED IN Sr. DEE - (G) BARAHAT RAILWAY STATION IN THE STATE OF
BIHAR OF MALDA DIVISION IN EASTERN RAILWAY)
SECTION A-A BRACKETS () ARE SQUARE DIMENSIONS Sr. DEE - 2
SECTION B-B
CHECKED BY : CHECKED BY :

SCALE: CLINT : PROOF CONSULTANT : CONTRACTOR : PROJECT: TITLE : PURPOSE OF ISSUE FOR APPROVAL
PREPARATION OF DETAILED PROJECT REPORT GENERAL ARRANGEMENT DRAWING FOR DRG. NO. KDCPL/SH-84/ROB/0+870/GAD/01
BIHAR STATE ROAD DEVELOPMENT M.G. CONTRACTORS PRIVATE FOR REHABILITATION, UPGRADATION AND PROPOSED ROB - AT CH. 0.870 ON SH-84
AS SHOWN DATE : APRIL-2019 DRAWN AG
CORPORATION LTD. LIMITED STRENGTHENING OF ROADS IN BIHAR UNDER GOGHA-BAZAR ROAD DIST. BHAGALPUR BIHAR DESIGN CHECKED APPROVED
ADB ASSISTED PHASE-II PROJECT
NO. DATE REVISION DRAWN CHECKED APPROVED
AD VV SK