You are on page 1of 32

B I N A

MAMPAN
VOLUME 2, 2018

B I N A Malaysia’s Sustainable

MAMPAN
VOLUME 2, 2018

Malaysia’s Sustainable
Construction Periodical
Construction Periodical

C O N T
CONTENTSE N T S
03 MyCREST
03 MyCREST
• Incentives to Reduce
• Incentives to Reduce
Construction Waste with MyCREST
Construction Waste with MyCREST

BESTPRACTICES
BEST PRACTICES 06
06
Designing with Minimal Waste in Mind •
Designing with Minimal Waste in Mind •

09
09
Peraturan-Peraturan 2016: •
Peraturan-Peraturan 2016: •
Cleaning Up Our Act in Construction
Cleaning Up Our Act in Construction

12
12
SustainableConstruction
Sustainable ConstructionBest
Best Practices:• •
Practices:
BetterWays
Better WaystotoDispose
Disposeofof Waste
Waste

15 PERSONALITY
15 PERSONALITY
• •Innovations
Innovations
in in Construction
Construction Site
Site
Waste
Waste Management
Management
19
19 CAREER
CAREER
• Confessions of a Landfill Engineer
• Confessions of a Landfill Engineer

R
R&D
& D 21
21
Levels of Waste: •
Levels ofWeigh-in
Experts Waste: on•
Experts Weigh-in
Inefficiencies on
in Construction
Inefficiencies in Construction

23
23
Using Supply Chain Management Strategies •
Using Supply to
Chain Management
Improve Strategies
Construction •
Practices
to Improve Construction Practices

P.U. (A)
WARTA KER

FED
P.U. (A)

PERATU
WARTA KER

ERAL GOVE
GAZETTE
RAN-PERAT
FEDERAL
AJAAN PER

RNMENT
AJAAN PER

SEKUTUGO VE
SEKUTUAN

AN RNMENT
GAZET TE
25NEWS
25 NEWS & EVENTS
& EVENTS
PEMBERSIH URAN PENGURUSA

• MyCREST Certification Begins Here


AN AWAM N SISA PEP
PERATURAN (SKIM EJAL
-PERATU PEMBINAAN BAGI SISA PEPEJA DAN
PEMBERSIHA RAN PENGURUSA L

• MyCREST Certification Begins Here


) 2015
SOLAM
N AW ID WA N SISA PEP
(SCH (SKSTE ANDI SISA
IM BAG PUBLIC EJAL DAN
PEMEME
BINFOR
AANCON PEPCLE
EJAANS
SOLID WAS 5 UCTION SOL L ING MANAGEMEN
) 201STR
TE AND ID WASTE) REG T
(SCHEME 2015
FOR CONSTR PUBLIC CLEANSING ULATIONS
UCTION SOL MAN
ID WASTE) AGEMENT
2015 REGULATIO
NS

• MAMPAN’s
20182018 Exhibition Participation
DISIARKAN
OLEH/

• MAMPAN’s Exhibition Participation


PUBLISHED
JABATAN BY
ATTORNEY PEGUAM NEGARA/
DISIARKAN GENERAL’S
OLEH/ CHAMBERS
PUBLISHED
JABATAN BY
ATTORNEY PEGUAM NEGARA/
GENERAL’S
CHAMBERS

• BIM,
• BIM, MyCREST
MyCREST & QLASSIC
& QLASSIC RoadRoad Tour 2018
Tour 2018

• The
• The MAMPAN
MAMPAN Expert
Expert Forum
Forum
EDITORIAL

It’s TIME TO ZERO IN on


Waste Management
As one of the fastest
growing industries in Malaysia,
construction is essential to the
continued progress of our country
in the next few years. Malaysia is
building itself into a well respected
regional powerhouse, but we must
continue on our current path in Surveys show that initiatives such as MyCREST
order to achieve our goals. have relatively high awareness among professionals

Experts have told us that we can no self-centred incentives to move low because of confusion about the
longer improve our standing in the towards better waste management. policies, the mandatory nature of
world or internal standard of living In actual practice, the higher those policies, and the advantages
through capital expenditures alone. efficiency methods that produce that compliance offers.
We must find a way to increase less waste and provide for better
productivity in our building projects. recycling methods give a project We hope that you will utilise the
the ability to increase revenues and information in this magazine to
Investing in our workforce, lower costs. inform yourself of the many initiatives
technological infrastructure and that are currently on the books and
project processes is the three- In short, traditional methods of waste the advantages of compliance with
pronged approach that many management such as incineration those measures. There are a number
experts have stated will improve and landfill use do us no good of organisations that you may not be
our construction productivity. Within publicly, nor do they benefit the aware of that can help in your efforts
these investments is a natural projects that spawn their use. They to improve policies and procedures
inclination to reduce waste. By negate the benefits we gain from on your construction site. You may
definition, waste represents a lack building, and they are not even the also be quite happy to know of the
of efficacy in our building efforts. most efficient way to do business. many advantages, both internal
Waste is obviously difficult to look There is no upside, and we owe it to and external, that you may receive
at or think about, but we must see our shared destiny to do better. from compliance with green waste
it as an opportunity. The lesson it management initiatives.
teaches us is that we must shore up There is a great deal of
our preplanning and on-site methods opportunity for improvement in Make good use of the resources here.
and produce on a higher level. the construction industry. Surveys This is a time of great opportunity!
show that initiatives such as the
Current waste management efforts
rely on methods that are not green
Malaysian Carbon Reduction and
Environmental Sustainability Tool The
and end up doing much more harm (MyCREST), which impose green
than good. As a country, we cannot standards and standards for waste Editorial
have our private businesses building management, have relatively high
us up only to be brought down again
from pollution. There are also many
awareness among professionals.
However, implementation remains Team
02 Malaysia’s Sustainable
Construction Periodical
MyCREST

Incentives
to Reduce
Construction Waste
with MyCREST

The Malaysian Carbon Reduction


and Environmental Sustainability Tool
(MyCREST) is helping to quantify positive
efforts to incorporate green standards into
the construction industry. Alongside its
quantification of environmental standards,
MyCREST also provides incentives for
construction projects to reduce on-site
waste and carbon emissions.

With MyCREST certification comes many


advantages, both internal and external.

Malaysia’s Sustainable
Construction Periodical 03
MyCREST

Creating an efficient process to the separation and


reuse of on-site materials will save money and time

On-Site Incentives between the many moving parts of reuse of on-site materials keeps the
a construction project to eliminate flow of process and cost efficiency
Increased Efficiency wasteful labour costs. There are many within a project that would otherwise
other initiatives under this umbrella have to step away from its core
Green construction sites with an eye that may create opportunities for function to handle ancillary issues.
to reduced waste have been proven lower costs or a higher profit. No matter the scale of the project,
to work more efficiently. this level of focus will save money
Water & Waste Management and time.
Lean Management
Proper water and waste management
Lean management refers to efficiency
in process. In general, monitoring and
is a direct offshoot of initiatives from Green Technology
the low carbon community. Just as
optimising for an imposed efficiency schedules and processes can be
Tax Incentives
standard tends to lead to better optimised through the concept of
outcomes. When these standards Internal Improvements
lean management, physical resources
include precise objectives such as Leading to External Rewards
may also be managed for increased
reducing on-site waste, avoiding efficiency and a reduced carbon In 2017, the Construction Industry
pollution in water runoff or lowering emissions rate. Development Board (CIDB) was
the total time spent on-site, they recognised as an official partner of
create internal incentives of higher Taking the time to organise a project MyHIJAU, Malaysia’s official green
project revenues and lower project landscape to (1) separate on-site recognition programme. As an
costs, among other things. pollution from water sources and official MyHIJAU partner, CIDB is
(2) separate water runoff from local now certified to assess green
Lean management under MyCREST sewer architecture, is just one of the construction initiatives to verify that
may include incentives such as using ways in which the water and waste they are truly environmentally-friendly
haulers on-site instead of trash bins. management concept can be used and qualify for MyHIJAU certification.
Haulers allow waste to be separated to the benefit of a project. Project Among these initiatives are the
and more easily transported and managers will not have to deal Malaysian government’s
recycled off site. Lean management with censure or fines from creating green technology tax incentives.
efforts may also include just in time pollution, nor will the project require
delivery of products. JIT helps to any additional, efficiency reducing Internal improvements are rewarded
ensure less loss from theft as well as efforts to be taken in the middle of the by the Malaysian government with
a reduction in the erosion of unused project. In the same way, creating an green technology tax incentives,
materials. Lean manufacturing may efficient process to the separation and which will be allocated for projects
also include planning out a schedule which began from 2013 to 2020.

04 Malaysia’s Sustainable
Construction Periodical
MyCREST

Since 2009, the Green Building The scope of a construction project that are included. Design and
Index has prompted the Malaysian that is eligible for various tax feasibility study services as well
government to invoke various incentives is expanding as time goes as other advisory and consultancy
strategies to spur green construction on. Currently, Malaysia has projects services relating to green construction
activities. Among these activities that are based on solar, biomass, are also included, especially those
is the rebranding of the Malaysia many Hydro, geothermal and biogas that are in green township and low
Energy Centre and the launch of the sources that have been approved carbon cities planning.
National Green Technology Policy for both ITA and ITE incentives.
(NGTP). If a project is certified as Qualifying expenditures are also It is important to note that
green by the NGTP, it can receive a expanding. Here is a short list of what construction companies within
100% tax exemption on any capital construction projects can expect to Malaysia can look to personal
expenditure that it needs to obtain receive benefits on. incentives to direct their efforts
that certification. towards green construction projects,
Energy efficiency – This category not just a “larger social benefit.”
Investment Tax Allowances and includes high efficiency motors, The benefit to companies is here,
Income Tax Exemptions on a green motion sensors, variable speed drives now and quite quantifiable. Projects
project are also qualified for 100% and insulation walls. can expect lower costs, higher
of a qualifying capital expenditure Water efficiency – This category efficacy and higher quality from
and statutory income until 2020, includes a water recycling system or looking to concepts such as lean
respectively. These tax incentives a rainwater harvesting system, among management and on-site best
are monitored by the Ministry of other initiatives. practices. There are added incentives
Investment Development Authority from the outside in green technology
(MIDA) and were introduced in the Indoor environmental quality – tax incentives and the goodwill of
official Malaysian budget of 2014. Air filters that help to clean the air public and private entities within
and improve IAQ are all included the country.
As they announced these new in the auspices of the updated tax
incentives, MIDA took great pains agreements. As the green construction industry
to showcase that it would not be Integrated waste management proliferates into the mainstream,
expensive for companies to seek out – Any initiative that has to do with internal and external incentives will
or receive certification for these tax waste treatment, waste recovery or likely increase. Project managers
incentives to take hold. As a matter of waste management is included in the and executives are encouraged to
fact, it is actually quite advantageous updated tax agreements. continue to look for ways to reduce
for a company to go green, and for Supporting services – construction waste as well, to
many other reasons outside of those Electric vehicle services, certification continue to prove the validity of
mentioned directly above. Methods and verification bodies and green the overall initiative.
required to go green are simply overall township are supporting services
good practices on-site anyway.

Malaysia’s Sustainable
Construction Periodical 05
BEST PRACTICES

Designing with
Minimal Waste
in Mind
The Malaysian Carbon
Reduction and Environmental
Sustainability Tool (MyCREST)
is the governmental standard that
helps to place Malaysia on the
leading edge of green construction
in the region. The initiative guides
the efforts of the private sector in
construction, inspiring the use of
new technologies and processes
to build out human developments
while minimising the negative
effects to the natural space.

06 Malaysia’s Sustainable
Construction Periodical
BEST PRACTICES

Designers now have the vital and Sustainable Facility components, which will improve
responsibility to consider Management (FM). their incorporation into modern
the environmental impact of construction projects as well.
construction, including waste The best practices discussed below
generation and disposal, while coincide with at least one of the IBS components have a reputation
continuing to drive forward above categories, although they for being not only environmentally
innovation. MyCREST has been may be assessed across categories friendly, but also cost effective and
enacted long enough for the industry depending upon the nuances of less labour intensive than traditional
to develop best practices toward the project. Because MyCREST precast elements. As initiatives and
these efforts. objectives are created to coincide standards such as the Construction
with the goals of the Low Carbon Industry Transformation Programme
The MyCREST City Framework (LCCF), best
practices may also overlap into
(CITP) become more relevant in
the construction industry, project
Scorecard solutions that are recognised by this managers and executives who take
tool as well. the time to think ahead will most
In order to place a true value on certainly run into less headwind as
environmental best practices, it is
important to understand the metrics
Sustainable sustainability efforts in the country
move forward.
that quantify success. MyCREST Construction
functions on a three stage scorecard
that includes the Design Stage,
Best Practices Forward Thinking
Site Management
Construction Stage and the
Using Industrialised Building Proper preparation on-site tends
Operation and Maintenance
System Components to prevent more serious problems
(O&M) Stage - to coincide with
Forward thinking designers can get down the line. Some of the best site
the standard phases of a modern
ahead of the sustainability management comes from relatively
construction project.
simple changes. For instance, site

As the Malaysian construction industry acclimates itself to MyCREST,


there will be many more opportunities to implement best practices

curve by using on-site components managers can reduce production


The Assessment Criteria that
manufactured through the by limiting or banning smoking
MyCREST considers includes
Industrialised Building System (IBS). on-site, and investing in recycling
Pre Design (PD), Infrastructure
Although IBS technology is widely containers reduces on-site organic
& Sequestration (IS), Energy
available on the market, it has yet waste output. Simply placing mats
Performance Impact (EP), Occupant
to hit the mainstream. Experts in the doorways of buildings to keep
& Health (OH), Lowering Embodied
say that IBS will become more lead and poisonous chemicals from
Carbon (EC), Water Efficiency
prevalent in the industry as labour moving inside is a great way to limit
Factors (WE), Social & Cultural
costs rise throughout the industry. the proliferation of pollution around
Sustainability (SC), the Demolition
Vendor development programmes the site as well.
& Disposal Factor (DP), Sustainable
& Carbon Initiative (IN), Waste are currently in place that will allow
for wider manufacturing of IBS Keeping a site clean using the
Management & Reduction (WM),
methods above helps to reduce
Malaysia’s Sustainable
Construction Periodical 07
BEST PRACTICES

stormwater pollution by keeping process that reduces everything directly from local recycling plants.
construction waste out of the water from the carbon footprint to the daily Renewable products such as wood
supply. Runoff can also be reduced waste output. Lean scheduling also and bamboo can be recycled into
or contained through the use of silt works with the supply chain as well. different projects. This practice will
fencing around the work area. There Invoking a just-in-time standard for improve as the industry begins to
are also many professional best delivery of materials keeps them from move towards sustainability as a
practices that can help to clean the sitting outside for a long time without whole, and each project will actually
water supply and redirect its flow being installed. This reduces runoff help projects that come after it.
away from any of the local sewers. and also eliminates the time that is
usually wasted by moving things. There is also a great deal of
Energy Reduction Through JIT also helps to reduce theft of advantage in putting dual flush toilets
Lean Manufacturing materials on the job. and low-flow faucets on-site and into
Lean thinking in general is a best the project architecture from
practice to invoke around every Reducing On-site Waste the beginning.
aspect of a construction project, Using haulers helps to reduce
but lean manufacturing techniques waste in a far more sophisticated As the construction industry within
can be especially helpful. However, way than trash bins. The modern Malaysia acclimates itself to the new
lean manufacturing is especially generation of haulers now contain standards of MyCREST and ancillary
important, as this initiative helps to pickers that can be used to separate initiatives, there will be many more
reduce the physical waste on-site different materials, creating more opportunities to invoke the best
as well as wasteful processes that opportunities to recycle. Some practices mentioned here. There
needlessly extend the time and construction foremen have stated are also many other common sense
budget of construction projects. they can avoid landfills 75% to methods of designing with minimal
95% of the time by invoking this waste in mind that can be utilised
For instance, on-site tool sheds separation process. on projects in the current landscape.
that are designed by professional Construction companies within the
tradespeople to organise work site If a project is predicted to have a country are always encouraged to
tools can be a great way to reduce small footprint upfront, using haulers find and promote new methods of
wasted production time. Workers may still be a great way to create a sustainability and report them to
will no longer have to guess where more sustainable project. The hauler the wider industry for use on
the right screwdriver or drillbit is, can still transport waste; however, other projects.
fewer tools get lost in the mix, and it does not have to separate them
overall efficiency increases along into different containers if space is Site leaders are also encouraged to
with reduced clutter in terms of scarce. Many materials, such as inform all workers of sustainability
foot traffic. concrete, may be able to be standards that are taking hold within
recycled on-site. the industry. The more seriously that
Lean scheduling works the front-line workers take sustainability,
same way as lean organisation. Selecting Renewable the more common it will become.
Coordinating time frames with Materials
subcontractor foremen ahead of a As the demand for green materials
project groundbreaking can help to increases, there will be more
create a faster, more efficient overall opportunity to select these materials

There are many common-sense methods of


designing with minimal waste in mind, which can
be utilised on projects
08 Malaysia’s Sustainable
Construction Periodical
BEST PRACTICES

Peraturan-Peraturan 2016:
Cleaning Up Our Act
in Construction
The construction industry is a major force in any
developing nation, and Malaysia is no different. In our
drive to modernise ourselves, we have built increasingly
advanced structures and facilities for both the
business and private sectors in a large number of
areas, improving both our economy and our
living standards.

Building Up and technology we will need to meet Growth Brings Solid


the future and make the benefits of
the Nation’s Growth these advancements available to the Challenges of Its Own
whole nation.
Since the 1990s kicked off with the However, the sheer size of the
launch of Vision 2020, construction The importance of these efforts can construction industry and its
has been a major player in Malaysia’s be seen in more than the construction continuous growth comes with a cost:
development. Thanks to the direction industry’s projects. The construction the Construction & Demolition (C&D)
of government initiatives and the industry is also one of Malaysia’s waste produced by construction.
vision of property developers, we most significant contributors to our Our ever-expanding growth and
have continued to modernise our economic growth. 2017 marked development places a proportional
nation for both business and day to an all-time high in the construction burden on the construction industry,
day life. From outfitting buildings for industry’s Gross Domestic Product leading to more projects. And while
the latest industries and technologies (GDP), peaking at RM13,838 million. these projects benefit the economy,
to updating our city planning This represented annual growth of they also produce more waste in
into modern, harmonious green 5.8% over the previous year, and proportion to the number and scale of
townships with a comprehensive 4.3% of Malaysia’s total GDP. All the projects. Construction projects in
list of facilities and amenities, the of this indicates the construction Malaysia result in a lot of waste from
construction industry is vital to industry’s significant role in the natural debris as well as manmade
Malaysia’s continuous efforts to aggregate economy of the country, as construction materials. Additionally,
update and improve itself for the the infrastructure and opportunities illegal dumping and mismanagement
21st century. It plays its part by it provides ultimately benefits other of materials have only made the
ensuring that Malaysia is equipped sectors as well. Revenue generation, problem worse, to the extent that in
with the infrastructure it needs to capital formation and employment 2015 Malaysia produced nearly 300
remain competitive and relevant in creation (both during and after tons of construction waste daily, and
the modern world, preparing the way construction) all support our GDP and the amount is expected to increase in
forward with the modern facilities socio-economic development. the future.

Malaysia’s Sustainable
Construction Periodical 09
BEST PRACTICES

As Malaysia continues the journey 2016/Solid Waste and Public to figure it out themselves or dump
towards becoming a developed Cleansing Management (Scheme waste illegally in the wrong places.
nation, we have also worked to refine for Construction Solid Waste)
our waste management practices. Regulations 2016 come in. Additionally, the act also has an
We have gone from indiscriminate This initiative was instituted by the exhaustive list of the different
waste dumping to landfills, and government for the benefit of the materials that fall under one of
we are now headed toward more construction industry and the nation. their three solid waste categories:
sophisticated waste management It aims to further improve Malaysia’s recyclable materials, leftover
regimens. The increasing importance construction methods and habits to materials, and debris from site
and scale of the construction industry become far more efficient, sustainable cleaning. Clear examples are neatly
and its projects makes these waste and environmentally-friendly, saving organised and introduced for the
management alternatives equally costs as well as our beautiful natural reference of builders, such as the
important as we pursue progress in resources by reducing waste and natural and artificial materials which
a responsible, sustainable manner. poor management. This is achieved are recyclable, such as aggregate,
Better methods are not only by the initiative’s comprehensive list of plastics, concrete, asphalt, and even
desirable, but essential at the rate we regulations and steps to be followed electronics. This will give construction
are developing if we wish to advance during construction. Waste is sorted agencies a clearer grasp of the types
into the future while preserving of materials they are working with
our natural resources and beauty. and gathered according to type, then as well as how to manage them,
However, these measures have not safely disposed of at official sites by instead of carelessly lumping them
yet taken root, and Malaysia has yet licensed collectors. all into a single pile for disposal. This
to uniformly adopt better practices will reduce the amount of materials
for waste management for various The initiative’s schedules provide actually disposed, divide them into
reasons such as unfamiliarity or doubt a comprehensive outline of the more manageable amounts, and
of modern methods. participating states, site locations, recycle materials for more
and authorities responsible for sustainable construction.
Regulating Construction deciding what sort of solid waste
the locations will be allocated The initiative also requires all those
Solid Waste toward. This gives everyone a clear involved in transporting the waste
organisational flow that is easy to and running the sites to be officially
That is where the Peraturan- follow so that they know whom to licensed, adding another layer of
Peraturan Pengurusan Sisa Pepejal contact and where certain types of accountability and legality. These
dan Pembersihan Awam (Skim waste should go, instead of having entities will all be responsible for
Bagi Sisa Pepejal Pembinaan)

P.U.
(A)
AKTA PENGURUSAN SISA PEPEJAL DAN PEMBERSIHAN AWAM 2007 (A)

PERATURAN-PERATURAN PENGURUSAN SISA PEPEJAL DAN PEMBERSIHAN AWAM

SEKUTUAN
AJAAN PER
(SKIM BAGI SISA PEPEJAL PEMBINAAN) 2015
KEWAJ
_________________________
WARTA KER
IPAN PE BAHA
MEGAN GIAN
G LE III P.U.
SEN BA
SUSUNAN PERATURAN
ENT
GI PERK

GOVERNM
_______________________ SISA PE HIDM
PEJAL ATAN

FEDERAL
11.Kewaj PEMBI PEMUN
ipan pe NAAN GUTAN

GAZETTE
megan
BAHAGIAN I pembi g lese
naan n bagi
12. Tu perkhi
PERMULAAN mpaha dmatan
13. Pe n sisa pemun
pepeja gutan
nghant l pembi sisa pe
14. Ke aran ke naan, pejal
Peraturan stesen pe ba han la
nderaa minda rut resa
P.U. (A) 15. Pe n Pu ngutan han, ke p dsb.
JAL DAN
1. Nama dan permulaan kuat kuasa nyimpa Sisa mudah
an peng
SISA PEPE
nan Re olahan
kod
NGURUSAN SISA PEPEJAL
2. Pemakaian dan pe
lupusa
RA N PE n
N-PERATU GI 3. Tafsiran
(SKIM BA
PERATURA RSIHAN AWAM
AN) 2015
4. Jenis sisa pepejal pembinaan KEWAJ BAHA
PEMBE PEMBINA
IPAN PE
MEGAN GIAN
IV
T
AGEMEN
G LESE
ING MAN
16. N BAGI
S Kewaj
GULATION
STESEN
IC CLEANS
BAHAGIAN II ipan pe PEMIN
AND PUBL SOLID WASTE) RE
megan DAHA
g lesen N
W AS TE KEWAJIPAN PENGHASIL SISA PEPEJAL PEMBINAAN ATAU PEMUNYA SISA PEPEJAL bagi st
SOLID NS TR UC TION esen pe
minda
FOR CO
PEMBINAAN
2015
han
(SCHEME
KEWAJ
IPAN PE
MEGAN BAHA
G LE GIAN
5. SEN BA V
Sisa pepejal pembinaan yang boleh dikitar semula GI PERK
PENGAN HIDM
6. Sisa baki pembinaan ATAN
17. GKUTAN PENGAN
Kewaj JAUH GKUTAN
7. Debris pembersihan tapak ipan OL EH
pemeg
pengan ang
8. Cara menguruskan atau mengendalikan jenis sisa pepejal pembinaan di gkutan lesen
jauh bagi
perkhi
premis dmat an pe
ngangk
9. Pelantikan pemegang lesen bagi perkhidmatan pemungutan sisa pepejal ut an ol
KEWAJ eh
pembinaan IPAN PE BAHA
MEGAN GIAN
G LE VI
10. Penyimpanan rekod SEN BA
GI KEM
UDAH
PELUPU AN PE
18. SAN NGOL
OLEH/ Kewaj AH AN DA
DISIARKAN BY
ipan pe N
megan
PUBLISHED NEGARA/ g lesen
PEGUAM bagi ke
JABATAN CHAMBERS mudah
GENERAL’S an peng
ATTORNEY olahan
dan pe
2 lupusa
n

Peraturan-Peraturan Pengurusan Sisa Pepejal


dan Pembersihan Awam (Skim Bagi Sisa
Pepejal Pembinaan) 2016
10 Malaysia’s Sustainable
Construction Periodical
BEST PRACTICES

carrying out their respective roles


according to the procedures and
conditions found in the initiative.
These procedures cover all parties
involved and all stages of waste
collection, starting with keeping the
sites safe and the transportation
secure, and even including keeping
records and licensed receipts
detailing the type and amount of
waste, date of collection, and site of
disposal. These add an extra layer of
security to keep track of how much
waste is produced and where it
goes. And in the event that any of the
parties involved fail to comply, they
can be fined up to RM10,000.

Evolving Our Ways


for the Future
The Peraturan-Peraturan Pengurusan
Sisa Pepejal dan Pembersihan
Awam (Skim Bagi Sisa Pepejal
Pembinaan) 2016/Solid Waste and
Public Cleansing Management
(Scheme for Construction Solid
Waste) Regulations 2016 provide
the construction industry with a new
paradigm for waste management
and disposal, and is equipped with
the ability to enforce it. This leaves no
room for uncertainty for construction
agencies wondering if these practices
are compulsory.

Our nation is constantly striving to


meet the demands and challenges
of its journey towards developed
country status. This initiative is a step
in the right direction towards making
the construction process safer, more
efficient, and more sustainable for
our environment. By adopting it, we
will be able to modernise not just
our infrastructure, but our methods
and culture.

This initiative is a step in the right direction towards


making the construction process safer, more
efficient, and more sustainable for
our environment

Malaysia’s Sustainable
Construction Periodical 11
BEST PRACTICES

Sustainable Construction
Best Practices:
BETTER WAYS
TO DISPOSE
OF WASTE
Proper waste disposal is one of
the core tenets of green construction,
and it is also essentially important if a
project is to remain in compliance with
the Sustainable Construction Excellence
Centre (MAMPAN) and the Construction
Industry Development Board (CIDB)
of Malaysia. With the aid and the
support of these organisations, new
technologies are being introduced into
the marketplace at perhaps the fastest
rate in history. Let’s take a look at some
of the most promising and innovative
best practices.

3R Construction projects. From 70% to 80% of has proven to be the concept of


materials in landfill dumps within reduction. If there is less overall
Waste Reduction the country are recyclable materials. waste on-site, the monies that would
Roadside dumping still remains a be used to reuse and recycle can
3R stands for “reduce, reuse, problem for Malaysian authorities be saved. Additionally, the concept
recycle.” In Malaysia, the National as well. of having materials that need to be
Solid Waste Management Policy reused or recycled implies a surplus
puts the meat to the bones of this of materials on-site, which means
general strategy. Reduction of Waste there is some sort of inefficiency that
Through Careful may be addressed within the project.
As of 2017, landfill dumping
constitutes a common but inefficient Pre-Planning
The first pre-planning priority for
method of waste disposal in the more sustainable construction is
majority of Malaysian construction Of the 3Rs, the most effective
concept for sustainable projects to use a more efficient just in time

12 Malaysia’s Sustainable
Construction Periodical
BEST PRACTICES

(JIT) approach to the supply chain. through university education. Even modular building components and
Delivering materials JIT helps to less of the contractors surveyed said structural systems. The use of
ensure the right amount of materials that they had been introduced to the materials that are proven to have a
on-site without overdelivery. JIT 3R concept from university work than higher durability is another charge, as
also helps to reduce the amount of from some sort of legal imposition or well as the minimisation of different
materials that erode or lose efficacy requirement. types of materials that do not have
from sitting unused on-site, only to be this characteristic. For instance,
discarded as unfit or lower quality. Designing for mechanical fasteners such as
nails, screws and bolts rather than
Disassembly, Reuse
The Imposition of adhesives or sealants are conducive
and Adaptability to this initiative. Finally, a set plan
3R Through Law to allow for the safe movement of
Yet another component of pre- workers will aid in disassembly,
Among contractors in a study planning that can reduce waste is to building adaptation and repair efforts.
conducted by the National Solid design buildings that support reuse,
Waste Management Department,
the Penang Local Authority, the
adaptation and disassembly. These Preparation
buildings provide both short and
Headquarters of Solid Waste and long term benefits for their residents for Deconstruction
Public Cleansing Management and the surrounding communities.
Corporation and the CIDB in Another advantage of this practice is Projects that include certain types of
Penang and its Headquarters, the avoidance of building removal in materials rather than others are more
only a small portion of contractors total. Materials within this structure deconstructable than others. Taking a
are introduced to the concept of can be more easily and cost efficiently cue from the Department of Housing
3R through regulation, contract directed and disassembled for other and Urban Development in the United
requirement or law. One of the best uses in the future. States, best practices here would
practice methodologies the Malaysian include the following.
government has is to impose Under the auspices of this charge,
limitations on landfill dumping and architects and foremen are Wood framed buildings - Certain
incineration. 67% of the contractors encouraged to develop a plan types of wood such as American
had knowledge of 3R in the survey, of adaptation that includes key chestnut, old growth southern yellow
but only 39.2% of these contractors information such as built drawings, pine and Douglas fir allow for a piece
practiced 3R in their management of structural properties, repair access, by piece construction that aids in the
construction waste. key components and contact deconstruction process, reducing
information. Contractors can gain waste and allowing the unused
A secondary method for the success here through the use of lumber to be reused in
introduction of 3R concepts is simple open span assemblies, many applications.

Another component of preplanning that can


reduce waste is to design buildings that support
reuse, adaptation and disassembly Malaysia’s Sustainable
Construction Periodical 13
BEST PRACTICES

The use of specialty materials materials of other countries that have the Malaysian government. In the
that resale well – Multi-pane successfully implemented 3R or survey mentioned above, 37.1% of
windows, architectural mouldings, ancillary policies. contractors thought that 3R was not
unique electrical material fixtures, mandatory while 29.4% of contractors
unique doors and hardwood flooring Incentivising were not sure. Those who thought
are just a few of the examples of that 3R was mandatory (33.6%) also
materials that bring a high value on Contractors mentioned the sustainable building
the resale market, meaning that these rating metric of the Green Building
materials would not go to the landfill The monetary value of waste has Index as well as the Malaysian
even if they were extra on-site. been shown to be a good incentive Carbon Reduction and Environmental
to entice contractors to participate Sustainability Tool (MyCREST).
Use low quality mortar with in 3R initiatives. Pre-planning is These statistics prove that there
high quality brick - This type of essential here, as records show that is a great opportunity to invoke
construction is more easily broken up contractors are less likely to believe in waste management best practices,
and cleaned, and the brick can be or implement 3R standards if they are as 86.7% of contractors noted
reused in other projects. unaware of the monetary advantages environmental pollution as the top
or if the changes in production are negative impact of ineffective building.
Structurally sound buildings - This shown to have unsustainable cost or
can be partially accomplished through time frames. However, the attitude MAMPAN continues to move towards
a JIT supply chain as well as checking of contractors also plays a role in its midterm initiatives to increase the
revamped structures for old, worn out implementation, and this can be compliance with and participation
materials before building over it. changed through education and the in sustainable construction efforts
imposition of proven policies into a until 2020. Best practices in waste
Stopping the use of dangerous legal standard from governmental disposal will naturally continue to be
materials - Lead, asbestos and organisations. an important part of this process.
polychlorinated biphenyls are a few The technologies mentioned above
examples of materials that should not There is a great deal of confusion as serve many companies well now, and
be used in any sort of construction to whether certain 3R standards are promise to improve upon themselves
project in the modern era. It may mandatory in construction projects in the very near future.
behove the Malaysian government that are under the jurisdiction of
to take a look at the restricted

Best practices in solid waste management


will naturally continue to be an important
part of the Malaysian construction industry

14 Malaysia’s Sustainable
Construction Periodical
PERSONALITY

Innovations in
Construction
Site Waste
Management
Bina MAMPAN speaks to Dr Mohd Pauze bin Taha
to gain some insight into the innovations
and best practices in sustainable construction
waste management

There’s no doubt that materials and its creation of waste.


In 2015, Solid Waste and Public
irresponsible construction waste.
Only by committing to growth that is
the construction industry Cleansing Management Corporation resource-efficient, clean, and resilient
plays a major role in of Malaysia (SWCorp) confirmed that can the nation progress without
approximately 8 million tonnes of causing harm to the environment.
Malaysia’s economic growth. construction waste were generated
In 2016 alone, the value from construction projects each year. By using resources wisely, the
of construction projects (Taha, 2015) construction industry can reduce
its consumption of raw materials,
awarded increased to However, the outlook is not as bleak conserve scarce landfill space, reduce
RM229 billion while 2015 as it seems. Green growth is a core GHG emissions and ultimately, lighten
recorded a value of RM141.8 premise of the 11th Malaysia Plan. the burden on the environment.
No longer will we be adopting the
billion. The industry is “Grow first, clean up later” model On climate change, Malaysia is
expected to contribute 5.5% that has been in practice over the committed to reducing the GHG
to the nation’s GDP in 2020. past six decades. emission intensity as ratio of its GDP
by 45% by the year of 2030.
While the industry’s contributions to Environmental sustainability, the
the nation’s economy are positive, second strategic thrust of the Stripped down to its foundations,
its generation of waste is less Construction Industry Transformation sustainable management of
commendable. As the industry has Programme, merely reflects the goal construction and demolition waste is
expanded, so has its consumption of of green growth. One of its initiatives about the right attitude.
commits the industry to reducing

Malaysia’s Sustainable
Construction Periodical 15
PERSONALITY

What Are the Common


Factors Behind Construction
Waste Generation?

• Inadequate planning
and scheduling
• Errors in design and
design changes
• Over-ordering and under-ordering
of materials
• Poor handling of materials damage
during handling or transportation
• Poor storage of materials
• Lack of management techniques
to minimise waste
• Mistakes in construction Designing for deconstruction is a model
in vogue in many developed countries
Design Waste Out

In local and international studies, With the prevalence of Building Through BIM, architects can visualise
errors and changes in design and Information Modelling (BIM) and the demolition or deconstruction
flawed plans have been cited as Industrialised Building System (IBS), process. BIM-compliant design for
some of the major reasons waste is it is possible to design waste out deconstruction tools help planners in
generated in construction projects. of construction. predicting and determining the type
One 2008 UK study by Osmani et al and volume of recoverable materials.
revealed that many architects take BIM enables architects, contractors,
the view that waste is commonly and other workers to input data Designing for deconstruction is a
generated during site operations. on a building and generate three- model in vogue in many developed
Hence, waste management is simply dimensional digital models of a countries. Common principles in this
not a priority in the design stage. building in different stages of its model include:
life-cycle. Hand-drawn illustrations • Designing for prefabrication
In a perfect world, there would be and sketches can be disastrously and assembly
no design errors and changes to inaccurate, forcing workers to knock
out parts that have been partially built • Standardising connection details
the design late in the construction
process. The amount of waste and redo them. Embracing BIM would • Design with reusable materials
generated would be zero. Some limit errors and changes in the design • Design for flexibility
professionals might conclude that stage. It would also push architects and adaptability
the creation of waste is inevitable to consider alternative designs,
owing to the nature of construction. strategies, and materials which will For example, a design for assembly
It isn’t inevitable. Waste can be prevent and minimise wastage in line and disassembly would call for
prevented and minimised from the with the project’s construction site screws instead of nails to be used. By
very beginning. waste management plan.

16 Malaysia’s Sustainable
Construction Periodical
PERSONALITY

Inadequate packaging leads to Timber, for example, is conventionally


material damage and wastage. reused up to 4 times.
Overpackaging the materials will
certainly ensure that the materials are Design for deconstruction also
sufficiently protected, but the extra opens up pools of reusable materials.
packaging is wasted. As they are recovered carefully
during the deconstruction process,
Reducing material wastage during materials such as screws, steel
construction is as simple as making beams, lights, and glass panes
certain tweaks to the delivery among others can be assessed
schedule, materials ordered, and for reuse in the construction or
site management techniques. renovation of other buildings.
The following ways are just some
of those tweaks Malaysian Efficient segregation of waste also
contractors could make: prevents materials from being
• Just-in-Time Delivery method contaminated. Conversely, if piles of
Reducing material wastage timber and concrete were dumped
where materials are delivered
during construction is in the same waste skip, it would be
as and when they are needed
as simple as making to prevent excessive storage difficult to reuse the timber.
certain tweaks and handling
Nevertheless, there is hope for mixed
consolidating plumbing services in the • Order cut-to-length materials waste. In Germany, a technology of
design, the lengths of pipes needed instead of stock sizes(examples: drying distillation and burning is used
would also be reduced. timber, steel bars, metal studs to separate every kind of material
ordered to length) that can be reprocessed cleanly from
Under IBS, building parts are • Ensure proper on-site storage waste and reused.
manufactured in a controlled of materials
environment and then delivered to • Ensure materials are not overly Using Recycled Waste
the site for assembly. Prefabrication or inadequately packaged
and onsite assembly would • Practice the take-back system Waste can be repurposed and
certainly minimise wastage caused where manufacturers, dealers, transformed into new products. For
due to mistakes by unskilled and and importers are obliged to example, waste wood is shredded
inexperienced workers. reclaim specified products and separated from foreign elements
for the purpose of recycling such as metal. The resulting wood
Reducing Waste or disposal chips are then sent to construction
On and Offsite

Inefficient scheduling, material


procurement, and site management
are some of the major causes of
waste generation.

Firstly, materials and supplies are


ordered in bulk to obtain a discount
from the suppliers resulting in
excessive storage of materials.
When the materials are stored
improperly onsite, they could be
damaged due to the weather
or multiple handling during
transportation, delivery, and storage. and demolition waste recycling
Reuse and Reuse Materials
facilities to be recycled. They can also
Secondly, waste also results from be used to generate energy.
Many construction materials can be
cutting stock size materials as the used multiple times. By maximising
leftovers are often unfit to be Some types of waste can also
their usage, contractors could ease
used anywhere. be used as alternatives to virgin
the consumption of virgin resources.
materials in the process of creating

Malaysia’s Sustainable
Construction Periodical 17
PERSONALITY

new construction materials. Fly ash, will be equipped with construction- construction companies appoint
crushed concrete, marble waste, and specific recycling equipment by the registered waste collectors who
quarry dust for example can be used fourth quarter of 2020. And that will collect the waste in Roll-On-Roll-Off
as aggregates in concrete. hopefully speed things up! containers who in turn dispose of the
waste at inert landfills.
Though some construction Responsible Disposal
professionals remain sceptical of Sustainable waste management
these alternatives as opposed to Waste management was not a priority doesn’t stop at disposal. There are
natural aggregates, studies have for Malaysian construction companies certainly steps Malaysian contractors
shown that they are comparable in in the past. They did not practice and other parties can take to prepare
quality and can improve the properties waste separation, nor did they waste for disposal responsibly and
of concrete. As an example, fly appoint registered waste collectors. prevent future waste:
ash can heighten the strength and Waste was often dumped at • Quantify and measure waste
durability of concrete. Quarry dust landfills, illegal dumpsites, and according to types and volumes
consists of rough, angular particles private properties. instead of visual estimation.
and leads to increased strength due For example, a scale could
to better interlocking. A 2012 study on the rise of illegal be attached to each Roll-On-Roll-
dumpsites revealed financial issues Off container.
More importantly, recycled concrete as a major factor which contributed
or green concrete as it is otherwise • Record the types and amounts of
to the increase. The great distance
known reduces the concrete waste generated and their causes
between the project site and gazetted
industry’s CO² emission by 30%. landfill was also a leading cause. • Increase the number of transfer
The study also reported that some stations to reduce the costs of
While the 2020 target for recycling contractors intended to evade the transportation and distance
waste is set at 22%, as of 2013, the landfill tipping fees to maximise between the gazetted landfill and
recycling rate of construction waste is their profit. project site
rather low at 10.5%. • Increase the tipping fee at landfills
Though it would be false to say to encourage contractors
Under the CITP, at least three new or that the practice of illegal dumping to recycle
existing C&D waste recycling centres no longer exists in Malaysia, most

18 Malaysia’s Sustainable
Construction Periodical
CAREER

Confessions
of a Landfill
Engineer
The working environment in landfill
engineering is tough, but landfill engineers
rise to the challenge by planning and
Achmat Nadhrain Ibrahim,
designing proper landfills for the sake
Senior General Manager, Cypark
of the environment.

To gain further insight into the “Let’s say that the total lifespan is 20 Industrial catastrophes occur because
profession, Bina MAMPAN sought years. They must break it down every of unstable construction. As with any
Achmat Nadhrain Ibrahim, Senior year for all 20 years. So, they must operation affecting the environment,
General Manager at Cypark, an have at least 20 sheets of drawings to a Detailed Environmental Impact
environmental engineering firm which show and anticipate what will happen Assessment (DEIA) will be carried
explores renewable energy and green every year. On a daily or weekly out. The risk factors will be
technology, and manages landfills for basis, they have to see the plan for highlighted in the DEIA report which
municipal solid waste and inert waste. the month. For example, let’s say this landfill engineers have to take into
month we are expected to receive consideration when planning and
All About the Plan 30,000 tonnes. Then, they must
calculate the volume for each block.
designing the landfill. Common
factors highlighted in DEIA reports
Let’s say each block has the capacity for planned landfills include smell,
Nadhrain revealed that the roles and
to receive 1,000 tonnes, and that we noise, and pollution.
responsibilities of landfill engineers
receive 100 tonnes of waste every
involve a lot of calculation, saying,
“Their job is basically to plan the
day. Each block can operate for 10
days. If things don’t follow the plan, it
Tools of the Trade
landfilling activity. They have to come
might lead to overflow or underflow.
up with a plan of where and which “As far as I know, there is no specific
It’s very important for the engineer to
area of the land that they need to subject called landfill engineering.
calculate and plan for the incoming
landfill. What’s the capacity per area Maybe recently, there is. But even
waste,” explains Nadhrain.
that they need to fill with rubbish? if there was, I don’t think there are
They have to calculate based on people who are taking it up. What
Sourcing the proper machinery for
the current incoming waste for that we require is a person with a basic
the landfilling activities is also a major
particular area. How many days or knowledge of civil engineering,” says
responsibility.
weeks can that one particular Nadhrain. “In the current market,
area last?” there aren’t many people studying
“When I operate a landfill, I need
to become landfill engineers. It’s a
equipment. If I need to fill the area
Next, they must take this and career choice. It’s up to the individual.
at the back of a cell, then I need a
break it down. Setting the landfilling They don’t need to have a degree
bulldozer to push the rubbish
procedure is a significant duty, as all or diploma. As long as you have
to that area.”
operators and workers depend on the necessary knowledge in civil
the plan. engineering practices, we can
The stability of landfills is also a
employ you.”
major issue in landfill management.

Malaysia’s Sustainable
Construction Periodical 19
CAREER

“We must look to cleaner


sources of energy.” – Nadhrain

Certain tools of the trade are must- RM1,500. For a general manager, industry, adding that when he joined
haves in this field, as Nadhrain says, it can be around RM15,000 – Cypark, he started off by managing a
“AutoCAD. Of course, now there are RM20,000 per month. The sky’s landfill project.
some specialised waste and landfill the limit.”
management software.” Over the past 14 years, some of
“One could become a senior landfill the projects under his supervision
Skills and knowledge aside, it seems engineer, a manager, a general include the Solid Waste Modular
that a hardy disposition is necessary manager, a consultant. The career Advanced Recovery Treatment
for someone in this field. path doesn’t stop. It’s his abilities. System (SMART) sanitary landfill and
When he becomes a general Waste-to-Energy plant in Ladang
“Working in a landfill is not easy. We manager, he could be doing other Tanah Merah, the Taman Beringin
need a person who can withstand things, not just landfill engineering.” Safe Landfill Restoration Project,
tough conditions. Someone with a and 16 safe landfill closure projects
strong sense of determination in their
career and someone who enjoys
An Unexpected Journey in Peninsular Malaysia.

the job.” Nadhrain chuckles, “And of When probed to name the landfill
Nadhrain’s own career path is one
course, you must be healthy. You’re project he’s proudest of, Nadhrain
with many forks in the road. He’d
working under the hot sun every day.” counts the Ladang Tanah Merah
never envisioned working in landfill
plant among his greatest successes.
engineering and waste management
The working hours are the standard The state-of-the-art facilities at the
when he graduated from the
8 to 5 on a 6-day shift. The working LTM plant include waste reception,
University of Brighton in 1994
hours may be extended depending segregation, recycling facilities,
with a Bachelor of Science in
on the circumstances. In some cases, an anaerobic bioreactor system,
Mechanical Engineering.
a landfill site may receive the waste a sanitary landfill and a waste-to-
from a client in the last hours of the energy plant.
Fresh out of university, he began
working day.
his career as a mechanical engineer
Though he started off in mechanical
working on steel tanks at SCOMI,
Aside from the smell, weather, and engineering, he adapted and
then known for its design and
harsh working conditions, those learned quickly due to his interest in
fabrication of special purpose
working onsite frequently come into environmental engineering.
vehicles, followed by three years at
contact with dangerous items among
Proton. He then served a few stints
the waste. “Enthusiasm is important. Whatever
in various construction companies
the project is, I believe it will work. It
including a one-year stretch in
A Rewarding Career South Africa.
sounds a bit clichéd, but we have to
make the world a better place. The
world is generating electricity using
Despite the dangers faced, a career It wasn’t till 2004 that he joined
gas and coal, but these resources are
in landfill engineering can be rather Cypark and entered the environmental
depleting. We must look to cleaner
fruitful, says Nadhrain, “For a landfill engineering and waste management
sources of energy,” says Nadhrain.
trainee, starting pay is around

20 Malaysia’s Sustainable
Construction Periodical
R&D

Levels of Waste:
EXPERTS WEIGH-IN
ON INEFFICIENCIES
IN CONSTRUCTION

Construction in Malaysia has some distinctive trends when it comes to waste generation,
as professionals struggle to find the right balance in a competitive industry. And while it’s
understandable to a certain degree, decision-makers may want to rethink how their materials
are used, so they don’t waste money or threaten the future of our planet. As sustainable building
continues to evolve, the Standard Code of Practice for Construction Solid Waste Management
received a helping hand from a study conducted across different sites to determine the level of
waste. In the article “Professionals’ Views on Material Wastage Level and Causes of Construction
Waste Generation in Malaysia” published in Malaysian Construction Research Journal, Volume
21, Foo Chee Hung and Nabila Syazwanie Kamaludin examine how it was conducted, and what
the results say about the construction industry at large.

Malaysia’s Sustainable
Construction Periodical 21
R&D

Doing the Legwork than taking the time to recycle their Results
materials or finding an environmentally
This study was an attempt to get friendly landfill. The study grouped all of the
construction leaders to open up responses together to come up with
about what was happening in their relevant trends in material wastage.
daily lives. Researchers had to get Trouble in Designs The main items that were routinely
in on the ground level to pass out Sometimes, construction companies wasted were relatively inexpensive
general surveys and personally are blamed for what is actually a packaging materials such as glass,
interview decision-makers. Each design flaw hidden underneath the plastic, and cardboard. Timber
project has its own rhythm based seemingly obvious problem. It’s formwork and brick were rated
on the nature of the building (e.g., pivotal for everyone involved in the at increased wastage levels over
residential, commercial, etc.), which building process to be concerned cement, tiles, steel, but only at a
means each company will have their with the level of material wastage. The slightly higher rate. The materials
own way of handling their waste. client and the designer need to work least likely to be wasted were
To gather the necessary information, together to determine how to make steel formwork and glass. Those
researchers had to conduct personal each project as efficient as possible. conducting the study unsurprisingly
interviews to obtain the necessary One of the most important things found that excess remnants from
data and then use those responses a designer can do is to stick to the packaging materials were the number
to come to general conclusions. plan. Changes in the design during one contributor of waste, but they
The waste is defined as how much the project can result in partial or even also found that temperature and
material was purchased as opposed total demolition, both of which can humidity, material mishandling, and a
to how much was used massively contribute to total waste. lack of waste management plans also
on the project. weighed heavily on final numbers.
On-Site Problems
Expectations All employees know just how Solving the Problem
versus Reality temperamental working on a Communication and a lack of
construction site can be, but all planning are two of the more common
From over-ordering supplies to
those unknowns can be very hard reasons for waste in any industry, and
unpredictable damaging events,
on the bottom line. Employees may construction is no exception. Those
it’s difficult to predict how
damage materials during transport or who care about creating a more
much material each building project
store them in precarious positions. sustainable business need to pay
will need. Compounding this problem
Extreme wind, sun, or rain may end attention to what they’re ordering and
is the fact that most construction
up damaging a particularly vulnerable why. They need to be aware of how
crews are rewarded for sticking to
part of the building. Thieves or their employees treat the resources
their schedule rather than protecting
vandals may steal or destroy or hold training sessions to correct
the environment. Therefore, it’s easier
valuable materials, or equipment may any potential confusion. Designers
to order extra materials so there’s no
malfunction and damage existing need to be willing to stick to the plan
chance of delays, which may end
structures. One of the biggest rather than constantly changing their
up generating far more waste than
problems is that leaders may not mind on the fly. Finally, construction
anyone ever anticipated. Construction
take the time to develop a waste managers need to develop a waste
leaders in Malaysia also have a
management strategy, which can end management strategy that will work
tendency to dispose of their waste at
up landing a project (and the planet) to recycle or reuse every material
inappropriate waste sites rather
in hot water. they can.

22 Malaysia’s Sustainable
Construction Periodical
R&D

USING SUPPLY
CHAIN MANAGEMENT
STRATEGIES TO IMPROVE
CONSTRUCTION PRACTICES

The construction industry is critical for any country wanting to develop its wealth, and without it,
other businesses and industries would have no place and no way to conduct business. Without the
necessary infrastructure, a country will not be able to achieve optimal economic growth. Malaysia is
trying to compete in the global market, and the construction business will need to be able to meet
changes in the demands being made on it.

Malaysia’s Sustainable
Construction Periodical 23
R&D

Unfortunately, there are some from the suppliers of the raw and supply chain management skills.
challenges in the Malaysian materials to the distributors of the There are many areas where workers
construction industry which have kept final goods. are resistant to change and use
about 5% of all construction projects methods which are leading to waste
from being completed. In an effort The key to success using Supply and even failure to execute some
to discover what the problems are Chain Management is ensuring projects. Overall, the players in the
and look to solutions for the future, that businesses use collaboration, construction industry understand
studies are being conducted to find risk management and change the concepts of SCM but need
out what the major problems are. management to help all involved to develop more comprehensive
parties align their goals and practices in all the areas of
In the article “Construction Supply communicate effectively (change production.
Chain Management Practices in management involves a plan that
Malaysia” published in Malaysian
Construction Research Journal,
helps to prepare and support all of
the individuals within the business to
Looking to the Future
Volume 12, Faisal Zulhumadi, Che make the necessary changes). Supply
There are several goals that industry
Sobry Abdullah, Azhar Ahmad and chain sustainability is an important
workers can aspire to, which will help
Zulkifli Mohamed Udin examine these component of any plan, and covers
them to achieve more success and
challenges and propose some ways legal and ethical implications like the
work more efficiently. These include:
of overcoming them. effect the business will have on
the environment. 1. Strengthening the image of the
Supply construction industry itself,

Chain Management Findings of the Study 2. Aiming for the highest standards
in the areas of occupational safety
One management strategy which In this case, the study was conducted and health and environmental
is used to improve performance in to find out which practices were issues, and
many industries is Supply Chain causing the most problems for 3. Benefiting from globalisation
Management (SCM). SCM includes construction projects using SCM by trading materials on
all of the activities a business or principles, using surveys and the world market.
organisation needs to plan and carry interviews of people who worked
out a project, from drawing the plans directly in the construction business, Among the top areas of concern
and buying the materials to delivering including contractors, developers are materials and green practices.
the finished product to the customer. and suppliers. Unfortunately, clients do not
SCM is a complex process and there normally require construction
are special strategies and software Because of how rapidly the industry projects to employ green practices,
which make it easier for businesses is growing, there has been a and the expense is a prohibitive
to carry out. significant amount of innovation, but factor. In order to convince the major
unfortunately there is little evidence players in the construction industry to
Companies which employ best that the industry is adopting strong adopt green practices, there will be
practices using SCM find the best SCM practices. There needs to be a steep learning curve in the overall
ways to streamline the production a more strategic and systematic process. Government agencies that
process, from beginning to ending, adoption of new policies and are involved with the construction
resulting in a reduction of waste. practices which will help the industry industry will need to step in and
Those who successfully practice to improve its performance and allow take responsibility for guiding
SCM find the most efficient and individual construction companies the construction industry to
cost-effective ways to do all of the to compete on both the local and better practices.
individual tasks. For SCM to work international levels.
well, all of the partners in the The construction industry has
enterprise must work well together, In the final analysis, construction successfully adopted new practices
industry workers are adopting some and procedures over the last several
SCM practices, mostly in areas like decades. Considering the abilities and
customer and supplier management determination of Malaysian workers
to succeed, these new goals
are achievable.

24 Malaysia’s Sustainable
Construction Periodical
NEWS & EVENTS

MyCREST
Certification
Begins Here
This is your chance to join the MyCREST team! Complete
these courses and become a MyCREST Qualified Professional or
MyCREST Assessor. Gain valuable job skills and advance your career
at the same time!

MyCREST, or the Malaysian Carbon Through MyCREST, the construction


Reduction and Environmental industry will be transformed to
Stability Tool, is the brainchild of the actively factor in quantifiable carbon
Construction Industry Development assessments and sustainability
Board (CIDB) under the government’s ratings at all stages of construction.
Construction Industry Transformation MyCREST provides an objective,
Programme (CITP), Malaysia’s measurable result for a project’s
national agenda to transform design, construction, and operation
our construction industry into a & maintenance. Projects whose
highly productive, environmentally results fail to meet MyCREST’s
sustainable, and globally competitive standards will not receive certification.
industry which is focused on safety
and quality standards. Through a combination of objective
results that can be enforced and
MyCREST pursues that vision with new strategies to reduce waste and
quantifiable results, a collection improve sustainability, MyCREST
of best environmental practices will help to elevate the standard of
that match global standards, a Malaysia’s sustainable construction
comprehensive database of case to an international standard, bringing
studies. It is a tool that guides our construction practices into
every stakeholder involved in the the modern age. The standards
design, construction, operation & set by MyCREST are set to be the
maintenance of building by adopting standard in the ASEAN region, and
sustainable development practices. it is expected to see adoption by
It also aims to quantify the actual countries within the region
carbon emission at every stage of the and beyond.
building lifecycle. The MyCREST tool
aims to guide, assist, quantify and These courses are held with the goal
thereby reduce the built environment’s of exposing construction industry
impact in terms of reduced carbon personnel to MyCREST’s general
emissions, environmental, and assessment structure. It aims to train
socioeconomic impact. and certify qualified professionals and
assessors by imparting to

Malaysia’s Sustainable
Construction Periodical 25
NEWS & EVENTS

them the knowledge required for Armed with this knowledge and fully pursue a career in the transforming
correctly interpreting the prerequisites certified, participants will be given construction industry of Malaysia
and requirements of MyCREST’s valuable career skills and credentials, and beyond.
standards and reference guides, while the nation will gain more trained
as well as how to use the carbon experts to propagate MyCREST’s
calculator and record its results knowledge and practices. With For any inquiries about these
while preparing and submitting MyCREST certification, one is on MyCREST courses, please
objective reports, along with the cutting edge of sustainable contact Mr Hazwan
sharing comprehensive MyCREST construction and equipped to at 03-4040 0040.
implementation practices.

Qualified Professional Assessor


Qualified Professionals are the personnel accredited Assessors are personnel accredited by CIDB
by CIDB whose role is to facilitate the industry in whose role is to access building construction
adopting MyCREST in building construction projects. projects using MyCREST. Only MyCREST
Qualified Professionals are eligible to become
Criteria: MyCREST Assessors.

• Attended MyCREST Awareness & Qualified Criteria:


Professional Training Course
(2.5-day course) • Successful completion of MyCREST Qualified
Professional training course, and
• Performed group assessment and passed
MyCREST Qualified Professional • Attended MyCREST Assessors
Examination, and Training Course (2-day course).

• Completed and Submitted MyCREST


Qualified Professional registration form.

• Requirement:

 Applicant should be at least 21 years old

 Applicant should be Degree or


Diploma holder from a recognised
institution in Architecture, Civil/
Mechanical/Electrical Engineering,
Built Environment study or other
construction related fields OR
Applicant should have minimum
3 years of working experience in
construction industry

No. Title Venue Date

1 Qualified Professional Course Level 11, QP 1 (17–19 April 2018)


(date of written assessment and Sunway Putra Tower QP 2 (8–10 May 2018)
group presentation TBA) QP 3 (7–9 August 2018)
QP 4 (18–20 September 2018)
QP 5 (29–31 October 2018)

2 Qualified Assessor Level 11, Assessor Course 1 (14–15 May 2018)


Course Sunway Putra Tower Assessor Course 2 (8–9 November
2018)

26 Malaysia’s Sustainable
Construction Periodical
NEWS & EVENTS

MAMPAN’s 2018
Exhibition Participation
Take a look at MAMPAN’s exhibition knowledge, experience, and insight. such as the International Greentech &
schedule for 2018! We’ll be Get educated on and exposed to Eco Products Exhibition & Conference
participating in these exhibitions at the latest best practices in the world Malaysia (IGEM) 2018 or the Green
these dates and places. Find us at of construction. In doing so, you Energy Expo Forum 2018.
the upcoming events and come join can stay ahead of the curve and
us there! adopt more advanced methods In addition to being a premium source
and practices thanks to getting an of knowledge, these exhibitions
These exhibitions are conferences exclusive insider’s look. are also a gathering of the who’s
and gatherings on the regional and who in the construction industry.
global level, assembling the best Here, participants learned more Attendees will have a golden
and brightest industry experts of about specific topics such as urban opportunity to network and build their
the ASEAN region and beyond. development at the World Urban reputation in the industry by mingling
The construction industry’s leading Forum (WUF) 2018, or the latest with other thought leaders, giving
experts will be gathered in one place industry developments during the them the opportunity to forge vital
to engage one another in an involved Malaysia Technology Expo (MTE) business connections.
and insightful discussion about the and International Construction Week
construction industry’s current state (ICW) 2018. As befits Malaysia’s These exhibitions represent a golden
and its future. drive to transform its construction opportunity for anyone seeking
industry to be more sustainable, there knowledge or opportunities in the
From these experts, you can are multiple exhibitions relating to construction industry, so check out
gain access to their considerable environmentally-friendly construction, when and where they’ll be held!

No. Title Venue Date

1 World Urban Forum (WUF) 2018 Kuala Lumpur Convention Centre 7–13 February 2018
2 Malaysia Technology Expo (MTE) 2018 Putra World Trade Centre 22–24 February 2018

3. International Construction Week (ICW) Kuala Lumpur Convention Centre 27–29 March 2018
2018
4. Asiawater 2018 Kuala Lumpur Convention Centre 10–12 April 2018
5. National Seminar on Sustainable Dewan Tan Sri Mahfoz Khalid, 24–25 April 2018
Development Jabatan Kerja Raya Malaysia
6. The 19th International Architecture, Kuala Lumpur Convention Centre 4–7 July 2018
Interior Design & Building Exhibition
(ARCHIDEX) 2018
7. Green Energy Expo Forum 2018 Kuala Lumpur Convention Centre 17–19 July 2018
8. Landscape Asia (LAX) 2018 Kuala Lumpur Convention Centre 27–29 August 2018
9. International Greentech & Eco Products Kuala Lumpur Convention Centre 17–20 October 2018
Exhibition & Conference Malaysia
(IGEM) 2018
10. 44TH IFAWPCA Convention 2018 Kuala Lumpur Convention Centre 12–16 November 2018

Malaysia’s Sustainable
Construction Periodical 27
NEWS & EVENTS

BIM, MyCREST & QLASSIC


Road Tour 2018
We are bringing BIM, MyCREST & QLASSIC knowledge across the country. Find us at the right
place and time, and learn more about what these tools can do for the construction industry.

No. Venue Date

1. Vistana Hotel, Kuantan, Pahang 5 July 2018


2. La Boss Hotel, Melaka 2 August 2018

3. Tabung Haji Hotel, Alor Star, Kedah 29 August 2018

4. Promenade Hotel, Tawau, Sabah 20 September 2018

5. Water Front Hotel, Kuching, Sarawak 4 November 2018

The MAMPAN Expert Forum


Our experts will be hosting a forum on experts all in one place exchanging On top of this, our special expert
four special construction topics! Find their thoughts and expertise. forums are not just a place for you to
us at Sunway Putra Hotel on these learn! In addition to getting exposure
dates. Join in to learn more and have Our forums will be covering special to the latest practices and news,
your questions answered! construction topics which will be you will get an opportunity to mingle
of immense benefit to any industry with the greatest. Learn from them
It’s rare for industry experts in any players looking to learn more and and forge business connections, and
field to gather all at once, and it’s add value to themselves. Subjects increase your value in the industry
even rarer to get the opportunity of paramount importance such as while giving your career a boost. Who
to learn from them. But MAMPAN environmentally friendly developments knows whom else you might meet
is serving as the platform for the and the shape of the government’s and the doors they will open for you?
best and brightest thinkers and role will be covered, and specialist
practitioners in the industry, bringing topics in certain scenarios such as Our forums will be held at Sunway
all that knowledge, experience and natural disasters will also be available. Putra Hotel, Kuala Lumpur. Be sure to
insight in one place. Now you have a Those who attend will be equipped stay tuned to know which forum is up
once-in-a-lifetime opportunity to learn with knowledge for the future and next and when it takes place!
from the masters, seeing the leading prepared for the worst-case scenario.

No. Title Venue Date

1. Government Green Procurement Sunway Putra Hotel, Kuala Lumpur 5 July 2018

2. Landslide Sunway Putra Hotel, Kuala Lumpur 14 May 2018

3. Flood Sunway Putra Hotel, Kuala Lumpur To be confirmed

4. Green Infrastructure Sunway Putra Hotel, Kuala Lumpur To be confirmed

28 Malaysia’s Sustainable
Construction Periodical