You are on page 1of 1
Cc JQ INTERNATIONAL CONSTRUCTION INC. Unit 9-10 2/F BITC Center, Orligas Ave. Cor. Roosevelt St. Greenhills San Juan City Date: January 9, 2019 Ref.No.: — SPICT-SIG-HEO-046L-REV2 HEO 530 Shaw Boulevard, 8” Floor Summit One Tower, Mandaluyong, Manila To 2 MARVIN S. DETERA JR. Management Consultancy Ce ARCHITECT HORACIO GOLPEO JR. HEO Project : THE SIGNATURE RESIDENCE Lot 5 Bik 15 H.V. Dela Costa and Bautista St. Makati City, Phils. Subject 2 REQUEST FOR APPROVAL WALL SETTING OUT Sir, Good Day! With reference to the above mentioned subject, we would like to request your good office for approval of the propose wall setting out located at Unit 9 and 10 of Level 16 to 18 for the purpose of the installation of Vent Stack together with Soil Stack and Downspout all in the same Pipe Please see attached proposed shop drawings for your reference and approval. We are hoping for your good response regarding this matter. Regard: Notedby:, h [oP Al | Tord Mr. Chen Shandong Civil engines Project Manager

You might also like