You are on page 1of 2

 

Project Log 
Amelia McIntyre  

March 2nd, 2019 


2pm-3;30pm 
We went to Rochester to purchase materials such as: Flannel and minky fabric, a fabric blade, 
matching thread, pins, and stabilizing material.  

March 23rd, 2019 


10am-2pm 
Laid out materials and started cutting 5X5 inch squares with flannel materials. 

March 30th, 2019 


11am-1pm 
Continued cutting 5X5 inch squares​. 

April 3rd, 2019 


2pm-7pm 
Finished cutting flannel material into 5X5 inch squares. Cut out 6, 5X5 inch squares in the minky 
fabric. 

April 6th, 2019 


1pm-4pm 
Linda came over to show me the embroidery settings on the machine. We embroidered the 6 
minky squares, and pinned together the top of the first blanket. Then we sewed it together. 

April 8th, 2019 


2pm-7pm 
I sewed two more quilt tops together.  
 

 
 

  2 

April 9th, 2019 


1pm-7pm 
I finished sewing the last three quilt tops together.  

April 17th, 2019 


1pm- 5pm 
Linda came over and taught me how to cut the backing of the blanket to the front. We pinned 
together the front, back and stabilizer. She showed me how to sew the back and how to leave an 
opening to pull the blanket through. Then finish it up by hand sewing the hole shut.  

April 30th, 2019 


1pm-6pm 
Sewed three more blankets together.  

May 2nd, 2019 


1pm-4pm 
Sewed the last two blankets together.  

May 6th, 2019 


2pm-4pm  
Drove to Rochester and dropped the blankets off at the NICU in Saint Mary’s. 

Total Time Spent_ 40.5 hours 


 
 

You might also like