Technical Considerations
and Standards
Dr Hendri
Geldenhuys
• LV Network Performance
2
When the SUN shines…..
3
Things do go wrong………
4
Complex Engagement Triggered
Engineering
Commercial
Legal
5
An Electrical Installation: SANS 10142-1
FA Fixed Appliance
DB Distribution Board FA FA FA FA
CG Control Gear
I Isolation point
CG CG CG CG
Solar
Main Panel
DB
Eskom DB
Meter
kiosk
DB
DB Inverter
OSH Act Accountability
FA FA FA FA
CG CG CG CG
Solar
Utility
Panel
OSH Act Accountability Laid upon
Eskom DB
Main installation user or lessor
Meter I
DB
kiosk
DB
DB Inverter
Utility Approval……SANS 10142-1
FA FA FA FA
1) NRS 097-2 -1: Utility interface
SANS 10142-1
Installation”
CG CG CG CG
2) NRS 097-2-2 : Generator type testing
Solar
“The
Panel
FA FA FA FA
CG CG CG CG
Solar
Assurance of system
Utility
Panel
signed offDBby
Eskom
Main(suitably qualified and experienced)
Meter I
DB
kiosk PrEng or PrTech DB
DB Inverter
Final Standardization State
FA SANS
FA XXX-X
FA FA
SANS 10142-xx
CG CG CG CG
Solar
Wiring of Premises: Panel
SANs and
Wiring of EG DB Compulsory
Inverter
SANS 10142-3 Specs
SANS 10142 Future State
FA SANS
FA XXX-X
FA FA
SANS 10142-4
CG CG CG CG
Eskom
signed off
DB by
Main Trained and Certified
Meter I
DB SANS 10142-1
kiosk
“Master Electrician” DB
Compulsory
SANS 10142-3 DB Inverter
Spec
Safety Requirement: Maintenance
FA Fixed Appliance
DB Distribution Board FA FA FA FA
CG Control Gear
I Isolation point
Feeders with single
“Prosumers” connected
CG CG CG CG
Solar
Panel
Eskom DB
Main
Meter
kiosk Feeders with many distributed
DB
DB
“Prosumers” per LV feeder
connected
DB Inverter
LV Safe Work Practice
EG Dilemma
“YES - we – can.”
18
Safety Requirement: Isolation Point
FA Fixed Appliance
DB Distribution Board FA FA FA FA
CG Control Gear
I Isolation point
CG CG CG CG
Solar
Panel
Eskom DB
I Main
Meter
DB
kiosk
DB
DB Inverter
Utility LV Safe Work Practice
• Identify circuit EG Dilemma
• Open circuit
Can we execute all of
• Isolate circuit these steps in the
• Tag circuit
presence of an
Embedded Generator?
• Lock out circuit
In the case of
• Test at location
MULTIPLE EG on a
• Work shared feeder:
2015-03-03 23
Inverter EG
POS
DB
POC
Rotating Generator EG
POS
DB
POC
geldenhj@eskom.co.za
2015-03-03 26