You are on page 1of 3
Fatima Design Review of Feed Impingement _ ae Plate of Vat tank of RVDF Detailed Report of Design Review of Feed Impingement Plate of Vat tank of RVD at NP plant Prepared By Reviewed By ‘Approved By | “TifarRasoot——} NasirAiaf | M-Aaghar Bilal Project Sup, Project Engineer SA Project eS 7 Projects Unit Pree Lol é \ Materia 883217 Fatima sign novew of Feed Impingement Pat of ‘Vat tank of RVDF Rowtory Dram fillers (RVDF) are installed at NP plant for separation of CN cake and 0s, 6-40-1122 A'B pumps are used to feed the CNTH solution to RVDF from £6-40-2055/56. Vat tank feed nozzles have impingement plte inside the tank RVDF cloth is damaged due to Impingement plate and resulting a shut down of plant Impingement > Plate Sm tk, ~e ore ~~ Vattank Sm thk, > ( Maerial=88321" —) Problem statemen Impingement pate damaged and hits the drum causing cus on cloth, Below are the causes the Impingement plate damages. 1 Thickness loss 2 Welding detached Evaluation: Thickness of plate and tank are Smm and no Major thickness loss reported in tank Material ofboth tank and plate ae SS-321 thats suitable fr this sevice 1. No thickness loss i observed on plate. 2 Welding filer i eported. Proper welding details snot availble on drawing. ‘Solution:- 1 Proper grove plus fillet welding tobe performed as per updated drawing. {auschment-1) (Maint) 2‘Stifener plates tobe added ss per updated drawing (atachment-I) (Maint) 3. DPTofjainco be performed (Insp) Projets Unie Page Lat BEB x ATACHMENT=-L. ta Ce x a rea

You might also like