You are on page 1of 2

COAL CHAIN EQUIPMENT & MAINTENANCE (CCEM)

COMMISSIONING CHECKLIST
NEUTRAMILL
Day/Date : Sabtu/18 Mei 2019 Project : Neutramill
Time : 10.00 WITA Place : Sediment Pond Girimulya
Duration : 1 jam 45 menit

COMPONENT TO STATUS
CHECKED POINT REMARKS
BE CHECKED OK NOT OK
ü  Starting power
ü  Fuel Level
ü  Engine Oil Level
ü  Battery / Accu
Engine
ü  Engine Air Cleaner / Filter
ü  Operating motor rotation
ü  Radiator Coolant
ü   Panel Cleaner
ü  Vibration and Noise
ü  Lubrication
ü  Bearing Temperature
Pump Input
Output
ü  Oil leaks at gaskets
ü  High Speed Coupling
ü  Flow direction as applicable
ü  Inspect valve seals for leakage
ü  Inspect block and bleed for
Valve integrity
ü  Verify valve is holding

ü Valve car sealed/locked/left as per


P&ID

ü  Visible External Corrosion


ü  visible Corrosion of Welded
Water Tank seams
ü  visible Screen Clean
ü  floor no Containment and Clean

ü Positioned in a normal open or


Sprinkle closed state

ü No external or internal leaks

You might also like