LIST DOKUMEN SAFETY (IBPR & JSA) 

Major Shutdown
Project : BLC Upgrade Beyond 44 MTPA
                    PT. Borneo Indobara Update : 20‐Jan‐19

No. Deskripsi No. Dokumen Status Keterangan


 Proses Revisi ‐ JPC
I IBPR ‐
On Progress : 75% 
II JSA ‐ CV‐15 A/B
         1 Penggantian Counter Weight CV‐15A/B ..... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         2 Penggantian Drive Pulley CV‐15A .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         3 Penggantian Drive Pulley CV‐15B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         4 Penggantian Bend Pulley CV‐15A .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         5 Penggantian Bend Pulley CV‐15B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         6 Penggantian HT Bend Pulley CV‐15A .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         7 Penggantian HT Bend Pulley CV‐15B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         8 Pemasangan Drive Unit CV‐15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         9 Penggantian Take up Pulley CV‐15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
       10 Pembongkaran/Melepas Existing Chute CV‐15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
       11 Pemasangan Head Pulley  CV‐15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
       12 Pemasangan Head Chute Bottom CV‐15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
       13 Pemasangan Head Chute Top dan Deflector 15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
       14 Pemasngan Scraper Prymary dan Secondary CV‐15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
       15 Pemasangan Travelling Frame CV‐15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
       16 Penggantian Support Pulley End Tower CV‐15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
       17 Penggantian Funnel Chute CV‐15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
       18 Penggantian Tail Pulley CV‐15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
       19 Pemasangan Head Pulley  CV‐15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
       20 Pengantian Spoon Chute CV‐15A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
       21 Penggantian Tail Pulley CV‐15 A/B .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC

III JSA ‐ CV‐14
         1 Pembongkaran Head Chute CV‐14 .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         2 Penggantian Head Chute CV‐14 .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         3 Penggantian Head Pulley CV‐14 .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         4 Penggantian Drive Unit CV‐14 .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         5 Penggantian Gallery (NSM‐3) CV‐14 .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC
         6 Penggantian Tail Frame CV‐14 .... /JPC/JSA/I/2019 Proses Revisi ‐ JPC