You are on page 1of 1

PT.

JUHDI SAKTI ENGINEERING


3 X 18 MW COAL FIRED POWER PLANT PROJECT

Inspection Form Welding Machine

1. Generator Skedule Inspeksi : Bulanan

No. Parts Condition


Good Broken Remarks
1. Check engine oil
2. Check engine oil Filter
3. Check fuel filter
4. Check air filter
5. Check for engine fluid leaks
6. Check engine cooling fins for blockage
7. Check fan belt/alternator
08. Check engine hot area for rags
09. Check for loose pipes, nuts, bolts, wires and all guards
10. Check condition for all fuel hoses
11. Check condition for all air inlet hoses
12. Check operation of engine protection function
- Oil Pressure
- Air Temperature
- Low oil level
13. Check water leaking (engine cooling system)
2. Skid
No. Parts Remarks
Good Broken Remarks
1. Check whether battery electrolyte level and terminal
are clean / mounting clamp
2. Check battery leads for security and sign of heat or
abrasion and bracket is secure
3. Check door hinges and latch operation
4. Check mudguard, panels are straight, no bare metal
5. Check fuel cap and sealing surface
6. Check if there is moisture at fuel tank
7. Check engine/alternator and radiator rubber mount
condition
8. Check battery isolator
9. Check emergency stop
10. Check fuel tank, drain, mounting
11. Check fuel

3. Travo Las

No. Parts Good Broken Remarks


1 Connection cable from dynamo generator to travo
2 Mounting Welding Cable
3 Welding Cable
4 Switch On/Of

4. Approval Inspector :

Prepared by Approved by
Date : Date :
Name : Name :

Signature : Signature :