1. General information
2. Document overview
This document describes the following:
1. General information ........................................................................................................................................................1
2. Document overview ........................................................................................................................................................1
3. Subject ...........................................................................................................................................................................1
4. Reason for this TSN .......................................................................................................................................................1
5. Description .....................................................................................................................................................................2
6. Application......................................................................................................................................................................2
7. Required parts ................................................................................................................................................................3
8. Planning ordering parts at ASC ......................................................................................................................................3
9. Reimbursement criteria ..................................................................................................................................................3
10. Reporting........................................................................................................................................................................3
3. Subject
Starter motor failures occurring after introduction of new starter motor in the Deutz 2011 engines.
With the introduction of the SSR all above discussed failures can be avoided. This is one of the reasons why on future
machines this SSR option will be installed as standard on involved machine types (serial number of introduction will be
communicated in the coming ECB).
5. Description
The SSR should be installed at the right side of the machine, at the bottom of the rear baffle. Connections of the SSR should
point downwards in order to prevent for water ingress. For mounting on metal units, rivets or bolts are to be used; on PE
machines self tapping screws are most suitable.
Electrical connections are to be made as described below:
- Connections “50e” & “50f” to be connected as described in above schematic. Please note that they can not be swapped.
- Connection between “K4” and “K0” to be deleted
- “D+” connection is indicated as “WL” on the alternator
- “W” connection is indicated as “1” on the alternator; an extra electrical wire should be added.
- Other connections to be added as shown in above schematic
Electrical cables and cable clamps are to be installed with good workmanship to prevent for bad signals, short circuit …
It is advised to use current wire routings for mounting of additional wires.
6. Application
XA(T,H)S 37-137 Dd - XA(T,H)S 70-300 Dd7
9. Reimbursement criteria
Within warranty period: Standard warranty procedure and conditions
Out of warranty period: No coverage
10. Reporting
To be reported via standard warranty procedure.
If a failure occurs on a unit equipped with above solution, a failure report should be created in order to inform the responsible
product company.