AMSTEEL MILLS SDN BHD (KLANG)

OPERATION)

BAR MILL 1 ELECTRICAL INCIDENT REPORT Date : 07/09/2016


TO Mr. Ooi Chong Keong
FROM Wan mahadi ,yusfaisal
C.C Mr Lee weng lan,Mr.low yap loong,Mr.Mahinder
INCIDENT DATE 06/09/2016 SHIFT/GROUP A
TIME START 2225 SHIFT-IN-CHARGE
TIME END 0055 ELEC. LEADER Alias/Eddie
DURATION 150 min Frequent 1

Title: 350 mill motor to oil pump trip


Description of Breakdown:

350 mill motor stop due to oil pump 1 trip & oil pump 2 ( standby) high current

Action Taken:

- Electrical checking oil pump 1 and found breaker trip


- Check motor resistance unbalance and all phase short to ground
R-Y =
3.8Ω
R-B =
2.8Ω
Y - B = 1.7

Check and found fuse 32A blown
Changed 3 pcs of fuse 40A which was found blown
- Switch on oil pump no 2 and trip after a few minute due to high amp (33.5 Amp)
- Check resistance motor oil pump no 2 … ok balance
- Decide to changed spare motor oil pump no 1
- Check rotation and running amp ok …9.8 A

Improvement Plan:

To follow Schedule change pump alternately every 1 month once


Need to changed old fuse type to Circuit breaker and oveload
Need to services the motor every 1 year
Action by:

Shift group

Prepaired by : checked by : Approved by :


Yusfaisal wan mahadi Mr mahinder