KALSELTENG2 CFSPP 2X100MW

IKCP0-YYZ-C-07-0002 DESIGN REPORT FOR PILE BEARING CAPACITY REV.1

4.7 Settlement of Pile

Total Settlement of Pile(St) consist of Elastic settlement of pile(Ss),


settlement of pile caused by the load at the pile tip(Sp) and settlement of pile
caused by the load transmitted along the pile shaft(Sps).
St = Ss + Sp + Sps
(Refer to Appendix F_Reference06)

4.7.1 Elastic settlement of pile(Ss)

Ss = ( Qwp + Įs Qws ) × L / Ap E
Where,
Qwp = Load carried at the pile point under working load condition(kN)
Įs = Distribution factor (=0.67)

Qws = Load carried by friction resistance under working load


condition(kN)
L = Length of pile(m)
Ap = Area of pile cross section(m2)
E = Modulus of elasticity of the pile material(kPa)
Pa = Vertical load

4.7.2 Settlement of pile caused by the load at the pile tip(Sp)

Sp = Cp Qwp / b qp
Where,
Cp = Empirical coefficient (=0.025)
Soil type Driven pile Bored pile
Sand (dense to loose) 0.02 ~ 0.04 0.09 ~ 0.18
Clay (stiff to soft) 0.02 ~ 0.03 0.03 ~ 0.06
Silt (dense to loose) 0.03 ~ 0.05 0.09 ~ 0.12
* 'Design of Pile Foundation', by A.S. Vesic
28
KALSELTENG2 CFSPP 2X100MW
IKCP0-YYZ-C-07-0002 DESIGN REPORT FOR PILE BEARING CAPACITY REV.1

4.7.3 Settlement of pile caused by the load transmitted along the pile
shaft(Sps)
Ssp = Cs Qws / Lc qp
Where,
Cs = Empirical constant
= (0.93 + 0.16 ) Cp
Lc = Embedded length of pile(m)

Table 4.1 Summary of Pile Settlement for PC Pile Dia. 400mm


Settlement (mm)
Borehole Length
Ss Sp Ssp St
BH-1 22 4.83 1.46 0.10 6.39
BH-2 20 4.27 1.53 0.12 5.92
BH-3 17 3.59 1.41 0.13 5.13
BH-4 22 4.91 1.52 0.09 6.51
BH-5 22 4.86 1.43 0.09 6.39
BH-6 21 4.59 1.42 0.10 6.11
BH-7 22 4.95 1.59 0.08 6.63
BH-8 21 4.58 1.39 0.10 6.08
BH-9 20 4.27 1.54 0.12 5.92
BH-10 22 4.94 1.58 0.08 6.61
BH-11 23 5.18 1.51 0.08 6.76
BH-12 20 4.25 1.49 0.12 5.86
BH-13 21 4.64 1.52 0.10 6.26
BH-14 20 4.21 1.41 0.12 5.74
BH-15 21 4.58 1.39 0.10 6.07
BH-16 22 4.93 1.56 0.08 6.58
BH-17 23 5.21 1.56 0.07 6.84
BH-18 21 4.65 1.53 0.10 6.28
BH-19 21 4.60 1.44 0.10 6.14
BH-20 24 5.46 1.47 0.06 7.00
BH-21 21 4.60 1.43 0.10 6.14
BH-22 21 4.58 1.38 0.10 6.06
BH-24 21 4.58 1.40 0.10 6.08
BH-25 21 4.67 1.57 0.10 6.34
BH-29 23 5.05 1.55 0.08 6.68
BH-30 18 3.86 1.37 0.14 5.37
BH-31 18 3.86 1.36 0.14 5.36
BH-32 24 5.42 1.51 0.07 7.00
BH-33 18 3.93 1.55 0.13 5.61
BH-34 20 4.20 1.36 0.12 5.68
BH-35 20 4.04 1.36 0.12 5.52
29
KALSELTENG2 CFSPP 2X100MW
IKCP0-YYZ-C-07-0002 DESIGN REPORT FOR PILE BEARING CAPACITY REV.1

Table 4.2 Summary of Pile Settlement for PC Pile Dia. 600mm


Settlement (mm)
Borehole Length
Ss Sp Ssp St
BH-1 23 4.96 2.12 0.14 7.22
BH-2 21 4.61 2.06 0.15 6.82
BH-3 18 4.00 2.15 0.15 6.30
BH-4 23 5.16 2.07 0.11 7.34
BH-5 23 5.02 2.10 0.12 7.24
BH-6 22 4.84 1.98 0.13 6.95
BH-7 23 5.20 2.15 0.11 7.45
BH-8 21 4.65 2.16 0.14 6.95
BH-9 21 4.59 2.01 0.15 6.75
BH-10 23 5.18 2.10 0.11 7.39
BH-11 24 5.39 2.03 0.11 7.52
BH-12 21 4.57 1.97 0.15 6.69
BH-13 22 4.83 2.09 0.15 7.06
BH-14 21 4.55 1.92 0.16 6.63
BH-15 21 4.65 2.16 0.14 6.95
BH-16 23 5.17 2.09 0.11 7.38
BH-17 24 5.44 2.14 0.10 7.69
BH-18 22 4.90 2.10 0.13 7.12
BH-19 22 4.87 2.03 0.13 7.02
BH-20 24 5.54 2.18 0.09 7.80
BH-21 22 4.86 2.00 0.13 6.99
BH-22 21 4.64 2.15 0.14 6.93
BH-24 21 4.65 2.17 0.14 6.96
BH-25 23 5.03 2.12 0.12 7.26
BH-29 24 5.39 2.04 0.11 7.54
BH-30 18 3.91 2.16 0.19 6.27
BH-31 18 3.91 2.15 0.19 6.26
BH-32 25 5.68 2.06 0.09 7.83
BH-33 20 4.26 2.15 0.17 6.58
BH-34 20 4.25 2.14 0.18 6.57
BH-35 21 5.06 2.14 0.17 7.38