You are on page 1of 25

1 15.1 A Restoration 54 cum 101 5454 total 7.

2% raincuts for 2nd year


4 15.3.IV Maintenance of Bituminous surface (Repair to pot holes and removal of loose material)
5 15.7.I Maintenance of Hume pipe culverts
6 15.9 Maintenance of Road signs
7 15.10.II Maintenance of RCC railing
15.11 Maintenance of 200 m stones and Km stones
15.12.I Cutting branches of trees from roadway
15.12.II Cutting of shrubs from roadway

For 2nd Year


1 15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
2 15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
3 15.3.I Repair of p 0 sqm 6976 0 not required
4 15.3.IV Maintenanc 0 sqm 165 0 not required
5 15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
6 15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
7 15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
8 15.11 Maintenanc 1 km 326 326
9 15.12.I Cutting br 20 no 64 1280
10 15.12.II Cutting of 40 no 4 160
11 15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass tri
12 15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
For 2nd Year
1 15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
2 15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
3 15.3.I Repair of p 0 sqm 6976 0 not required
4 15.3.IV Maintenanc 0 sqm 165 0 not required
5 15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
6 15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
7 15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
8 15.11 Maintenanc 1 km 326 326
9 15.12.I Cutting br 20 no 64 1280
10 15.12.II Cutting of 40 no 4 160
11 15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
12 15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
10 15.12.II Cutting of 40 no 4 160
11 15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
12 15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
2 15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
3 15.3.I Repair of p 0 sqm 6976 0 not required
4 15.3.IV Maintenanc 0 sqm 165 0 not required
5 15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
6 15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
7 15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
8 15.11 Maintenanc 1 km 326 326
9 15.12.I Cutting br 20 no 64 1280
10 15.12.II Cutting of 40 no 4 160
11 15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
12 15.13 White wash 10 sqm 13 130
15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
For 3rd Year
5 15.7.I Maintenance of Hume pipe culverts 1 15.1 A
6 15.9 Maintenance of Road signs 2 15.2.I
7 15.10.II Maintenance of RCC railing 3 15.3.I
8 15.11 Maintenance of 200 m stones and Km stones 4 15.3.IV
9 15.12.I Cutting branches of trees from roadway 5 15.7.I
10 15.12.II Cutting of shrubs from roadway 6 15.9
11 15.12.III Trimming grass and weeds from shoulder 7 15.10.II
12 15.13 White washing of parapet walls of CD works 8 15.11
Total 9 15.12.I
10 15.12.II
For 3rd Year 11 15.12.III
1 15.1 A Restoration of rain cuts 12 15.13
2 15.2.I Maintenance of earthen shoulder ( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of failed material and filling with 75mm BM
4 15.3.IV Maintenance of Bituminous surface (Repair to pot holes and removal of loose material)
5 15.7.I Maintenance of Hume pipe culverts
6 15.9 Maintenance of Road signs
7 15.10.II Maintenance of RCC railing
15.11 Maintenance of 200 m stones and Km stones
15.12.I Cutting branches of trees from roadway
15.12.II Cutting of shrubs from roadway

For 2nd Year


15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
For 2nd Year
15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130

15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
For 3rd Year
5 15.7.I Maintenance of Hume pipe culverts 1 15.1 A
6 15.9 Maintenance of Road signs 2 15.2.I
7 15.10.II Maintenance of RCC railing 3 15.3.I
8 15.11 Maintenance of 200 m stones and Km stones 4 15.3.IV
9 15.12.I Cutting branches of trees from roadway 5 15.7.I
10 15.12.II Cutting of shrubs from roadway 6 15.9
11 15.12.III Trimming grass and weeds from shoulder 7 15.10.II
12 15.13 White washing of parapet walls of CD works 8 15.11
Total 9 15.12.I
10 15.12.II
For 3rd Year 11 15.12.III
1 15.1 A Restoration of rain cuts 12 15.13
2 15.2.I Maintenance of earthen shoulder ( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of failed material and filling with 75mm BM
4 15.3.IV Maintenance of Bituminous surface (Repair to pot holes and removal of loose material)
5 15.7.I Maintenance of Hume pipe culverts
6 15.9 Maintenance of Road signs
7 15.10.II Maintenance of RCC railing
15.11 Maintenance of 200 m stones and Km stones
15.12.I Cutting branches of trees from roadway
15.12.II Cutting of shrubs from roadway

For 2nd Year


15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
For 2nd Year
15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
For 3rd Year
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
or 2nd year 101 5454 total 7.2% raincuts for 2nd year
moval of loose material)

or 2nd year 101 5454 total 7.2% raincuts for 2nd year
62 18600 total 12 % for 1st year
6976 0 not required
165 0 not required
done twice a year 1238 4952 maintenance to be done twice a year
done once in 2 years 927 463.5 maintenance to be done once in 2 years
uiring maintenance 148 112.48 considering 4% requiring maintenance
326 326
64 1280
4 160
the total area requiring grass tri 1 337.5 considering 15% of the total area requiring grass trimming
13 130
31815.48
Say Rs. 31815

or 2nd year 101 5454 total 7.2% raincuts for 2nd year
62 18600 total 12 % for 1st year
6976 0 not required
165 0 not required
done twice a year 1238 4952 maintenance to be done twice a year
done once in 2 years 927 463.5 maintenance to be done once in 2 years
uiring maintenance 148 112.48 considering 4% requiring maintenance
326 326
64 1280
4 160
the total area requiring grass trimming 1 337.5 considering 15% of the total area requiring grass trimming
13 130
31815.48

101 5454 total 7.2% raincuts for 2nd year


the total area requiring grass trimming 62 18600 total 12 % for 1st year
6976 0 not required
165 0 not required
1238 4952 maintenance to be done twice a year
927 463.5 maintenance to be done once in 2 years
148 112.48 considering 4% requiring maintenance
326 326
done twice a year 64 1280
done once in 2 years 4 160
uiring maintenance 1 337.5 considering 15% of the total area requiring grass trimming
13 130
31815.48
the total area requiring grass trimming

or 2nd year

done twice a year


done once in 2 years
uiring maintenance

the total area requiring grass trimming

For 2nd Year


Restoration 54
Maintenance 300
Repair of p 0
Maintenanc 0
Maintenanc 4
Maintenanc 0.5
Maintenanc 0.76
Maintenanc 1
Cutting br 20
Cutting of 40
Trimming g 337.5
White wash 10
Total

moval of loose material)

or 2nd year

done twice a year


done once in 2 years
uiring maintenance

the total area requiring grass trimming


or 2nd year

done twice a year


done once in 2 years
uiring maintenance

the total area requiring grass trimming

the total area requiring grass trimming

done twice a year


done once in 2 years
uiring maintenance

the total area requiring grass trimming

or 2nd year

done twice a year


done once in 2 years
uiring maintenance

the total area requiring grass trimming

For 2nd Year


Restoration 54 cum
Maintenance 300 sqm
Repair of p 0 sqm
Maintenanc 0 sqm
Maintenanc 4 no
Maintenanc 0.5 km
Maintenanc 0.76 m
Maintenanc 1 km
Cutting br 20 no
Cutting of 40 no
Trimming g 337.5 sqm
White wash 10 sqm
Total

moval of loose material)

or 2nd year

done twice a year


done once in 2 years
uiring maintenance

the total area requiring grass trimming

or 2nd year

done twice a year


done once in 2 years
uiring maintenance

the total area requiring grass trimming

the total area requiring grass trimming


done twice a year
done once in 2 years
uiring maintenance

the total area requiring grass trimming

or 2nd year

done twice a year


done once in 2 years
uiring maintenance

the total area requiring grass trimming

For 2nd Year

the total area requiring grass trimming

or 2nd year

done twice a year


done once in 2 years
uiring maintenance

the total area requiring grass trimming

the total area requiring grass trimming

or 2nd year
done twice a year
done once in 2 years
uiring maintenance

the total area requiring grass trimming


g grass trimming

g grass trimming
1 15.1 A Restoration 54 cum 101 5454
4 15.3.IV Maintenance of Bituminous surface (Repair to pot holes and removal of loose material)
5 15.7.I Maintenance of Hume pipe culverts
6 15.9 Maintenance of Road signs 1 15.1 A Restoration
7 15.10.II Maintenance of RCC railing 4 15.3.IV
15.11 Maintenance of 200 m stones and Km stones 5 15.7.I
15.12.I Cutting branches of trees from roadway 6 15.9
15.12.II Cutting of shrubs from roadway 7 15.10.II
15.11
For 2nd Year 15.12.I
1 15.1 A Restoration 54 cum 101 5454 15.12.II
2 15.2.I Maintenance 300 sqm 62 18600
3 15.3.I Repair of p 0 sqm 6976 0 For 2nd Year
4 15.3.IV Maintenanc 0 sqm 165 0 1 15.1 A Restoration
5 15.7.I Maintenanc 4 no 1238 4952 2 15.2.I Maintenance
6 15.9 Maintenanc 0.5 km 927 463.5 3 15.3.I Repair of p
7 15.10.II Maintenanc 0.76 m 148 112.48 4 15.3.IV Maintenanc
8 15.11 Maintenanc 1 km 326 326 5 15.7.I Maintenanc
9 15.12.I Cutting br 20 no 64 1280 6 15.9 Maintenanc
10 15.12.II Cutting of 40 no 4 160 7 15.10.II Maintenanc
11 15.12.III Trimming g 337.5 sqm 1 337.5 8 15.11 Maintenanc
12 15.13 White wash 10 sqm 13 130 9 15.12.I Cutting br
Total 31815.48 10 15.12.II Cutting of
Say Rs. 31815 11 15.12.III Trimming g
For 2nd Year 12 15.13 White wash
1 15.1 A Restoration 54 cum 101 5454 Total
2 15.2.I Maintenance 300 sqm 62 18600
3 15.3.I Repair of p 0 sqm 6976 0 For 2nd Year
4 15.3.IV Maintenanc 0 sqm 165 0 1 15.1 A Restoration
5 15.7.I Maintenanc 4 no 1238 4952 2 15.2.I Maintenance
6 15.9 Maintenanc 0.5 km 927 463.5 3 15.3.I Repair of p
7 15.10.II Maintenanc 0.76 m 148 112.48 4 15.3.IV Maintenanc
8 15.11 Maintenanc 1 km 326 326 5 15.7.I Maintenanc
9 15.12.I Cutting br 20 no 64 1280 6 15.9 Maintenanc
10 15.12.II Cutting of 40 no 4 160 7 15.10.II Maintenanc
11 15.12.III Trimming g 337.5 sqm 1 337.5 8 15.11 Maintenanc
12 15.13 White wash 10 sqm 13 130 9 15.12.I Cutting br
Total 31815.48 10 15.12.II Cutting of
Say Rs. 31815 11 15.12.III Trimming g
10 15.12.II Cutting of 40 no 4 160 12 15.13 White wash
11 15.12.III Trimming g 337.5 sqm 1 337.5 Total
12 15.13 White wash 10 sqm 13 130
Total 31815.48 10 15.12.II Cutting of
Say Rs. 31815 11 15.12.III Trimming g
2 15.2.I Maintenance 300 sqm 62 18600 12 15.13 White wash
3 15.3.I Repair of p 0 sqm 6976 0 Total
4 15.3.IV Maintenanc 0 sqm 165 0
5 15.7.I Maintenanc 4 no 1238 4952 2 15.2.I Maintenance
6 15.9 Maintenanc 0.5 km 927 463.5 3 15.3.I Repair of p
7 15.10.II Maintenanc 0.76 m 148 112.48 4 15.3.IV Maintenanc
8 15.11 Maintenanc 1 km 326 326 5 15.7.I Maintenanc
9 15.12.I Cutting br 20 no 64 1280 6 15.9 Maintenanc
10 15.12.II Cutting of 40 no 4 160 7 15.10.II Maintenanc
11 15.12.III Trimming g 337.5 sqm 1 337.5 8 15.11 Maintenanc
12 15.13 White wash 10 sqm 13 130 9 15.12.I Cutting br
15.1 A Restoration 54 cum 101 5454 10 15.12.II Cutting of
15.2.I Maintenance 300 sqm 62 18600 11 15.12.III Trimming g
15.3.I Repair of p 0 sqm 6976 0 12 15.13 White wash
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
For 3rd Year 15.13 White wash
5 15.7.I Maintenance of Hume pipe culverts Total
6 15.9 Maintenance of Road signs
7 15.10.II Maintenance of RCC railing For 3rd Year
8 15.11 Maintenance of 200 m stones and Km stones 5 15.7.I
9 15.12.I Cutting branches of trees from roadway 6 15.9
10 15.12.II Cutting of shrubs from roadway 7 15.10.II
11 15.12.III Trimming grass and weeds from shoulder 8 15.11
12 15.13 White washing of parapet walls of CD works 9 15.12.I
Total 10 15.12.II
11 15.12.III
For 3rd Year 12 15.13
1 15.1 A Restoration of rain cuts
2 15.2.I Maintenance of earthen shoulder ( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of failed material and filling with 75mm BM
4 15.3.IV Maintenance of Bituminous surface (Repair to pot hol 1 15.1 A
5 15.7.I Maintenance of Hume pipe culverts 2 15.2.I
6 15.9 Maintenance of Road signs 3 15.3.I
7 15.10.II Maintenance of RCC railing 4 15.3.IV
15.11 Maintenance of 200 m stones and Km stones 5 15.7.I
15.12.I Cutting branches of trees from roadway 6 15.9
15.12.II Cutting of shrubs from roadway 7 15.10.II
15.11
For 2nd Year 15.12.I
15.1 A Restoration 54 cum 101 5454 15.12.II
15.2.I Maintenance 300 sqm 62 18600
15.3.I Repair of p 0 sqm 6976 0 For 2nd Year
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
For 2nd Year 15.13 White wash
15.1 A Restoration 54 cum 101 5454 Total
15.2.I Maintenance 300 sqm 62 18600
15.3.I Repair of p 0 sqm 6976 0 For 2nd Year
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
15.12.II Cutting of 40 no 4 160 15.13 White wash
15.12.III Trimming g 337.5 sqm 1 337.5 Total
15.13 White wash 10 sqm 13 130
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
15.2.I Maintenance 300 sqm 62 18600 15.13 White wash
15.3.I Repair of p 0 sqm 6976 0 Total
15.3.IV Maintenanc 0 sqm 165 0
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
15.12.II Cutting of
15.1 A Restoration 54 cum 101 5454 15.12.III Trimming g
15.2.I Maintenance 300 sqm 62 18600 15.13 White wash
15.3.I Repair of p 0 sqm 6976 0
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
For 3rd Year 15.13 White wash
5 15.7.I Maintenance of Hume pipe culverts Total
6 15.9 Maintenance of Road signs
7 15.10.II Maintenance of RCC railing For 3rd Year
8 15.11 Maintenance of 200 m stones and Km stones 5 15.7.I
9 15.12.I Cutting branches of trees from roadway 6 15.9
10 15.12.II Cutting of shrubs from roadway 7 15.10.II
11 15.12.III Trimming grass and weeds from shoulder 8 15.11
12 15.13 White washing of parapet walls of CD works 9 15.12.I
Total 10 15.12.II
11 15.12.III
For 3rd Year 12 15.13
1 15.1 A Restoration of rain cuts
2 15.2.I Maintenance of earthen shoulder ( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of failed material and filling with 75mm BM
4 15.3.IV Maintenance of Bituminous surface (Repair to pot hol 1 15.1 A
5 15.7.I Maintenance of Hume pipe culverts 2 15.2.I
6 15.9 Maintenance of Road signs 3 15.3.I
7 15.10.II Maintenance of RCC railing 4 15.3.IV
15.11 Maintenance of 200 m stones and Km stones 5 15.7.I
15.12.I Cutting branches of trees from roadway 6 15.9
15.12.II Cutting of shrubs from roadway 7 15.10.II
15.11
For 2nd Year 15.12.I
15.1 A Restoration 54 cum 101 5454 15.12.II
15.2.I Maintenance 300 sqm 62 18600
15.3.I Repair of p 0 sqm 6976 0 For 2nd Year
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
For 2nd Year 15.13 White wash
15.1 A Restoration 54 cum 101 5454 Total
15.2.I Maintenance 300 sqm 62 18600
15.3.I Repair of p 0 sqm 6976 0 For 2nd Year
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
15.12.II Cutting of 40 no 4 160 15.13 White wash
15.12.III Trimming g 337.5 sqm 1 337.5 Total
15.13 White wash 10 sqm 13 130
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
15.2.I Maintenance 300 sqm 62 18600 15.13 White wash
15.3.I Repair of p 0 sqm 6976 0 Total
15.3.IV Maintenanc 0 sqm 165 0
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
15.1 A Restoration 54 cum 101 5454 15.12.II Cutting of
15.2.I Maintenance 300 sqm 62 18600 15.12.III Trimming g
15.3.I Repair of p 0 sqm 6976 0 15.13 White wash
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
For 3rd Year 15.13 White wash
15.11 Maintenanc 1 km 326 326 Total
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160 For 3rd Year
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
15.1 A Restoration 54 cum 101 5454 15.12.II Cutting of
15.2.I Maintenance 300 sqm 62 18600 15.12.III Trimming g
15.3.I Repair of p 0 sqm 6976 0 15.13 White wash
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
15.11 Maintenanc 1 km 326 326 15.13 White wash
15.12.I Cutting br 20 no 64 1280 Total
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
15.1 A Restoration 54 cum 101 5454 15.12.II Cutting of
15.2.I Maintenance 300 sqm 62 18600 15.12.III Trimming g
15.3.I Repair of p 0 sqm 6976 0 15.13 White wash
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
15.13 White wash
Total
moval of loose material)

54 cum 101 5454


Maintenance of Bituminous surface (Repair to pot holes and removal of loose material)
Maintenance of Hume pipe culverts
Maintenance of Road signs
Maintenance of RCC railing
Maintenance of 200 m stones and Km stones
Cutting branches of trees from roadway
Cutting of shrubs from roadway

For 2nd Year


54 cum 101 5454
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
For 2nd Year
54 cum 101 5454
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
54 cum 101 5454
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
For 3rd Year
Maintenance of Hume pipe culverts
Maintenance of Road signs
Maintenance of RCC railing
Maintenance of 200 m stones and Km stones
Cutting branches of trees from roadway
Cutting of shrubs from roadway
Trimming grass and weeds from shoulder
White washing of parapet walls of CD works
Total

For 3rd Year


Restoration of rain cuts
Maintenance of earthen shoulder ( stripping of excess soil)
Repair of pot holes by removal of failed material and filling with 75mm BM
Maintenance of Bituminous surface (Repair to pot holes and removal of loose material)
Maintenance of Hume pipe culverts
Maintenance of Road signs
Maintenance of RCC railing
Maintenance of 200 m stones and Km stones
Cutting branches of trees from roadway
Cutting of shrubs from roadway

For 2nd Year


54 cum 101 5454
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
For 2nd Year
54 cum 101 5454
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130

54 cum 101 5454


300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
For 3rd Year
Maintenance of Hume pipe culverts
Maintenance of Road signs
Maintenance of RCC railing
Maintenance of 200 m stones and Km stones
Cutting branches of trees from roadway
Cutting of shrubs from roadway
Trimming grass and weeds from shoulder
White washing of parapet walls of CD works
Total

For 3rd Year


Restoration of rain cuts
Maintenance of earthen shoulder ( stripping of excess soil)
Repair of pot holes by removal of failed material and filling with 75mm BM
Maintenance of Bituminous surface (Repair to pot holes and removal of loose material)
Maintenance of Hume pipe culverts
Maintenance of Road signs
Maintenance of RCC railing
Maintenance of 200 m stones and Km stones
Cutting branches of trees from roadway
Cutting of shrubs from roadway

For 2nd Year


54 cum 101 5454
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
For 2nd Year
54 cum 101 5454
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
54 cum 101 5454
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
For 3rd Year
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
54 cum 101 5454
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
54 cum 101 5454
300 sqm 62 18600
0 sqm 6976 0
0 sqm 165 0
4 no 1238 4952
0.5 km 927 463.5
0.76 m 148 112.48
1 km 326 326
20 no 64 1280
40 no 4 160
337.5 sqm 1 337.5
10 sqm 13 130
31815.48
Say Rs. 31815