You are on page 1of 246

WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Name of Work WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
48817 C 113.85 0.00 114.15 0.00 2104.20 2095.11 9.09
L-1 3.72 113.55 6.00 113.95 112.52 112.52 113.55 113.85 113.65 113.02 113.02
L-2 5.10 112.52 8.20 112.52 0.00 3.40 4.78 8.50 12.25 14.10 18.50
L-3 8.50 112.52 116.48
R-1 3.75 113.65 6.00 113.93 112.52 113.95 114.15 113.93 113.02
R-2 5.60 113.02 7.40 113.02 0.30 2.50 8.50 14.50 15.90
R-3 10.00 113.02 116.48
114.92 116.48
48850 C 112.71 48850.00 113.01 0.00 2251.25 2243.89 7.37
L-1 3.75 112.10 6.00 112.81 111.57 111.57 112.10 112.71 112.69 112.38 112.38
L-2 5.55 111.57 7.90 111.57 0.00 5.45 7.25 11.00 14.50 17.00 20.00
L-3 11.00 111.57 116.48
R-1 3.50 112.69 6.00 112.79 111.57 112.81 113.01 112.79 112.38
R-2 6.00 112.38 6.70 112.38 3.10 5.00 11.00 17.00 17.70
R-3 9.00 112.38 116.48
114.92 116.48
48900 C 113.37 48900.00 113.67 0.00 2038.72 2030.46 8.26
L-1 3.95 112.87 6.00 113.47 112.22 112.22 112.87 113.37 113.12 112.47 112.47
L-2 6.15 112.22 7.90 112.22 0.00 3.35 5.55 9.50 13.50 16.38 18.00
L-3 9.50 112.22 116.48
R-1 4.00 113.12 6.00 113.45 112.22 113.47 113.67 113.45 112.47
R-2 6.88 112.47 7.50 112.47 1.60 3.50 9.50 15.50 17.00
R-3 8.50 112.47 116.48
114.92 116.48
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
48950 C 113.59 48950.00 113.89 0.00 2032.49 2025.38 7.10
L-1 3.88 113.12 6.00 113.69 112.62 112.62 113.12 113.59 113.30 113.22 113.22
L-2 5.95 112.62 7.70 112.62 0.00 3.50 5.57 9.45 13.40 15.57 17.90
L-3 9.45 112.62 116.48
R-1 3.95 113.30 6.00 113.67 112.62 113.69 113.89 113.67 113.22
R-2 6.12 113.22 6.70 113.22 1.75 3.45 9.45 15.45 16.15
R-3 8.45 113.22 116.48
114.92 116.48
49000 C 114.28 49000.00 114.58 0.00 2054.15 2041.52 12.64
L-1 3.77 113.68 6.00 114.38 112.52 112.52 113.68 114.28 114.16 112.77 112.77
L-2 6.00 112.52 8.80 112.52 0.00 3.00 5.23 9.00 12.80 15.00 18.00
L-3 9.00 112.52 116.48
R-1 3.80 114.16 6.00 114.36 112.52 114.38 114.58 114.36 112.77
R-2 6.00 112.77 8.40 112.77 0.20 3.00 9.00 15.00 17.40
R-3 9.00 112.77 116.48
114.92 116.48
49050 C 112.71 49050.00 113.01 0.00 1871.25 1863.63 7.63
L-1 3.82 112.10 6.00 112.81 111.57 111.57 112.10 112.71 112.59 112.38 112.38
L-2 5.65 111.57 7.90 111.57 0.00 2.75 4.58 8.40 12.15 13.75 16.60
L-3 8.40 111.57 116.48
R-1 3.75 112.59 6.00 112.79 111.57 112.81 113.01 112.79 112.38
R-2 5.35 112.38 6.70 112.38 0.50 2.40 8.40 14.40 15.10
R-3 8.20 112.38 116.48
114.92 `
49100 C 113.37 49100.00 113.67 0.00 1903.90 1895.34 8.56
L-1 3.91 112.87 6.00 113.47 112.22 112.22 112.87 113.37 113.12 112.47 112.47
L-2 6.05 112.22 7.90 112.22 0.00 2.85 4.99 8.90 12.88 15.05 16.80
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-3 8.90 112.22 116.48
R-1 3.98 113.12 6.00 113.45 112.22 113.47 113.67 113.45 112.47
R-2 6.15 112.47 7.50 112.47 1.00 2.90 8.90 14.90 16.40
R-3 7.90 112.47 116.48
114.92 116.48
49150 C 113.59 49150.00 113.89 0.00 1907.87 1899.78 8.09
L-1 4.00 113.12 6.00 113.69 112.62 112.62 113.12 113.59 113.30 112.72 112.72
L-2 6.05 112.62 7.70 112.62 0.00 2.95 5.00 9.00 12.96 15.00 16.80
L-3 9.00 112.62 116.48
R-1 3.96 113.30 6.00 113.67 112.62 113.69 113.89 113.67 112.72
R-2 6.00 112.72 7.50 112.72 1.30 3.00 9.00 15.00 16.50
R-3 7.80 112.72 116.48
114.92 116.48
49200 C 114.05 49200.00 114.35 0.00 1803.00 1796.81 6.19
L-1 3.79 113.70 6.00 114.15 113.50 113.50 113.70 114.05 113.68 113.56 113.56
L-2 6.00 113.50 7.00 113.50 0.00 1.80 4.01 7.80 11.74 13.85 15.80
L-3 7.80 113.50 116.48
R-1 3.94 113.68 6.00 114.13 113.50 114.15 114.35 114.13 113.56
R-2 6.05 113.56 6.90 113.56 0.80 1.80 7.80 13.80 14.70
R-3 8.00 113.56 116.48
114.92 116.48
49250 C 113.30 49250.00 113.60 0.00 1925.01 1917.77 7.24
L-1 3.88 113.42 6.00 113.40 111.92 111.92 113.42 113.30 113.38 112.12 112.12
L-2 6.28 111.92 8.30 111.92 0.00 2.22 4.62 8.50 12.35 14.38 17.00
L-3 8.50 111.92 116.48
R-1 3.85 113.38 6.00 113.38 111.92 113.40 113.60 113.38 112.12
R-2 5.88 112.12 7.90 112.12 0.20 2.50 8.50 14.50 16.40
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-3 8.50 112.12 116.48
114.92 116.48
49300 C 112.97 49300.00 113.27 0.00 2253.82 2242.60 11.21
L-1 3.76 112.62 6.00 113.07 111.52 111.52 112.62 112.97 112.72 111.42 111.42
L-2 6.00 111.52 8.40 111.52 0.00 5.00 7.24 11.00 14.87 17.15 20.00
L-3 11.00 111.52 116.48
R-1 3.87 112.72 6.00 113.05 111.52 113.07 113.27 113.05 111.42
R-2 6.15 111.42 8.50 111.42 2.60 5.00 11.00 17.00 19.50
R-3 9.00 111.42 116.48
114.92 116.48
49350 C 113.88 49350.00 114.18 0.00 2049.05 2042.60 6.45
L-1 3.95 113.78 6.00 113.98 113.32 113.32 113.78 113.88 113.47 112.92 112.92
L-2 6.50 113.32 7.00 113.32 0.00 3.00 5.55 9.50 13.50 15.50 18.00
L-3 9.50 113.32 116.48
R-1 4.00 113.47 6.00 113.96 113.32 113.98 114.18 113.96 112.92
R-2 6.00 112.92 7.60 112.92 2.50 3.50 9.50 15.50 17.10
R-3 8.50 112.92 116.48
114.92 116.48
49400 C 113.98 49400.00 114.28 0.00 2037.75 2027.23 10.53
L-1 3.97 113.72 6.00 114.08 112.46 112.46 113.72 113.98 113.57 112.72 112.72
L-2 6.06 112.46 8.50 112.46 0.00 3.39 5.48 9.45 13.40 15.57 17.90
L-3 9.45 112.46 116.48
R-1 3.95 113.57 6.00 114.06 112.46 114.08 114.28 114.06 112.72
R-2 6.12 112.72 8.10 112.72 0.95 3.45 9.45 15.45 17.55
R-3 8.45 112.72 116.48
114.92 116.48
49450 C 113.52 49450.00 113.82 0.00 2263.83 2250.54 13.30
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-1 3.89 113.32 6.00 113.62 111.62 111.62 113.32 113.52 113.22 111.79 111.79
L-2 6.00 111.62 9.00 111.62 0.00 4.00 6.11 10.00 13.78 16.00 20.00
L-3 10.00 111.62 116.48
R-1 3.78 113.22 6.00 113.60 111.62 113.62 113.82 113.60 111.79
R-2 6.00 111.79 8.80 111.79 1.00 4.00 10.00 16.00 18.80
R-3 10.00 111.79 116.48
114.92 116.48
49500 C 113.39 49500.00 113.69 0.00 1882.04 1873.70 8.34
L-1 3.77 112.82 6.00 113.49 112.57 112.57 112.82 113.39 113.17 112.32 112.32
L-2 5.46 112.57 7.40 112.57 0.00 2.94 4.63 8.40 12.34 14.72 16.60
L-3 8.40 112.57 116.48
R-1 3.94 113.17 6.00 113.47 112.57 113.49 113.69 113.47 112.32
R-2 6.32 112.32 7.80 112.32 1.00 2.40 8.40 14.40 16.20
R-3 8.20 112.32 116.48
114.92 116.48
49550 C 114.14 49550.00 114.44 0.00 2387.45 2370.28 17.17
L-1 3.86 113.86 6.00 114.24 111.82 111.82 113.86 114.14 113.83 111.91 111.91
L-2 6.05 111.82 9.70 111.82 0.00 3.95 6.14 10.00 13.98 16.15 21.00
L-3 10.00 111.82 116.48
R-1 3.98 113.83 6.00 114.22 111.82 114.24 114.44 114.22 111.91
R-2 6.15 111.91 9.50 111.91 0.30 4.00 10.00 16.00 19.50
R-3 11.00 111.91 116.48
114.92 116.48
49600 C 113.34 49600.00 113.64 0.00 1993.85 1988.10 5.75
L-1 3.75 113.23 6.00 113.44 112.46 112.46 113.23 113.34 113.22 112.72 112.72
L-2 6.00 112.46 7.50 112.46 0.00 3.80 6.05 9.80 13.75 15.90 17.60
L-3 9.80 112.46 116.48
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-1 3.95 113.22 6.00 113.42 112.46 113.44 113.64 113.42 112.72
R-2 6.10 112.72 7.10 112.72 2.30 3.80 9.80 15.80 16.90
R-3 7.80 112.72 116.48
114.92 116.48
49650 C 112.16 49650.00 112.46 0.00 1961.24 1952.09 9.15
L-1 3.79 111.88 6.00 112.26 110.94 110.94 111.88 112.16 111.82 111.06 111.06
L-2 6.00 110.94 8.00 110.94 0.00 2.50 4.71 8.50 12.25 14.55 17.50
L-3 8.50 110.94 116.48
R-1 3.75 111.82 6.00 112.24 110.94 112.26 112.46 112.24 111.06
R-2 6.05 111.06 7.80 111.06 0.50 2.50 8.50 14.50 16.30
R-3 9.00 111.06 116.48
114.92 116.48
49700 C 113.68 49700.00 113.98 0.00 1931.59 1922.26 9.33
L-1 3.97 113.22 6.00 113.78 112.57 112.57 113.22 113.68 113.47 112.46 112.46
L-2 5.65 112.57 7.90 112.57 0.00 2.85 4.53 8.50 12.40 14.48 17.00
L-3 8.50 112.57 116.48
R-1 3.90 113.47 6.00 113.76 112.57 113.78 113.98 113.76 112.46
R-2 5.98 112.46 8.00 112.46 0.60 2.50 8.50 14.50 16.50
R-3 8.50 112.46 116.48
114.92 116.48
49750 C 112.65 49750.00 112.95 0.00 2247.00 2236.45 10.55
L-1 3.99 112.42 6.00 112.75 111.03 111.03 112.42 112.65 112.42 111.22 111.22
L-2 6.45 111.03 8.60 111.03 0.00 4.55 7.01 11.00 14.84 17.00 20.00
L-3 11.00 111.03 116.48
R-1 3.84 112.42 6.00 112.73 111.03 112.75 112.95 112.73 111.22
R-2 6.00 111.22 8.30 111.22 2.40 5.00 11.00 17.00 19.30
R-3 9.00 111.22 116.48
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
114.92 116.48
49800 C 114.12 49800.00 114.42 0.00 2051.24 2035.64 15.60
L-1 3.95 113.42 6.00 114.22 112.42 112.42 113.42 114.12 113.02 112.52 112.52
L-2 6.50 112.42 8.70 112.42 0.00 3.00 5.55 9.50 13.31 15.50 18.00
L-3 9.50 112.42 116.48
R-1 3.81 113.02 6.00 114.20 112.42 114.22 114.42 114.20 112.52
R-2 6.00 112.52 8.60 112.52 0.80 3.50 9.50 15.50 18.10
R-3 8.50 112.52 116.48
114.92 112.98
49850 C 113.72 49850.00 114.02 0.00 2206.96 2193.33 13.63
L-1 4.00 112.96 6.00 113.82 111.92 111.92 112.96 113.72 113.22 112.36 112.36
L-2 5.95 111.92 8.90 111.92 0.00 3.50 5.45 9.45 13.40 15.57 19.45
L-3 9.45 111.92 116.48
R-1 3.95 113.22 6.00 113.80 111.92 113.82 114.02 113.80 112.36
R-2 6.12 112.36 8.20 112.36 0.55 3.45 9.45 15.45 17.65
R-3 10.00 112.36 116.48
114.78 116.48
49900 C 114.78 49900.00 115.08 0.00 2290.10 2279.70 10.41
L-1 3.98 114.43 6.00 114.88 113.54 113.54 114.43 114.78 114.44 113.28 113.28
L-2 6.00 113.54 8.10 113.54 0.00 3.00 5.02 9.00 13.00 15.10 20.00
L-3 9.00 113.54 116.48
R-1 4.00 114.44 6.00 114.86 113.54 114.88 115.08 114.86 113.28
R-2 6.10 113.28 8.40 113.28 0.90 3.00 9.00 15.00 17.40
R-3 11.00 113.28 116.48
116.54 116.48
49950 C 113.53 49950.00 113.83 0.00 2030.09 2019.02 11.07
L-1 4.00 113.04 6.00 113.63 111.86 111.86 113.04 113.53 113.24 112.34 112.34
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-2 6.12 111.86 8.70 111.86 0.00 2.28 4.40 8.40 12.26 14.72 17.90
L-3 8.40 111.86 116.48
R-1 3.86 113.24 6.00 113.61 111.86 113.63 113.83 113.61 112.34
R-2 6.32 112.34 8.00 112.34 -0.30 2.40 8.40 14.40 16.40
R-3 9.50 112.34 116.48
116.54 116.48
50000 C 114.79 50000.00 115.09 0.00 1961.40 1948.74 12.66
L-1 3.97 114.09 6.00 114.89 113.14 113.14 114.09 114.79 113.99 113.82 113.82
L-2 6.05 113.14 8.70 113.14 0.00 3.15 5.23 9.20 13.18 15.35 17.10
L-3 9.20 113.14 116.48
R-1 3.98 113.99 6.00 114.87 113.14 114.89 115.09 114.87 113.82
R-2 6.15 113.82 7.60 113.82 0.50 3.20 9.20 15.20 16.80
R-3 7.90 113.82 116.48
114.75 113.98
50050 C 116.49 50050.00 116.79 0.00 2208.85 2196.67 12.18
L-1 3.91 116.09 6.00 116.59 115.09 115.09 116.09 116.49 116.04 114.79 114.79
L-2 6.00 115.09 8.30 115.09 0.00 3.00 5.09 9.00 13.00 15.00 19.00
L-3 9.00 115.09 117.48
R-1 4.00 116.04 6.00 116.57 115.09 116.59 116.79 116.57 114.79
R-2 6.00 114.79 8.70 114.79 0.70 3.00 9.00 15.00 17.70
R-3 10.00 114.79 117.48
117.99 117.48
50100 C 116.23 50100.00 116.53 0.00 2295.87 2279.76 16.10
L-1 4.00 115.09 6.00 116.33 114.49 114.49 115.09 116.23 115.23 114.84 114.84
L-2 6.14 114.49 8.80 114.49 0.00 3.66 5.80 9.80 13.80 15.85 19.80
L-3 9.80 114.49 117.48
R-1 4.00 115.23 6.00 116.31 114.49 116.33 116.53 116.31 114.84
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-2 6.05 114.84 8.30 114.84 1.00 3.80 9.80 15.80 18.10
R-3 10.00 114.84 117.48
117.99 117.48
50150 C 116.54 50150.00 116.84 0.00 2278.98 2266.53 12.45
L-1 3.76 116.39 6.00 116.64 114.89 114.89 116.39 116.54 116.09 115.09 115.09
L-2 5.10 114.89 8.70 114.89 0.00 4.50 5.84 9.60 13.58 15.20 19.60
L-3 9.60 114.89 117.48
R-1 3.98 116.09 6.00 116.62 114.89 116.64 116.84 116.62 115.09
R-2 5.60 115.09 8.30 115.09 0.90 3.60 9.60 15.60 17.90
R-3 10.00 115.09 117.48
116.72 117.48
50200 C 115.35 50200.00 115.65 0.00 2301.25 2291.81 9.44
L-1 4.00 115.20 6.00 115.45 113.70 113.70 115.20 115.35 115.25 114.20 114.20
L-2 6.13 113.70 8.70 113.70 0.00 4.87 7.00 11.00 14.79 17.00 20.00
L-3 11.00 113.70 117.48
R-1 3.79 115.25 6.00 115.43 113.70 115.45 115.65 115.43 114.20
R-2 6.00 114.20 7.90 114.20 2.30 5.00 11.00 17.00 18.90
R-3 9.00 114.20 117.48
117.10 117.48
50250 C 115.86 50250.00 116.16 0.00 2650.81 2635.06 15.75
L-1 3.95 115.70 6.00 115.96 113.60 113.60 115.70 115.86 115.70 113.60 113.60
L-2 6.50 113.60 9.60 113.60 0.00 4.50 7.05 11.00 15.00 17.06 23.00
L-3 11.00 113.60 117.48
R-1 4.00 115.70 6.00 115.94 113.60 115.96 116.16 115.94 113.60
R-2 6.06 113.60 9.60 113.60 1.40 5.00 11.00 17.00 20.60
R-3 12.00 113.60 117.48
117.10 117.48
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
50300 C 114.35 50300.00 114.65 0.00 2049.29 2046.94 2.36
L-1 4.00 114.35 6.00 114.45 114.35 114.35 114.35 114.35 114.35 114.35 114.35
L-2 5.95 114.35 6.20 114.35 0.00 3.50 5.45 9.45 13.40 15.57 17.90
L-3 9.45 114.35 117.48
R-1 3.95 114.35 6.00 114.43 114.35 114.45 114.65 114.43 114.35
R-2 6.12 114.35 6.20 114.35 3.25 3.45 9.45 15.45 15.65
R-3 8.45 114.35 117.48
117.10 117.48
50350 C 115.39 50350.00 115.69 0.00 2301.44 2288.06 13.38
L-1 3.88 115.00 6.00 115.49 113.60 113.60 115.00 115.39 115.05 113.65 113.65
L-2 6.00 113.60 8.90 113.60 0.00 3.00 5.12 9.00 13.00 15.11 20.00
L-3 9.00 113.60 117.48
R-1 4.00 115.05 6.00 115.47 113.60 115.49 115.69 115.47 113.65
R-2 6.11 113.65 8.80 113.65 0.10 3.00 9.00 15.00 17.80
R-3 11.00 113.65 117.48
117.10 117.48
50400 C 116.32 50400.00 116.62 0.00 2319.64 2303.11 16.53
L-1 3.85 115.90 6.00 116.42 114.60 114.60 115.90 116.32 115.80 114.20 114.20
L-2 5.40 114.60 8.80 114.60 0.00 4.60 6.15 10.00 13.82 15.20 20.00
L-3 10.00 114.60 117.48
R-1 3.82 115.80 6.00 116.40 114.60 116.42 116.62 116.40 114.20
R-2 5.20 114.20 9.30 114.20 1.20 4.00 10.00 16.00 19.30
R-3 10.00 114.20 117.48
117.10 117.48
50450 C 116.20 50450.00 116.50 0.00 2409.40 2396.56 12.84
L-1 3.77 115.80 6.00 116.30 114.50 114.50 115.80 116.20 115.84 114.54 114.54
L-2 6.05 114.50 8.70 114.50 0.00 3.75 6.03 9.80 13.78 15.95 20.80
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-3 9.80 114.50 117.48
R-1 3.98 115.84 6.00 116.28 114.50 116.30 116.50 116.28 114.54
R-2 6.15 114.54 8.70 114.54 1.10 3.80 9.80 15.80 18.50
R-3 11.00 114.54 117.48
117.10 117.48
50500 C 115.71 50500.00 116.01 0.00 2297.27 2285.48 11.79
L-1 4.00 115.05 6.00 115.81 114.10 114.10 115.05 115.71 115.54 114.30 114.30
L-2 6.00 114.10 8.60 114.10 0.00 2.90 4.90 8.90 12.90 14.90 19.90
L-3 8.90 114.10 117.48
R-1 4.00 115.54 6.00 115.79 114.10 115.81 116.01 115.79 114.30
R-2 6.00 114.30 8.30 114.30 0.30 2.90 8.90 14.90 17.20
R-3 11.00 114.30 117.48
117.10 117.48
50550 C 115.94 50550.00 116.24 0.00 2255.46 2243.83 11.63
L-1 4.00 115.80 6.00 116.04 114.30 114.30 115.80 115.94 115.67 114.24 114.24
L-2 6.00 114.30 8.70 114.30 0.00 3.50 5.50 9.50 13.50 15.55 19.50
L-3 9.50 114.30 117.48
R-1 4.00 115.67 6.00 116.02 114.30 116.04 116.24 116.02 114.24
R-2 6.05 114.24 8.70 114.24 0.80 3.50 9.50 15.50 18.20
R-3 10.00 114.24 117.48
116.10 117.48
50600 C 114.94 50600.00 115.24 0.00 2350.41 2339.52 10.89
L-1 3.50 114.70 6.00 115.04 113.50 113.50 114.70 114.94 114.73 113.59 113.59
L-2 5.10 113.50 8.40 113.50 0.00 3.40 5.00 8.50 12.70 14.10 20.50
L-3 8.50 113.50 117.48
R-1 4.20 114.73 6.00 115.02 113.50 115.04 115.24 115.02 113.59
R-2 5.60 113.59 8.20 113.59 0.10 2.50 8.50 14.50 16.70
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-3 12.00 113.59 117.48
116.48 117.48
50650 C 115.32 50650.00 115.62 0.00 2302.03 2292.04 9.99
L-1 4.00 115.07 6.00 115.42 114.25 114.25 115.07 115.32 114.88 113.92 113.92
L-2 6.00 114.25 7.80 114.25 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 114.25 117.48
R-1 3.50 114.88 6.00 115.40 114.25 115.42 115.62 115.40 113.92
R-2 6.00 113.92 8.30 113.92 3.20 5.00 11.00 17.00 19.30
R-3 9.00 113.92 117.48
116.48 117.48
50700 C 115.10 50700.00 115.40 0.00 2069.73 2063.29 6.44
L-1 3.95 115.08 6.00 115.20 113.78 113.78 115.08 115.10 115.10 114.28 114.28
L-2 6.50 113.78 8.20 113.78 0.00 3.00 5.55 9.50 13.50 15.50 18.00
L-3 9.50 113.78 117.48
R-1 4.00 115.10 6.00 115.18 113.78 115.20 115.40 115.18 114.28
R-2 6.00 114.28 7.40 114.28 1.30 3.50 9.50 15.50 16.90
R-3 8.50 114.28 117.48
116.08 117.48
50750 C 115.40 50750.00 115.70 0.00 2063.56 2054.77 8.79
L-1 4.05 115.25 6.00 115.50 114.25 114.25 115.25 115.40 115.20 114.00 114.00
L-2 5.95 114.25 7.90 114.25 0.00 3.50 5.40 9.45 13.40 15.57 17.90
L-3 9.45 114.25 117.48
R-1 3.95 115.20 6.00 115.48 114.25 115.50 115.70 115.48 114.00
R-2 6.12 114.00 8.30 114.00 1.55 3.45 9.45 15.45 17.75
R-3 8.45 114.00 117.48
117.65 117.48
50800 C 116.45 50800.00 116.75 0.00 2081.90 2073.30 8.60
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-1 4.00 116.20 6.00 116.55 114.75 114.75 116.20 116.45 116.85 115.20 115.20
L-2 6.00 114.75 8.70 114.75 0.00 3.00 5.00 9.00 13.00 15.00 17.90
L-3 9.00 114.75 117.48
R-1 4.00 116.85 6.00 116.53 114.75 116.55 116.75 116.53 115.20
R-2 6.00 115.20 8.00 115.20 0.30 3.00 9.00 15.00 17.00
R-3 8.90 115.20 117.48
117.65 117.48
50850 C 116.49 50850.00 116.79 0.00 1933.30 1923.93 9.37
L-1 3.75 116.18 6.00 116.59 115.15 115.15 116.18 116.49 116.15 115.65 115.65
L-2 5.40 115.15 8.20 115.15 0.00 3.00 4.65 8.40 12.40 13.60 16.60
L-3 8.40 115.15 117.48
R-1 4.00 116.15 6.00 116.57 115.15 116.59 116.79 116.57 115.65
R-2 5.20 115.65 7.40 115.65 0.20 2.40 8.40 14.40 15.80
R-3 8.20 115.65 117.48
117.65 117.48
50900 C 116.27 50900.00 116.57 0.00 2204.96 2191.74 13.22
L-1 4.00 115.79 6.00 116.37 114.65 114.65 115.79 116.27 115.44 114.85 114.84
L-2 6.05 114.65 8.60 114.65 0.00 2.95 5.00 9.00 12.98 15.15 19.00
L-3 9.00 114.65 117.48
R-1 3.98 115.44 6.00 116.35 114.65 116.37 116.57 116.35 114.85
R-2 6.15 114.85 8.30 114.85 0.40 3.00 9.00 15.00 17.30
R-3 10.00 114.84 117.48
117.65 117.48
50950 C 116.08 50950.00 116.38 0.00 2317.38 2310.68 6.70
L-1 3.96 116.25 6.00 116.18 114.65 114.65 116.25 116.08 116.02 115.25 115.25
L-2 6.00 114.65 8.30 114.65 0.00 4.00 6.04 10.00 14.00 16.00 20.00
L-3 10.00 114.65 117.48
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-1 4.00 116.02 6.00 116.16 114.65 116.18 116.38 116.16 115.25
R-2 6.00 115.25 7.40 115.25 1.70 4.00 10.00 16.00 17.40
R-3 10.00 115.25 117.48
115.80 117.48
51000 C 116.15 51000.00 116.45 0.00 2316.31 2299.47 16.83
L-1 3.92 115.45 6.00 116.25 114.09 114.09 115.45 116.15 115.35 114.40 114.40
L-2 6.00 114.09 9.30 114.09 0.00 4.00 6.08 10.00 14.00 16.05 20.00
L-3 10.00 114.09 117.48
R-1 4.00 115.35 6.00 116.23 114.09 116.25 116.45 116.23 114.40
R-2 6.05 114.40 8.80 114.40 0.70 4.00 10.00 16.00 18.80
R-3 10.00 114.40 117.48
117.25 117.48
51050 C 116.03 51050.00 116.33 0.00 1973.96 1970.30 3.65
L-1 3.78 115.82 6.00 116.13 115.75 115.75 115.82 116.03 116.04 115.86 115.86
L-2 5.10 115.75 6.60 115.75 0.00 3.40 4.72 8.50 12.50 14.10 17.00
L-3 8.50 115.75 117.48
R-1 4.00 116.04 6.00 116.11 115.75 116.13 116.33 116.11 115.86
R-2 5.60 115.86 6.40 115.86 1.90 2.50 8.50 14.50 14.90
R-3 8.50 115.86 117.48
117.25 117.48
51100 C 115.91 51100.00 115.91 0.00 1866.22 1866.22 0.00
L-1 4.00 115.91 6.00 115.91 115.91 115.91 115.91 115.91 115.91 115.91 115.91
L-2 6.00 115.91 6.00 115.91 0.00 1.58 3.58 7.58 11.58 14.08 16.10
L-3 7.58 115.91 117.48
R-1 4.00 115.91 6.00 115.91 115.91 115.91 115.91 115.91 115.91
R-2 6.50 115.91 6.00 115.91 1.58 1.58 7.58 13.58 13.58
R-3 8.52 115.91 115.91
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
117.25 117.48
51150 C 115.78 51150.00 115.78 0.00 1935.91 1935.91 0.00
L-1 3.85 115.78 6.00 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78
L-2 6.00 115.78 6.00 115.78 0.00 3.20 5.35 9.20 13.20 15.20 16.72
L-3 9.20 115.78 117.48
R-1 4.00 115.78 6.00 115.78 115.78 115.78 115.78 115.78 115.78
R-2 6.00 115.78 6.00 115.78 3.20 3.20 9.20 15.20 15.20
R-3 7.52 115.78 115.78
117.25 117.48
51200 C 117.01 51200.00 117.01 0.00 2094.55 2094.55 0.00
L-1 4.00 117.01 6.00 117.01 117.01 117.01 117.01 117.01 117.01 117.01 117.01
L-2 6.12 117.01 6.00 117.01 0.00 3.33 5.45 9.45 13.40 15.57 17.90
L-3 9.45 117.01 117.48
R-1 3.95 117.01 6.00 117.01 117.01 117.01 117.01 117.01 117.01
R-2 6.12 117.01 6.00 117.01 3.45 3.45 9.45 15.45 15.45
R-3 8.45 117.01 117.01
117.25 117.48
51250 C 116.08 51250.00 116.08 0.00 1961.82 1961.82 0.00
L-1 3.98 116.08 6.00 116.08 116.08 116.08 116.08 116.08 116.08 116.08 116.08
L-2 6.00 116.08 6.00 116.08 0.00 3.00 5.02 9.00 13.00 15.00 16.90
L-3 9.00 116.08 117.48
R-1 4.00 116.08 6.00 116.08 116.08 116.08 116.08 116.08 116.08
R-2 6.00 116.08 6.00 116.08 3.00 3.00 9.00 15.00 15.00
R-3 7.90 116.08 116.08
117.25 117.48
51300 C 115.67 51300.00 115.67 0.00 2061.31 2061.31 0.00
L-1 4.00 115.67 6.00 115.67 115.67 115.67 115.67 115.67 115.67 115.67 115.67
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-2 5.40 115.67 6.00 115.67 0.00 4.22 5.62 9.62 13.38 15.26 17.82
L-3 9.62 115.67 117.48
R-1 3.76 115.67 6.00 115.67 115.67 115.67 115.67 115.67 115.67
R-2 5.64 115.67 6.00 115.67 3.62 3.62 9.62 15.62 15.62
R-3 8.20 115.67 115.67
117.25 117.48
51350 C 115.76 51350.00 115.76 0.00 1782.77 1782.77 0.00
L-1 4.00 115.76 6.00 115.76 115.76 115.76 115.76 115.76 115.76 115.76 115.76
L-2 6.05 115.76 6.00 115.76 0.00 1.45 3.50 7.50 11.48 13.65 15.40
L-3 7.50 115.76 117.48
R-1 3.98 115.76 6.00 115.76 115.76 115.76 115.76 115.76 115.76
R-2 6.15 115.76 6.00 115.76 1.50 1.50 7.50 13.50 13.50
R-3 7.90 115.76 115.76
117.25 117.48
51400 C 115.93 51400.00 115.93 0.00 1773.79 1773.79 0.00
L-1 3.90 115.93 6.00 115.93 115.93 115.93 115.93 115.93 115.93 115.93 115.93
L-2 6.00 115.93 6.00 115.93 0.00 1.50 3.60 7.50 11.50 13.50 15.30
L-3 7.50 115.93 117.48
R-1 4.00 115.93 6.00 115.93 115.93 115.93 115.93 115.93 115.93
R-2 6.00 115.93 6.00 115.93 1.50 1.50 7.50 13.50 13.50
R-3 7.80 115.93 115.93
117.25 117.48
51450 C 115.90 51450.00 115.90 0.00 1927.48 1927.48 0.00
L-1 4.00 115.90 6.00 115.90 115.90 115.90 115.90 115.90 115.90 115.90 115.90
L-2 6.00 115.90 6.00 115.90 0.00 2.63 4.63 8.63 12.63 14.68 16.63
L-3 8.63 115.90 117.48
R-1 4.00 115.90 6.00 115.90 115.90 115.90 115.90 115.90 115.90
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-2 6.05 115.90 6.00 115.90 2.63 2.63 8.63 14.63 14.63
R-3 8.00 115.90 115.90
117.25 117.48
51500 C 115.67 51500.00 115.97 0.00 1965.44 1957.29 8.15
L-1 4.00 115.65 6.00 115.77 114.65 114.65 115.65 115.67 115.55 114.35 114.35
L-2 5.10 114.65 7.70 114.65 0.00 3.40 4.50 8.50 12.70 14.10 17.00
L-3 8.50 114.65 117.48
R-1 4.20 115.55 6.00 115.75 114.65 115.77 115.97 115.75 114.35
R-2 5.60 114.35 8.20 114.35 0.80 2.50 8.50 14.50 16.70
R-3 8.50 114.35 117.48
117.25 117.48
51550 C 115.93 51550.00 116.23 0.00 2134.76 2120.17 14.58
L-1 4.00 115.31 6.00 116.03 114.65 114.65 115.31 115.93 115.40 113.75 113.75
L-2 6.00 114.65 8.10 114.65 0.00 2.45 4.45 8.45 12.41 14.45 18.45
L-3 8.45 114.65 117.48
R-1 3.96 115.40 6.00 116.01 114.65 116.03 116.23 116.01 113.75
R-2 6.00 113.75 9.40 113.75 0.35 2.45 8.45 14.45 17.85
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-3 10.00 113.75 117.48
114.74 117.48
51600 C 114.18 51600.00 114.48 0.00 1770.76 1763.66 7.09
L-1 4.00 113.94 6.00 114.28 113.52 113.52 113.94 114.18 114.00 113.00 113.00
L-2 6.00 113.52 7.20 113.52 0.00 2.00 4.00 8.00 12.00 14.00 15.50
L-3 8.00 113.52 117.48
R-1 4.00 114.00 6.00 114.26 113.52 114.28 114.48 114.26 113.00
R-2 6.00 113.00 7.90 113.00 0.80 2.00 8.00 14.00 15.90
R-3 7.50 113.00 117.48
115.50 117.48
51650 C 114.18 51650.00 114.48 0.00 2235.73 2224.17 11.57
L-1 3.95 114.06 6.00 114.28 112.50 112.50 114.06 114.18 113.80 112.50 112.50
L-2 6.50 112.50 8.70 112.50 0.00 3.13 5.68 9.63 13.63 15.73 19.63
L-3 9.63 112.50 117.48
R-1 4.00 113.80 6.00 114.26 112.50 114.28 114.48 114.26 112.50
R-2 6.10 112.50 8.70 112.50 0.93 3.63 9.63 15.63 18.33
R-3 10.00 112.50 117.48
115.50 117.48
51700 C 113.97 51700.00 114.27 0.00 2405.51 2385.99 19.52
L-1 3.98 113.75 6.00 114.07 111.50 111.50 113.75 113.97 113.79 111.25 111.25
L-2 6.00 111.50 9.90 111.50 0.00 4.20 6.22 10.20 14.20 16.30 21.20
L-3 10.20 111.50 117.48
R-1 4.00 113.79 6.00 114.05 111.50 114.07 114.27 114.05 111.25
R-2 6.10 111.25 10.20 111.25 0.30 4.20 10.20 16.20 20.40
R-3 11.00 111.25 117.48
113.95 117.48
51750 C 113.95 51750.00 114.25 0.00 1994.84 1984.83 10.01
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-1 4.00 113.61 6.00 114.05 112.91 112.91 113.61 113.95 113.41 112.51 112.51
L-2 6.00 112.91 7.80 112.91 0.00 3.00 5.00 9.00 13.00 15.50 17.52
L-3 9.00 112.91 117.48
R-1 4.00 113.41 6.00 114.03 112.91 114.05 114.25 114.03 112.51
R-2 6.50 112.51 8.30 112.51 1.20 3.00 9.00 15.00 17.30
R-3 8.52 112.51 117.48
116.51 117.48
51800 C 114.91 51800.00 115.21 0.00 2065.82 2056.72 9.11
L-1 3.92 114.56 6.00 115.01 113.95 113.95 114.56 114.91 114.63 113.51 113.51
L-2 6.24 113.95 7.60 113.95 0.00 1.76 4.08 8.00 12.00 14.00 18.00
L-3 8.00 113.95 117.48
R-1 4.00 114.63 6.00 114.99 113.95 115.01 115.21 114.99 113.51
R-2 6.00 113.51 8.30 113.51 0.40 2.00 8.00 14.00 16.30
R-3 10.00 113.51 117.48
116.51 117.48
51850 C 115.24 51850.00 115.54 0.00 2080.40 2069.69 10.71
L-1 3.99 115.15 6.00 115.34 113.25 113.25 115.15 115.24 115.06 113.95 113.95
L-2 6.25 113.25 9.20 113.25 0.00 3.31 5.57 9.56 13.56 16.06 18.08
L-3 9.56 113.25 117.48
R-1 4.00 115.06 6.00 115.32 113.25 115.34 115.54 115.32 113.95
R-2 6.50 113.95 8.10 113.95 0.36 3.56 9.56 15.56 17.66
R-3 8.52 113.95 117.48
115.34 117.48
51900 C 115.34 51900.00 115.64 0.00 2073.48 2063.88 9.60
L-1 3.98 115.05 6.00 115.44 114.00 114.00 115.05 115.34 115.20 113.92 113.92
L-2 6.21 114.00 8.20 114.00 0.00 1.79 4.02 8.00 12.00 14.00 18.00
L-3 8.00 114.00 117.48
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-1 4.00 115.20 6.00 115.42 114.00 115.44 115.64 115.42 113.92
R-2 6.00 113.92 8.30 113.92 -0.20 2.00 8.00 14.00 16.30
R-3 10.00 113.92 117.48
115.90 117.48
51950 C 114.77 51950.00 115.07 0.00 2176.35 2164.43 11.93
L-1 3.99 114.30 6.00 114.87 113.34 113.34 114.30 114.77 114.29 113.22 113.22
L-2 6.10 113.34 8.30 113.34 0.00 2.90 5.01 9.00 13.00 15.00 19.00
L-3 9.00 113.34 117.48
R-1 4.00 114.29 6.00 114.85 113.34 114.87 115.07 114.85 113.22
R-2 6.00 113.22 8.50 113.22 0.70 3.00 9.00 15.00 17.50
R-3 10.00 113.22 117.48
115.90 117.48
52000 C 114.00 52000.00 114.30 0.00 2049.13 2038.75 10.37
L-1 3.95 113.92 6.00 114.10 112.40 112.40 113.92 114.00 113.90 112.30 112.30
L-2 6.50 112.40 8.60 112.40 0.00 2.50 5.05 9.00 13.00 15.10 18.00
L-3 9.00 112.40 117.48
R-1 4.00 113.90 6.00 114.08 112.40 114.10 114.30 114.08 112.30
R-2 6.10 112.30 8.70 112.30 0.40 3.00 9.00 15.00 17.70
R-3 9.00 112.30 117.48
115.90 117.48
52050 C 113.51 52050.00 113.81 0.00 2289.24 2275.63 13.61
L-1 4.00 113.25 6.00 113.61 111.64 111.64 113.25 113.51 113.00 111.65 111.65
L-2 6.65 111.64 9.00 111.64 0.00 3.58 6.23 10.23 14.19 16.45 20.23
L-3 10.23 111.64 117.48
R-1 3.96 113.00 6.00 113.59 111.64 113.61 113.81 113.59 111.65
R-2 6.22 111.65 9.00 111.65 1.23 4.23 10.23 16.23 19.23
R-3 10.00 111.65 117.48
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
115.90 117.48
52100 C 114.79 52100.00 115.09 0.00 2514.62 2500.48 14.14
L-1 3.88 114.43 6.00 114.89 112.65 112.65 114.43 114.79 114.40 113.01 113.01
L-2 6.63 112.65 9.40 112.65 0.00 4.37 7.12 11.00 15.00 17.50 22.00
L-3 11.00 112.65 117.48
R-1 4.00 114.40 6.00 114.87 112.65 114.89 115.09 114.87 113.01
R-2 6.50 113.01 8.80 113.01 1.60 5.00 11.00 17.00 19.80
R-3 11.00 113.01 117.48
115.90 117.48
52150 C 114.68 52150.00 114.98 0.00 2511.88 2493.64 18.23
L-1 3.87 113.85 6.00 114.78 112.78 112.78 113.85 114.68 113.95 112.48 112.48
L-2 6.00 112.78 9.00 112.78 0.00 5.00 7.13 11.00 15.00 17.00 22.00
L-3 11.00 112.78 117.48
R-1 4.00 113.95 6.00 114.76 112.78 114.78 114.98 114.76 112.48
R-2 6.00 112.48 9.50 112.48 2.00 5.00 11.00 17.00 20.50
R-3 11.00 112.48 117.48
115.90 117.48
52200 C 114.51 52200.00 114.81 0.00 2507.82 2490.66 17.15
L-1 4.00 114.30 6.00 114.61 112.74 112.74 114.30 114.51 114.20 111.75 111.75
L-2 6.12 112.74 8.90 112.74 0.00 4.88 7.00 11.00 15.00 17.00 22.00
L-3 11.00 112.74 117.48
R-1 4.00 114.20 6.00 114.59 112.74 114.61 114.81 114.59 111.75
R-2 6.00 111.75 10.30 111.75 2.10 5.00 11.00 17.00 21.30
R-3 11.00 111.75 117.48
115.90 117.48
52250 C 114.25 52250.00 114.55 0.00 2278.04 2259.61 18.42
L-1 3.83 114.19 6.00 114.35 112.44 112.44 114.19 114.25 113.70 111.34 111.34
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-2 6.10 112.44 8.90 112.44 0.00 3.90 6.17 10.00 13.94 16.10 20.00
L-3 10.00 112.44 117.48
R-1 3.94 113.70 6.00 114.33 112.44 114.35 114.55 114.33 111.34
R-2 6.10 111.34 10.50 111.34 1.10 4.00 10.00 16.00 20.50
R-3 10.00 111.34 117.48
115.90 117.48
52300 C 114.44 52300.00 114.74 0.00 2506.46 2490.12 16.34
L-1 3.97 114.30 6.00 114.54 112.64 112.64 114.30 114.44 113.87 111.92 111.92
L-2 6.16 112.64 8.90 112.64 0.00 4.84 7.03 11.00 14.99 17.32 22.00
L-3 11.00 112.64 117.48
R-1 3.99 113.87 6.00 114.52 112.64 114.54 114.74 114.52 111.92
R-2 6.32 111.92 10.00 111.92 2.10 5.00 11.00 17.00 21.00
R-3 11.00 111.92 117.48
115.90 117.48
52350 C 114.55 52350.00 114.85 0.00 2729.96 2706.39 23.57
L-1 3.95 114.39 6.00 114.65 111.34 111.34 114.39 114.55 114.39 111.65 111.65
L-2 6.50 111.34 11.00 111.34 0.00 5.50 8.05 12.00 16.00 18.10 24.00
L-3 12.00 111.34 117.48
R-1 4.00 114.39 6.00 114.63 111.34 114.65 114.85 114.63 111.65
R-2 6.10 111.65 10.50 111.65 1.00 6.00 12.00 18.00 22.50
R-3 12.00 111.65 117.48
115.90 117.48
52400 C 114.80 52400.00 115.10 0.00 3403.59 3373.57 30.01
L-1 3.86 114.63 6.00 114.90 110.92 110.92 114.63 114.80 114.50 111.78 111.78
L-2 6.00 110.92 12.00 110.92 0.00 9.00 11.14 15.00 19.00 21.10 30.00
L-3 15.00 110.92 117.48
R-1 4.00 114.50 6.00 114.88 110.92 114.90 115.10 114.88 111.78
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-2 6.10 111.78 10.70 111.78 3.00 9.00 15.00 21.00 25.70
R-3 15.00 111.78 117.48
115.90 117.48
52450 C 115.62 52450.00 115.92 0.00 2530.57 2505.89 24.68
L-1 4.00 115.45 6.00 115.72 112.64 112.64 115.45 115.62 115.40 112.34 112.34
L-2 6.00 112.64 10.70 112.64 0.00 5.00 7.00 11.00 14.94 17.65 22.00
L-3 11.00 112.64 117.48
R-1 3.94 115.40 6.00 115.70 112.64 115.72 115.92 115.70 112.34
R-2 6.65 112.34 11.10 112.34 0.30 5.00 11.00 17.00 22.10
R-3 11.00 112.34 117.48
115.90 117.48
52500 C 115.08 52500.00 115.38 0.00 2744.98 2726.11 18.87
L-1 3.89 114.80 6.00 115.18 112.90 112.90 114.80 115.08 114.70 112.40 112.40
L-2 6.10 112.90 9.50 112.90 0.00 5.90 8.11 12.00 15.96 18.15 24.00
L-3 12.00 112.90 117.48
R-1 3.96 114.70 6.00 115.16 112.90 115.18 115.38 115.16 112.40
R-2 6.15 112.40 10.20 112.40 2.50 6.00 12.00 18.00 22.20
R-3 12.00 112.40 117.48
115.90 117.48
52550 C 114.02 52550.00 114.32 0.00 2085.48 2069.03 16.45
L-1 4.00 113.95 6.00 114.12 111.64 111.64 113.95 114.02 113.98 111.64 111.64
L-2 6.12 111.64 9.80 111.64 0.00 4.68 6.80 10.80 14.77 16.92 18.32
L-3 10.80 111.64 117.48
R-1 3.97 113.98 6.00 114.10 111.64 114.12 114.32 114.10 111.64
R-2 6.12 111.64 9.70 111.64 1.00 4.80 10.80 16.80 20.50
R-3 7.52 111.64 117.48
115.90 117.48
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
52600 C 113.79 52600.00 114.09 0.00 2513.52 2496.15 17.37
L-1 3.93 113.65 6.00 113.89 111.50 111.50 113.65 113.79 113.55 111.30 111.30
L-2 6.16 111.50 9.60 111.50 0.00 5.04 7.27 11.20 15.20 17.30 22.20
L-3 11.20 111.50 117.48
R-1 4.00 113.55 6.00 113.87 111.50 113.89 114.09 113.87 111.30
R-2 6.10 111.30 9.90 111.30 1.60 5.20 11.20 17.20 21.10
R-3 11.00 111.30 117.48
115.90 117.48
52650 C 114.48 52650.00 114.78 0.00 2394.75 2378.48 16.27
L-1 4.00 114.34 6.00 114.58 112.15 112.15 114.34 114.48 114.27 112.34 112.34
L-2 6.00 112.15 9.70 112.15 0.00 4.00 6.00 10.00 13.87 16.00 21.00
L-3 10.00 112.15 117.48
R-1 3.87 114.27 6.00 114.56 112.15 114.58 114.78 114.56 112.34
R-2 6.00 112.34 9.40 112.34 0.30 4.00 10.00 16.00 19.40
R-3 11.00 112.34 117.48
115.90 114.98
52700 C 114.80 52700.00 115.10 0.00 2063.62 2053.19 10.44
L-1 3.95 114.64 6.00 114.90 113.34 113.34 114.64 114.80 114.61 113.11 113.11
L-2 6.50 113.34 8.40 113.34 0.00 2.50 5.05 9.00 13.00 15.10 18.00
L-3 9.00 113.34 117.48
R-1 4.00 114.61 6.00 114.88 113.34 114.90 115.10 114.88 113.11
R-2 6.10 113.11 8.70 113.11 0.60 3.00 9.00 15.00 17.70
R-3 9.00 113.11 117.48
115.90 117.48
52750 C 115.07 52750.00 115.37 0.00 2519.66 2501.49 18.17
L-1 3.91 114.65 6.00 115.17 112.78 112.78 114.65 115.07 114.61 112.75 112.75
L-2 6.18 112.78 9.60 112.78 0.00 4.82 7.09 11.00 15.00 17.10 22.00
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-3 11.00 112.78 117.48
R-1 4.00 114.61 6.00 115.15 112.78 115.17 115.37 115.15 112.75
R-2 6.10 112.75 9.70 112.75 1.40 5.00 11.00 17.00 20.70
R-3 11.00 112.75 117.48
115.90 117.48
52800 C 113.58 52800.00 113.88 0.00 2215.79 2200.80 15.00
L-1 3.87 112.93 6.00 113.68 111.90 111.90 112.93 113.58 113.01 111.58 111.58
L-2 6.32 111.90 8.70 111.90 0.00 3.24 5.69 9.56 13.56 16.06 19.56
L-3 9.56 111.90 117.48
R-1 4.00 113.01 6.00 113.66 111.90 113.68 113.88 113.66 111.58
R-2 6.50 111.58 9.20 111.58 0.86 3.56 9.56 15.56 18.76
R-3 10.00 111.58 117.48
115.90 117.48
52850 C 114.58 52850.00 114.88 0.00 2355.72 2341.39 14.32
L-1 3.92 114.34 6.00 114.68 112.40 112.40 114.34 114.58 114.44 112.64 112.64
L-2 6.50 112.40 9.50 112.40 0.00 3.13 5.71 9.63 13.63 15.63 20.63
L-3 9.63 112.40 117.48
R-1 4.00 114.44 6.00 114.66 112.40 114.68 114.88 114.66 112.64
R-2 6.00 112.64 9.10 112.64 0.13 3.63 9.63 15.63 18.73
R-3 11.00 112.64 117.48
115.90 117.48
52900 C 114.72 52900.00 115.02 0.00 2270.29 2254.36 15.93
L-1 3.75 114.48 6.00 114.82 112.57 112.57 114.48 114.72 114.65 112.44 112.44
L-2 6.12 112.57 9.40 112.57 0.00 3.73 6.10 9.85 13.85 15.85 19.85
L-3 9.85 112.57 117.48
R-1 4.00 114.65 6.00 114.80 112.57 114.82 115.02 114.80 112.44
R-2 6.00 112.44 9.60 112.44 0.45 3.85 9.85 15.85 19.45
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-3 10.00 112.44 117.48
115.90 117.48
52950 C 114.31 52950.00 114.61 0.00 2641.90 2627.30 14.60
L-1 3.96 114.25 6.00 114.41 111.90 111.90 114.25 114.31 114.15 112.50 112.50
L-2 6.10 111.90 9.80 111.90 0.00 5.13 7.27 11.23 15.21 17.33 23.23
L-3 11.23 111.90 117.48
R-1 3.98 114.15 6.00 114.39 111.90 114.41 114.61 114.39 112.50
R-2 6.10 112.50 8.90 112.50 1.43 5.23 11.23 17.23 20.13
R-3 12.00 112.50 117.48
115.90 117.48
53000 C 115.08 53000.00 115.38 0.00 2253.01 2239.81 13.20
L-1 3.79 114.92 6.00 115.18 113.36 113.36 114.92 115.08 114.90 113.01 113.01
L-2 6.32 113.36 8.80 113.36 0.00 3.31 5.84 9.63 13.61 15.63 19.63
L-3 9.63 113.36 117.48
R-1 3.98 114.90 6.00 115.16 113.36 115.18 115.38 115.16 113.01
R-2 6.00 113.01 9.30 113.01 0.83 3.63 9.63 15.63 18.93
R-3 10.00 113.01 117.48
115.90 117.48
53050 C 114.30 53050.00 114.60 0.00 2122.43 2111.78 10.65
L-1 3.95 113.95 6.00 114.40 112.75 112.75 113.95 114.30 113.90 113.00 113.00
L-2 6.50 112.75 8.50 112.75 0.00 3.10 5.65 9.60 13.60 15.70 18.60
L-3 9.60 112.75 117.48
R-1 4.00 113.90 6.00 114.38 112.75 114.40 114.60 114.38 113.00
R-2 6.10 113.00 8.10 113.00 1.10 3.60 9.60 15.60 17.70
R-3 9.00 113.00 117.48
115.90 117.48
53100 C 115.00 53100.00 115.30 0.00 2592.83 2577.74 15.09
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-1 4.00 114.69 6.00 115.10 112.50 112.50 114.69 115.00 114.95 113.30 113.30
L-2 6.00 112.50 9.90 112.50 0.00 4.65 6.65 10.65 14.56 16.75 22.65
L-3 10.65 112.50 117.48
R-1 3.91 114.95 6.00 115.08 112.50 115.10 115.30 115.08 113.30
R-2 6.10 113.30 8.70 113.30 0.75 4.65 10.65 16.65 19.35
R-3 12.00 113.30 117.48
113.40 117.48
53150 C 113.54 53150.00 113.84 0.00 2515.95 2503.72 12.23
L-1 3.98 113.48 6.00 113.64 111.50 111.50 113.48 113.54 113.34 111.90 111.90
L-2 6.00 111.50 9.30 111.50 0.00 4.25 6.27 10.25 14.25 16.75 22.25
L-3 10.25 111.50 117.48
R-1 4.00 113.34 6.00 113.62 111.50 113.64 113.84 113.62 111.90
R-2 6.50 111.90 8.60 111.90 0.95 4.25 10.25 16.25 18.85
R-3 12.00 111.90 117.48
114.90 117.48
53200 C 113.32 53200.00 113.62 0.00 2214.69 2207.50 7.19
L-1 3.95 112.97 6.00 113.42 112.00 112.00 112.97 113.32 113.02 112.00 114.90
L-2 6.65 112.00 8.20 112.00 0.00 2.91 5.61 9.56 13.46 16.16 19.56
L-3 9.56 112.00 117.48
R-1 3.90 113.02 6.00 113.40 112.00 113.42 113.62 113.40 112.00
R-2 6.60 112.00 8.20 112.00 1.36 3.56 9.56 15.56 17.76
R-3 10.00 114.90 117.48
113.94 117.48
53250 C 113.94 53250.00 114.24 0.00 2237.75 2227.99 9.76
L-1 3.96 113.86 6.00 114.04 112.46 112.46 113.86 113.94 113.76 112.63 112.63
L-2 6.12 112.46 8.40 112.46 0.00 3.56 5.72 9.68 13.33 15.68 19.68
L-3 9.68 112.46 117.48
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-1 3.65 113.76 6.00 114.02 112.46 114.04 114.24 114.02 112.93
R-2 6.00 112.63 7.70 112.93 1.28 3.68 9.68 15.68 17.38
R-3 10.00 112.63 117.48
118.06 117.48
53300 C 115.30 53300.00 115.60 0.00 2748.85 2729.70 19.15
L-1 3.85 115.24 6.00 115.40 112.50 112.50 115.24 115.30 115.17 112.60 112.60
L-2 6.65 112.50 10.40 112.50 0.00 5.35 8.15 12.00 15.99 18.63 24.00
L-3 12.00 112.50 117.48
R-1 3.99 115.17 6.00 115.38 112.50 115.40 115.60 115.38 112.60
R-2 6.63 112.60 10.20 112.60 1.60 6.00 12.00 18.00 22.20
R-3 12.00 112.60 117.48
118.06 117.48
53350 C 117.05 53350.00 117.35 0.00 2791.86 2772.59 19.27
L-1 3.98 116.53 6.00 117.15 114.53 114.53 116.53 117.05 116.66 114.60 114.60
L-2 6.84 114.53 10.00 114.53 0.00 5.16 8.02 12.00 16.00 18.00 24.00
L-3 12.00 114.53 117.48
R-1 4.00 116.66 6.00 117.13 114.53 117.15 117.35 117.13 114.60
R-2 6.00 114.60 9.80 114.60 2.00 6.00 12.00 18.00 21.80
R-3 12.00 114.60 117.48
118.06 117.48
53400 C 116.76 53400.00 117.06 0.00 2176.74 2163.60 13.14
L-1 3.95 116.49 6.00 116.86 114.61 114.61 116.49 116.76 116.58 115.08 115.08
L-2 6.50 114.61 9.40 114.61 0.00 3.18 5.73 9.68 13.59 16.00 18.68
L-3 9.68 114.61 117.48
R-1 3.91 116.58 6.00 116.84 114.61 116.86 117.06 116.84 115.08
R-2 6.32 115.08 8.70 115.08 0.28 3.68 9.68 15.68 18.38
R-3 9.00 115.08 117.48
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
118.06 117.48
53450 C 116.10 53450.00 116.40 0.00 2036.35 2026.14 10.21
L-1 3.92 115.98 6.00 116.20 114.61 114.61 115.98 116.10 116.06 114.38 114.38
L-2 6.33 114.61 8.40 114.61 0.00 1.23 3.64 7.56 11.56 13.66 17.56
L-3 7.56 114.61 117.48
R-1 4.00 116.06 6.00 116.18 114.61 116.20 116.40 116.18 114.38
R-2 6.10 114.38 8.80 114.38 -0.84 1.56 7.56 13.56 16.36
R-3 10.00 114.38 117.48
115.17 117.48
53500 C 115.17 53500.00 115.47 0.00 2280.55 2266.73 13.82
L-1 3.98 115.13 6.00 115.27 113.12 113.12 115.13 115.17 114.88 113.08 113.08
L-2 6.35 113.12 9.30 113.12 0.00 3.51 5.88 9.86 13.86 16.36 19.86
L-3 9.86 113.12 117.48
R-1 4.00 114.88 6.00 115.25 113.12 115.27 115.47 115.25 113.08
R-2 6.50 113.08 9.30 113.08 0.56 3.86 9.86 15.86 19.16
R-3 10.00 113.08 117.48
115.68 117.48
53550 C 114.67 53550.00 114.97 0.00 2471.88 2455.72 16.16
L-1 3.90 114.38 6.00 114.77 112.56 112.56 114.38 114.67 114.21 112.47 112.47
L-2 6.65 112.56 9.40 112.56 0.00 3.00 5.75 9.65 13.65 15.65 21.65
L-3 9.65 112.56 117.48
R-1 4.00 114.21 6.00 114.75 112.56 114.77 114.97 114.75 112.47
R-2 6.00 112.47 9.50 112.47 0.25 3.65 9.65 15.65 19.15
R-3 12.00 112.47 117.48
115.68 117.48
53600 C 114.39 53600.00 114.69 0.00 2280.61 2264.19 16.42
L-1 3.76 114.08 6.00 114.49 112.32 112.32 114.08 114.39 114.00 111.98 111.98
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-2 6.84 112.32 9.30 112.32 0.00 3.16 6.24 10.00 13.98 16.34 20.00
L-3 10.00 112.32 117.48
R-1 3.98 114.00 6.00 114.47 112.32 114.49 114.69 114.47 111.98
R-2 6.34 111.98 9.80 111.98 0.70 4.00 10.00 16.00 19.80
R-3 10.00 111.98 117.48
115.18 117.48
53650 C 115.28 53650.00 115.58 0.00 2789.39 2776.92 12.47
L-1 3.86 115.13 6.00 115.38 113.58 113.58 115.13 115.28 115.03 113.40 113.40
L-2 6.10 113.58 8.70 113.58 0.00 6.22 8.46 12.32 16.30 18.42 24.32
L-3 12.32 113.58 117.48
R-1 3.98 115.03 6.00 115.36 113.58 115.38 115.58 115.36 113.40
R-2 6.10 113.40 9.00 113.40 3.62 6.32 12.32 18.32 21.32
R-3 12.00 113.40 117.48
116.38 117.48
53700 C 115.01 53700.00 115.31 0.00 2745.87 2730.87 15.01
L-1 3.90 114.49 6.00 115.11 113.26 113.26 114.49 115.01 114.58 112.96 112.96
L-2 5.98 113.26 8.80 113.26 0.00 6.02 8.10 12.00 16.00 18.10 24.00
L-3 12.00 113.26 117.48
R-1 4.00 114.58 6.00 115.09 113.26 115.11 115.31 115.09 112.96
R-2 6.10 112.96 9.20 112.96 3.20 6.00 12.00 18.00 21.20
R-3 12.00 112.96 117.48
116.38 117.48
53750 C 115.06 53750.00 115.36 0.00 2051.02 2040.66 10.36
L-1 3.95 115.04 6.00 115.16 113.48 113.48 115.04 115.06 115.03 113.26 113.26
L-2 6.50 113.48 8.60 113.48 0.00 1.35 3.90 7.85 11.83 13.95 17.85
L-3 7.85 113.48 117.48
R-1 3.98 115.03 6.00 115.14 113.48 115.16 115.36 115.14 113.26
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-2 6.10 113.26 8.90 113.26 -0.75 1.85 7.85 13.85 16.75
R-3 10.00 113.26 117.48
116.38 117.48
53800 C 114.65 53800.00 114.95 0.00 2399.17 2387.64 11.52
L-1 3.98 114.48 6.00 114.75 112.93 112.93 114.48 114.65 114.58 112.78 112.78
L-2 6.68 112.93 8.80 112.93 0.00 2.32 5.02 9.00 13.00 15.10 21.00
L-3 9.00 112.93 117.48
R-1 4.00 114.58 6.00 114.73 112.93 114.75 114.95 114.73 112.78
R-2 6.10 112.78 9.00 112.78 0.20 3.00 9.00 15.00 18.00
R-3 12.00 112.78 117.48
116.38 117.48
53850 C 114.70 53850.00 115.00 0.00 2537.14 2521.65 15.49
L-1 4.00 114.48 6.00 114.80 112.73 112.73 114.48 114.70 114.48 112.18 112.18
L-2 6.53 112.73 9.20 112.73 0.00 3.70 6.23 10.23 14.23 16.73 22.23
L-3 10.23 112.73 117.48
R-1 4.00 114.48 6.00 114.78 112.73 114.80 115.00 114.78 112.18
R-2 6.50 112.18 9.90 112.18 1.03 4.23 10.23 16.23 20.13
R-3 12.00 112.18 117.48
116.38 117.48
53900 C 113.58 53900.00 113.88 0.00 2327.33 2312.28 15.06
L-1 3.95 112.78 6.00 113.68 111.68 111.68 112.78 113.58 113.38 111.68 111.68
L-2 6.00 111.68 9.00 111.68 0.00 4.56 6.61 10.56 14.56 16.68 20.56
L-3 10.56 111.68 117.48
R-1 4.00 113.38 6.00 113.66 111.68 113.68 113.88 113.66 111.68
R-2 6.12 111.68 9.00 111.68 1.56 4.56 10.56 16.56 19.56
R-3 10.00 111.68 117.48
116.38 117.48
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
53950 C 115.02 53950.00 115.32 0.00 2816.51 2798.84 17.66
L-1 3.92 114.96 6.00 115.12 112.48 112.48 114.96 115.02 114.85 112.68 112.68
L-2 6.12 112.48 10.00 112.48 0.00 6.53 8.73 12.65 16.65 18.61 24.65
L-3 12.65 112.48 117.48
R-1 4.00 114.85 6.00 115.10 112.48 115.12 115.32 115.10 112.68
R-2 5.96 112.68 9.70 112.68 2.65 6.65 12.65 18.65 22.35
R-3 12.00 112.68 117.48
116.38 117.48
54000 C 115.12 54000.00 115.42 0.00 2547.24 2531.77 15.46
L-1 4.00 114.88 6.00 115.22 112.98 112.98 114.88 115.12 114.88 112.98 112.98
L-2 6.10 112.98 9.40 112.98 0.00 5.13 7.23 11.23 15.22 17.33 22.23
L-3 11.23 112.98 117.48
R-1 3.99 114.88 6.00 115.20 112.98 115.22 115.42 115.20 112.98
R-2 6.10 112.98 9.40 112.98 1.83 5.23 11.23 17.23 20.63
R-3 11.00 112.98 117.48
115.80 117.48
54050 C 115.82 54050.00 116.12 0.00 1796.12 1790.85 5.27
L-1 3.79 115.75 6.00 115.92 115.05 115.05 115.75 115.82 115.75 115.14 115.14
L-2 6.46 115.05 7.40 115.05 0.00 1.54 4.21 8.00 11.78 14.00 15.50
L-3 8.00 115.05 117.48
R-1 3.78 115.75 6.00 115.90 115.05 115.92 116.12 115.90 115.14
R-2 6.00 115.14 7.20 115.14 0.60 2.00 8.00 14.00 15.20
R-3 7.50 115.14 117.48
119.55 116.28
54100 C 117.76 54100.00 118.06 0.00 2332.97 2317.44 15.53
L-1 3.95 117.55 6.00 117.86 115.55 115.55 117.55 117.76 117.55 115.55 115.55
L-2 6.50 115.55 9.50 115.55 0.00 3.37 5.92 9.87 13.87 15.97 19.87
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-3 9.87 115.55 119.78
R-1 4.00 117.55 6.00 117.84 115.55 117.86 118.06 117.84 115.55
R-2 6.10 115.55 9.50 115.55 0.37 3.87 9.87 15.87 19.37
R-3 10.00 115.55 119.78
119.55 119.78
54150 C 117.77 54150.00 118.07 0.00 2579.86 2566.67 13.19
L-1 3.86 117.71 6.00 117.87 115.55 115.55 117.71 117.77 117.74 115.99 115.99
L-2 5.98 115.55 9.80 115.34 0.00 5.02 7.14 11.00 15.00 17.10 22.00
L-3 11.00 115.55 119.78
R-1 4.00 117.74 6.00 117.85 115.34 117.87 118.07 117.85 115.99
R-2 6.10 115.99 8.80 115.99 1.20 5.00 11.00 17.00 19.80
R-3 11.00 115.99 119.78
119.55 119.78
54200 C 118.85 54200.00 119.15 0.00 2601.93 2582.15 19.78
L-1 3.76 118.40 6.00 118.95 116.13 116.13 118.40 118.85 118.85 116.10 116.10
L-2 6.63 116.13 10.30 116.13 0.00 4.37 7.24 11.00 15.00 17.83 22.00
L-3 11.00 116.13 119.78
R-1 4.00 118.85 6.00 118.93 116.13 118.95 119.15 118.93 116.10
R-2 6.83 116.10 10.30 116.10 0.70 5.00 11.00 17.00 21.30
R-3 11.00 116.10 119.78
119.55 119.78
54250 C 118.01 54250.00 118.31 0.00 2353.10 2342.75 10.34
L-1 3.95 117.95 6.00 118.11 116.10 116.10 117.95 118.01 117.90 116.55 116.55
L-2 5.98 116.10 9.10 116.10 0.00 4.02 6.05 10.00 13.86 16.00 20.00
L-3 10.00 116.10 119.78
R-1 3.86 117.90 6.00 118.09 116.10 118.11 118.31 118.09 115.43
R-2 6.00 116.55 10.00 115.43 0.90 4.00 10.00 16.00 20.00
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-3 10.00 116.55 119.78
119.55 119.78
54300 C 118.29 54300.00 118.59 0.00 2592.38 2579.99 12.39
L-1 3.85 118.14 6.00 118.39 116.05 116.05 118.14 118.29 118.05 116.99 116.99
L-2 6.12 116.05 10.10 115.66 0.00 4.88 7.15 11.00 14.96 17.00 22.00
L-3 11.00 116.05 119.78
R-1 3.96 118.05 6.00 118.37 115.66 118.39 118.59 118.37 116.99
R-2 6.00 116.99 8.10 116.99 0.90 5.00 11.00 17.00 19.10
R-3 11.00 116.99 119.78
118.08 119.78
54350 C 118.08 54350.00 118.38 0.00 2472.50 2462.39 10.11
L-1 3.94 117.88 6.00 118.18 116.61 116.61 117.88 118.08 117.91 116.58 116.58
L-2 6.32 116.61 8.40 116.61 0.00 3.68 6.06 10.00 13.82 16.10 21.00
L-3 10.00 116.61 119.78
R-1 3.82 117.91 6.00 118.16 116.61 118.18 118.38 118.16 116.58
R-2 6.10 116.58 8.40 116.58 1.60 4.00 10.00 16.00 18.40
R-3 11.00 116.58 119.78
118.71 119.78
54400 C 117.46 54400.00 117.76 0.00 2688.38 2675.93 12.45
L-1 3.89 117.31 6.00 117.56 115.51 115.51 117.31 117.46 117.16 115.61 115.61
L-2 6.42 115.51 9.70 115.15 0.00 4.58 7.11 11.00 15.00 16.98 23.00
L-3 11.00 115.51 119.78
R-1 4.00 117.16 6.00 117.54 115.15 117.56 117.76 117.54 115.26
R-2 5.98 115.61 9.50 115.26 1.30 5.00 11.00 17.00 20.50
R-3 12.00 115.61 119.78
118.71 119.78
54450 C 117.04 54450.00 117.34 0.00 2679.77 2667.22 12.56
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-1 3.75 116.81 6.00 117.14 115.11 115.11 116.81 117.04 116.70 115.26 115.26
L-2 6.85 115.11 9.10 115.11 0.00 4.15 7.25 11.00 14.98 17.68 23.00
L-3 11.00 115.11 119.78
R-1 3.98 116.70 6.00 117.12 115.11 117.14 117.34 117.12 115.26
R-2 6.68 115.26 8.80 115.26 1.90 5.00 11.00 17.00 19.80
R-3 12.00 115.26 119.78
118.71 119.78
54500 C 117.70 54500.00 118.00 0.00 2348.50 2337.89 10.60
L-1 4.00 117.41 6.00 117.80 116.26 116.26 117.41 117.70 117.24 116.26 116.26
L-2 6.46 116.26 8.40 116.26 0.00 2.54 5.00 9.00 12.92 15.52 20.00
L-3 9.00 116.26 119.78
R-1 3.92 117.24 6.00 117.78 116.26 117.80 118.00 117.78 116.26
R-2 6.52 116.26 8.30 116.26 0.60 3.00 9.00 15.00 17.30
R-3 11.00 116.26 119.78
118.71 119.78
54550 C 117.42 54550.00 117.72 0.00 2555.86 2541.05 14.80
L-1 4.00 116.98 6.00 117.52 116.06 116.06 116.98 117.42 116.91 115.01 115.01
L-2 6.12 116.06 8.20 116.06 0.00 3.74 5.86 9.86 13.72 16.50 21.86
L-3 9.86 116.06 119.78
R-1 3.86 116.91 6.00 117.50 116.06 117.52 117.72 117.50 115.01
R-2 6.64 115.01 9.80 115.01 1.66 3.86 9.86 15.86 19.66
R-3 12.00 115.01 119.78
118.71 119.78
54600 C 116.71 54600.00 117.01 0.00 2785.73 2771.71 14.02
L-1 3.78 116.61 6.00 116.81 114.71 114.71 116.61 116.71 116.56 114.56 114.56
L-2 6.65 114.71 9.20 114.71 0.00 5.35 8.22 12.00 15.98 18.00 24.00
L-3 12.00 114.71 119.78
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-1 3.98 116.56 6.00 116.79 114.71 116.81 117.01 116.79 114.56
R-2 6.00 114.56 9.40 114.56 2.80 6.00 12.00 18.00 21.40
R-3 12.00 114.56 119.78
118.71 119.78
54650 C 117.34 54650.00 117.64 0.00 2680.14 2652.97 27.17
L-1 3.90 116.71 6.00 117.44 113.91 113.91 116.71 117.34 116.71 114.61 114.61
L-2 6.52 113.91 11.30 113.91 0.00 5.46 8.08 11.98 15.94 17.98 22.98
L-3 11.98 113.91 119.78
R-1 3.96 116.71 6.00 117.42 113.91 117.44 117.64 117.42 114.61
R-2 6.00 114.61 10.30 114.61 0.68 5.98 11.98 17.98 22.28
R-3 11.00 114.61 119.78
118.71 119.78
54700 C 117.39 54700.00 117.69 0.00 1776.12 1771.13 4.98
L-1 3.90 117.37 6.00 117.49 116.78 116.78 117.37 117.39 117.36 116.56 116.56
L-2 6.10 116.78 7.10 116.78 0.00 1.46 3.66 7.56 11.40 13.66 15.12
L-3 7.56 116.78 119.78
R-1 3.84 117.36 6.00 117.47 116.78 117.49 117.69 117.47 116.56
R-2 6.10 116.56 7.40 116.56 0.46 1.56 7.56 13.56 14.96
R-3 7.56 116.56 119.78
118.71 119.78
54750 C 116.98 54750.00 117.28 0.00 2218.14 2204.92 13.22
L-1 3.88 116.86 6.00 117.08 115.76 115.76 116.86 116.98 116.76 115.11 115.11
L-2 6.00 115.76 8.00 115.76 0.00 3.00 5.12 9.00 12.94 12.10 19.00
L-3 9.00 115.76 119.78
R-1 3.94 116.76 6.00 117.06 115.76 117.08 117.28 117.06 115.11
R-2 3.10 115.11 9.00 115.11 1.00 3.00 9.00 15.00 18.00
R-3 10.00 115.11 119.78
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
118.71 119.78
54800 C 117.03 54800.00 117.33 0.00 2425.13 2409.90 15.23
L-1 3.95 116.76 6.00 117.13 115.31 115.31 116.76 117.03 116.81 114.51 114.51
L-2 6.50 115.31 8.80 115.31 0.00 3.30 5.85 9.80 13.80 15.90 20.80
L-3 9.80 115.31 119.78
R-1 4.00 116.81 6.00 117.11 115.31 117.13 117.33 117.11 114.51
R-2 6.10 114.51 9.90 114.51 1.00 3.80 9.80 15.80 19.70
R-3 11.00 114.51 119.78
118.71 119.78
54850 C 115.91 54850.00 116.21 0.00 2504.07 2491.01 13.06
L-1 3.75 115.81 6.00 116.01 114.01 114.01 115.81 115.91 115.76 114.01 114.01
L-2 5.94 114.01 9.00 114.01 0.00 4.75 6.94 10.69 14.69 16.79 21.69
L-3 10.69 114.01 119.78
R-1 4.00 115.76 6.00 115.99 114.01 116.01 116.21 115.99 114.01
R-2 6.10 114.01 9.00 114.01 1.69 4.69 10.69 16.69 19.69
R-3 11.00 114.01 119.78
118.71 119.78
54900 C 117.35 54900.00 117.65 0.00 2799.31 2781.72 17.60
L-1 3.78 117.29 6.00 117.45 114.81 114.81 117.29 117.35 117.11 115.01 115.01
L-2 6.16 114.81 10.00 114.81 0.00 5.84 8.22 12.00 15.86 18.50 24.00
L-3 12.00 114.81 119.78
R-1 3.86 117.11 6.00 117.43 114.81 117.45 117.65 117.43 115.01
R-2 6.50 115.01 9.70 115.01 2.00 6.00 12.00 18.00 21.70
R-3 12.00 115.01 119.78
118.71 119.78
54950 C 117.45 54950.00 117.75 0.00 2636.96 2621.01 15.95
L-1 3.72 117.21 6.00 117.55 115.31 115.31 117.21 117.45 117.21 115.31 115.21
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-2 6.34 115.31 9.40 115.31 0.00 4.22 6.84 10.56 14.41 16.56 22.56
L-3 10.56 115.31 119.78
R-1 3.85 117.21 6.00 117.53 115.31 117.55 117.75 117.53 115.31
R-2 6.00 115.31 9.40 115.31 1.16 4.56 10.56 16.56 19.96
R-3 12.00 115.21 119.78
118.13 119.78
55000 C 118.15 55000.00 118.45 0.00 2588.73 2574.95 13.79
L-1 3.90 117.98 6.00 118.25 115.98 115.98 117.98 118.15 117.98 116.42 116.42
L-2 6.12 115.98 9.50 115.98 0.00 4.88 7.10 11.00 15.00 16.96 22.00
L-3 11.00 115.98 119.78
R-1 4.00 117.98 6.00 118.23 115.98 118.25 118.45 118.23 116.42
R-2 5.96 116.42 8.80 116.42 1.50 5.00 11.00 17.00 19.80
R-3 11.00 116.42 119.78
121.88 118.88
55050 C 120.09 55050.00 120.39 0.00 2862.98 2838.25 24.73
L-1 3.88 119.88 6.00 120.19 117.19 117.19 119.88 120.09 119.78 116.90 116.90
L-2 6.34 117.19 10.50 117.19 0.00 5.66 8.12 12.00 15.85 18.10 24.00
L-3 12.00 117.19 122.38
R-1 3.85 119.78 6.00 120.17 117.19 120.19 120.39 120.17 116.90
R-2 6.10 116.90 11.00 116.90 1.50 6.00 12.00 18.00 23.00
R-3 12.00 116.90 122.38
121.88 122.38
55100 C 120.10 55100.00 120.40 0.00 2395.62 2383.88 11.75
L-1 3.81 120.04 6.00 120.20 118.58 118.58 120.04 120.10 120.07 118.07 118.07
L-2 6.00 118.58 8.50 118.58 0.00 4.00 6.19 10.00 13.96 16.00 20.00
L-3 10.00 118.58 122.38
R-1 3.96 120.07 6.00 120.18 118.58 120.20 120.40 120.18 118.07
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-2 6.00 118.07 9.20 118.07 1.50 4.00 10.00 16.00 19.20
R-3 10.00 118.07 122.38
121.88 122.38
55150 C 121.18 55150.00 121.48 0.00 2652.95 2630.79 22.16
L-1 3.95 120.98 6.00 121.28 118.10 118.10 120.98 121.18 121.03 118.43 118.43
L-2 6.50 118.10 10.80 118.10 0.00 4.50 7.05 11.00 15.00 17.10 22.00
L-3 11.00 118.10 122.38
R-1 4.00 121.03 6.00 121.26 118.10 121.28 121.48 121.26 118.43
R-2 6.10 118.43 10.30 118.43 0.20 5.00 11.00 17.00 21.30
R-3 11.00 118.43 122.38
121.88 122.38
55200 C 120.34 55200.00 120.64 0.00 2638.71 2628.77 9.94
L-1 3.94 120.28 6.00 120.44 118.63 118.63 120.28 120.34 120.23 118.90 118.90
L-2 6.00 118.63 8.80 118.63 0.00 4.00 6.06 10.00 13.98 16.62 22.00
L-3 10.00 118.63 122.38
R-1 3.98 120.23 6.00 120.42 118.63 120.44 120.64 120.42 118.90
R-2 6.62 118.90 8.30 118.90 1.20 4.00 10.00 16.00 18.30
R-3 12.00 118.90 122.38
121.88 122.38
55250 C 120.62 55250.00 120.92 0.00 2645.37 2635.14 10.24
L-1 4.00 120.47 6.00 120.72 118.73 118.73 120.47 120.62 120.38 119.38 119.38
L-2 6.54 118.73 9.00 118.73 0.00 3.46 6.00 10.00 13.98 16.50 22.00
L-3 10.00 118.73 122.38
R-1 3.98 120.38 6.00 120.70 118.73 120.72 120.92 120.70 119.38
R-2 6.50 119.38 8.00 119.38 1.00 4.00 10.00 16.00 18.00
R-3 12.00 119.38 122.38
120.41 122.38
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
55300 C 120.41 55300.00 120.71 0.00 2401.34 2387.01 14.33
L-1 3.96 120.21 6.00 120.51 118.59 118.59 120.21 120.41 120.22 118.22 118.22
L-2 6.12 118.59 8.90 118.59 0.00 3.88 6.04 10.00 13.90 16.00 20.00
L-3 10.00 118.59 122.38
R-1 3.90 120.22 6.00 120.49 118.59 120.51 120.71 120.49 118.22
R-2 6.00 118.22 9.50 118.22 1.10 4.00 10.00 16.00 19.50
R-3 10.00 118.22 122.38
121.04 122.38
55350 C 119.79 55350.00 120.09 0.00 2741.17 2724.79 16.39
L-1 3.98 119.44 6.00 119.89 117.44 117.44 119.44 119.79 119.64 117.59 117.59
L-2 6.55 117.44 9.70 117.44 0.00 4.45 7.02 11.00 15.00 17.00 23.00
L-3 11.00 117.44 122.38
R-1 4.00 119.64 6.00 119.87 117.44 119.89 120.09 119.87 117.59
R-2 6.00 117.59 9.50 117.59 1.30 5.00 11.00 17.00 20.50
R-3 12.00 117.59 122.38
121.04 122.38
55400 C 119.37 55400.00 119.67 0.00 2646.61 2634.15 12.46
L-1 3.97 119.14 6.00 119.47 117.14 117.14 119.14 119.37 119.03 118.06 118.06
L-2 6.65 117.14 9.50 117.14 0.00 3.60 6.28 10.25 14.25 16.35 22.25
L-3 10.25 117.14 122.38
R-1 4.00 119.03 6.00 119.45 117.14 119.47 119.67 119.45 118.06
R-2 6.10 118.06 8.10 118.06 0.75 4.25 10.25 16.25 18.35
R-3 12.00 118.06 122.38
121.04 122.38
55450 C 119.44 55450.00 119.74 0.00 2851.93 2837.29 14.64
L-1 3.96 119.09 6.00 119.54 117.59 117.59 119.09 119.44 119.03 117.39 117.39
L-2 6.22 117.59 9.00 117.59 0.00 5.78 8.04 12.00 16.00 18.10 24.00
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-3 12.00 117.59 122.38
R-1 4.00 119.03 6.00 119.52 117.59 119.54 119.74 119.52 117.39
R-2 6.10 117.39 9.20 117.39 3.00 6.00 12.00 18.00 21.20
R-3 12.00 117.39 122.38
121.04 117.58
55500 C 120.14 55500.00 120.44 0.00 2454.47 2436.28 18.19
L-1 3.98 119.83 6.00 120.24 117.64 117.64 119.83 120.14 120.09 117.48 117.48
L-2 6.54 117.64 9.90 117.64 0.00 5.46 8.02 12.00 16.00 18.50 20.50
L-3 12.00 117.64 122.38
R-1 4.00 120.09 6.00 120.22 117.64 120.24 120.44 120.22 117.48
R-2 6.50 117.48 10.20 117.48 2.10 6.00 12.00 18.00 22.20
R-3 8.50 117.48 122.38
121.04 122.38
55550 C 119.68 55550.00 119.98 0.00 2732.42 2712.95 19.47
L-1 3.92 119.62 6.00 119.78 116.92 116.92 119.62 119.68 119.50 116.99 116.99
L-2 6.68 116.92 10.30 116.92 0.00 4.28 7.04 10.96 14.96 17.12 22.96
L-3 10.96 116.92 122.38
R-1 4.00 119.50 6.00 119.76 116.92 119.78 119.98 119.76 116.99
R-2 6.16 116.99 10.20 116.99 0.66 4.96 10.96 16.96 21.16
R-3 12.00 116.99 122.38
121.04 122.38
55600 C 119.46 55600.00 119.76 0.00 2382.77 2368.63 14.14
L-1 3.78 119.11 6.00 119.56 118.04 118.04 119.11 119.46 119.16 117.16 117.16
L-2 6.00 118.04 8.30 118.04 0.00 4.00 6.22 10.00 13.85 16.23 20.00
L-3 10.00 118.04 122.38
R-1 3.85 119.16 6.00 119.54 118.04 119.56 119.76 119.54 117.16
R-2 6.23 117.16 9.60 117.16 1.70 4.00 10.00 16.00 19.60
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-3 10.00 117.16 122.38
121.04 122.38
55650 C 116.92 55650.00 117.22 0.00 2217.46 2207.31 10.15
L-1 4.00 116.84 6.00 117.02 115.35 115.35 116.84 116.92 116.52 115.52 115.52
L-2 6.32 115.35 8.60 115.35 0.00 2.68 5.00 9.00 12.95 15.54 19.00
L-3 9.00 115.35 122.38
R-1 3.95 116.52 6.00 117.00 115.35 117.02 117.22 117.00 115.52
R-2 6.54 115.52 8.30 115.52 0.40 3.00 9.00 15.00 17.30
R-3 10.00 115.52 122.38
121.04 122.38
55700 C 118.28 55700.00 118.58 0.00 2122.54 2115.93 6.61
L-1 4.00 118.22 6.00 118.38 117.44 117.44 118.22 118.28 118.15 117.04 117.04
L-2 6.35 117.44 7.50 117.44 0.00 2.61 4.96 8.96 12.91 15.50 17.96
L-3 8.96 117.44 122.38
R-1 3.95 118.15 6.00 118.36 117.44 118.38 118.58 118.36 117.04
R-2 6.54 117.04 8.00 117.04 1.46 2.96 8.96 14.96 16.96
R-3 9.00 117.04 122.38
121.04 122.38
55750 C 120.03 55750.00 120.33 0.00 2393.41 2376.94 16.47
L-1 3.92 119.51 6.00 120.13 117.54 117.54 119.51 120.03 119.64 118.06 118.06
L-2 6.30 117.54 9.90 117.54 0.00 3.70 6.08 10.00 13.86 17.56 20.00
L-3 10.00 117.54 122.38
R-1 3.86 119.64 6.00 120.11 117.54 120.13 120.33 120.11 118.06
R-2 7.56 118.06 9.10 118.06 0.10 4.00 10.00 16.00 19.10
R-3 10.00 118.06 122.38
121.04 122.38
55800 C 120.04 55800.00 120.34 0.00 2513.17 2500.26 12.91
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-1 3.98 119.74 6.00 120.14 118.14 118.14 119.74 120.04 119.56 118.59 118.59
L-2 6.00 118.14 9.00 118.14 0.00 4.00 6.02 10.00 13.86 16.00 21.00
L-3 10.00 118.14 122.38
R-1 3.86 119.56 6.00 120.12 118.14 120.14 120.34 120.12 118.59
R-2 6.00 118.59 8.30 118.59 1.00 4.00 10.00 16.00 18.30
R-3 11.00 118.59 122.38
121.04 122.38
55850 C 119.08 55850.00 119.38 0.00 2376.76 2368.26 8.50
L-1 3.86 118.96 6.00 119.18 117.59 117.59 118.96 119.08 118.94 118.04 118.04
L-2 6.35 117.59 8.40 117.59 0.00 3.65 6.14 10.00 13.76 16.00 20.00
L-3 10.00 117.59 122.38
R-1 3.76 118.94 6.00 119.16 117.59 119.18 119.38 119.16 118.04
R-2 6.00 118.04 7.70 118.04 1.60 4.00 10.00 16.00 17.70
R-3 10.00 118.04 122.38
121.04 122.38
55900 C 120.53 55900.00 120.83 0.00 3460.93 3437.24 23.69
L-1 3.85 120.49 6.00 120.63 117.59 117.59 120.49 120.53 120.34 117.39 117.39
L-2 6.36 117.59 10.60 117.59 0.00 7.64 10.15 14.00 18.00 20.00 29.00
L-3 14.00 117.59 122.38
R-1 4.00 120.34 6.00 120.61 117.59 120.63 120.83 120.61 117.39
R-2 6.00 117.39 10.90 117.39 3.40 8.00 14.00 20.00 24.90
R-3 15.00 117.39 122.38
121.04 122.38
55950 C 120.03 55950.00 120.33 0.00 2394.17 2381.04 13.14
L-1 3.78 119.74 6.00 120.13 117.92 117.92 119.74 120.03 119.84 118.48 118.48
L-2 6.05 117.92 9.40 117.92 0.00 3.95 6.22 10.00 13.93 16.50 20.00
L-3 10.00 117.92 122.38
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-1 3.93 119.84 6.00 120.11 117.92 120.13 120.33 120.11 118.48
R-2 6.50 118.48 8.50 118.48 0.60 4.00 10.00 16.00 18.50
R-3 10.00 118.48 122.38
121.04 122.38
56000 C 119.75 56000.00 120.05 0.00 2622.28 2602.43 19.85
L-1 3.94 119.31 6.00 119.85 117.24 117.24 119.31 119.75 119.24 117.34 117.34
L-2 6.52 117.24 10.00 117.24 0.00 4.48 7.06 11.00 14.79 17.00 22.00
L-3 11.00 117.24 122.38
R-1 3.79 119.24 6.00 119.83 117.24 119.85 120.05 119.83 117.34
R-2 6.00 117.34 9.80 117.34 1.00 5.00 11.00 17.00 20.80
R-3 11.00 117.34 122.38
121.04 122.38
56050 C 119.04 56050.00 119.34 0.00 2606.27 2587.72 18.55
L-1 3.91 118.94 6.00 119.14 116.54 116.54 118.94 119.04 118.89 116.44 116.44
L-2 6.52 116.54 9.90 116.54 0.00 3.48 6.09 10.00 13.76 16.00 22.00
L-3 10.00 116.54 122.38
R-1 3.76 118.89 6.00 119.12 116.54 119.14 119.34 119.12 116.44
R-2 6.00 116.44 10.10 116.44 0.10 4.00 10.00 16.00 20.10
R-3 12.00 116.44 122.38
121.04 122.38
56100 C 119.67 56100.00 119.97 0.00 2952.01 2922.91 29.09
L-1 3.79 119.59 6.00 119.77 116.24 116.24 119.59 119.67 119.54 116.14 116.14
L-2 6.31 116.24 11.30 116.24 0.00 6.55 9.07 12.86 16.74 18.96 24.86
L-3 12.86 116.24 122.38
R-1 3.88 119.54 6.00 119.75 116.24 119.77 119.97 119.75 116.14
R-2 6.10 116.14 11.50 116.14 1.56 6.86 12.86 18.86 24.36
R-3 12.00 116.14 122.38
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
121.04 122.38
56150 C 119.44 56150.00 119.74 0.00 2383.81 2374.59 9.22
L-1 3.78 119.09 6.00 119.54 118.14 118.14 119.09 119.44 119.34 118.14 118.14
L-2 6.64 118.14 8.20 118.14 0.00 4.36 7.22 11.00 14.85 17.00 20.00
L-3 11.00 118.14 122.38
R-1 3.85 119.34 6.00 119.52 118.14 119.54 119.74 119.52 118.14
R-2 6.00 118.14 8.10 118.14 2.80 5.00 11.00 17.00 19.10
R-3 9.00 118.14 122.38
121.04 122.38
56200 C 120.14 56200.00 120.44 0.00 2863.48 2835.55 27.93
L-1 3.95 120.04 6.00 120.24 116.92 116.92 120.04 120.14 120.09 116.48 116.48
L-2 6.50 116.92 11.00 116.92 0.00 5.50 8.05 12.00 16.00 18.00 24.00
L-3 12.00 116.92 122.38
R-1 4.00 120.09 6.00 120.22 116.92 120.24 120.44 120.22 116.48
R-2 6.00 116.48 11.70 116.48 1.00 6.00 12.00 18.00 23.70
R-3 12.00 116.48 122.38
121.04 122.38
56250 C 119.68 56250.00 119.98 0.00 2853.22 2829.34 23.88
L-1 4.00 119.62 6.00 119.78 116.48 116.48 119.62 119.68 119.54 116.81 116.81
L-2 5.95 116.48 11.00 116.48 0.00 6.05 8.00 12.00 15.95 18.12 24.00
L-3 12.00 116.48 122.38
R-1 3.95 119.54 6.00 119.76 116.48 119.78 119.98 119.76 116.81
R-2 6.12 116.81 10.50 116.81 1.00 6.00 12.00 18.00 22.50
R-3 12.00 116.81 122.38
121.04 122.38
56300 C 119.46 56300.00 119.76 0.00 2847.97 2823.24 24.73
L-1 3.84 119.11 6.00 119.56 116.48 116.48 119.11 119.46 119.16 116.39 116.39
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-2 6.00 116.48 10.70 116.48 0.00 6.00 8.16 12.00 15.97 18.50 24.00
L-3 12.00 116.48 122.38
R-1 3.97 119.16 6.00 119.54 116.48 119.56 119.76 119.54 116.39
R-2 6.50 116.39 10.80 116.39 1.30 6.00 12.00 18.00 22.80
R-3 12.00 116.39 122.38
121.04 122.38
56350 C 119.94 56350.00 120.24 0.00 3556.38 3523.98 32.39
L-1 3.95 119.74 6.00 120.04 116.48 116.48 119.74 119.94 119.59 116.14 116.14
L-2 6.00 116.48 11.40 116.48 0.00 9.00 11.05 15.00 19.00 21.00 30.00
L-3 15.00 116.48 122.38
R-1 4.00 119.59 6.00 120.02 116.48 120.04 120.24 120.02 116.14
R-2 6.00 116.14 11.90 116.14 3.60 9.00 15.00 21.00 26.90
R-3 15.00 116.14 122.38
121.04 122.38
56400 C 119.81 56400.00 120.11 0.00 2856.39 2830.67 25.72
L-1 4.00 119.48 6.00 119.91 117.06 117.06 119.48 119.81 119.39 116.48 116.48
L-2 6.12 117.06 10.30 117.06 0.00 5.88 8.00 12.00 15.81 18.08 24.00
L-3 12.00 117.06 122.38
R-1 3.81 119.39 6.00 119.89 117.06 119.91 120.11 119.89 116.48
R-2 6.08 116.48 11.20 116.48 1.70 6.00 12.00 18.00 23.20
R-3 12.00 116.48 122.38
121.04 122.38
56450 C 120.03 56450.00 120.33 0.00 2745.63 2725.34 20.29
L-1 3.73 119.51 6.00 120.13 117.48 117.48 119.51 120.03 119.84 117.48 117.48
L-2 6.10 117.48 10.00 117.48 0.00 4.90 7.27 11.00 14.97 17.10 23.00
L-3 11.00 117.48 122.38
R-1 3.97 119.84 6.00 120.11 117.48 120.13 120.33 120.11 117.48
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-2 6.10 117.48 10.00 117.48 1.00 5.00 11.00 17.00 21.00
R-3 12.00 117.48 122.38
121.04 122.38
56500 C 119.74 56500.00 120.04 0.00 2211.16 2199.03 12.13
L-1 3.75 119.47 6.00 119.84 118.74 118.74 119.47 119.74 119.56 117.56 117.56
L-2 5.56 118.74 7.70 118.74 0.00 2.94 4.75 8.50 12.50 14.30 18.50
L-3 8.50 118.74 122.38
R-1 4.00 119.56 6.00 119.82 118.74 119.84 120.04 119.82 117.56
R-2 5.80 117.56 9.40 117.56 0.80 2.50 8.50 14.50 17.90
R-3 10.00 117.56 122.38
121.04 122.38
56550 C 119.08 56550.00 119.38 0.00 2375.28 2363.54 11.74
L-1 4.00 118.96 6.00 119.18 117.34 117.34 118.96 119.08 118.68 117.48 117.48
L-2 6.00 117.34 8.80 117.34 0.00 5.00 7.00 11.00 14.84 17.64 20.00
L-3 11.00 117.34 122.38
R-1 3.84 118.68 6.00 119.16 117.34 119.18 119.38 119.16 117.48
R-2 6.64 117.48 8.60 117.48 2.20 5.00 11.00 17.00 19.60
R-3 9.00 117.48 122.38
121.04 122.38
56600 C 120.53 56600.00 120.83 0.00 2522.14 2507.49 14.66
L-1 4.00 120.49 6.00 120.63 118.48 118.48 120.49 120.53 120.02 118.50 118.59
L-2 6.00 118.48 9.30 118.48 0.00 5.00 7.00 11.00 14.78 17.58 21.00
L-3 11.00 118.48 122.38
R-1 3.78 120.02 6.00 120.61 118.48 120.63 120.83 120.61 118.50
R-2 6.58 118.50 9.20 118.50 1.70 5.00 11.00 17.00 20.20
R-3 10.00 118.59 122.38
121.04 122.38
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
56650 C 120.03 56650.00 120.33 0.00 2157.97 2147.67 10.31
L-1 3.95 119.74 6.00 120.13 118.59 118.59 119.74 120.03 119.57 118.69 118.69
L-2 6.50 118.59 8.40 118.59 0.00 3.00 5.55 9.50 13.40 16.16 18.00
L-3 9.50 118.59 122.38
R-1 3.90 119.57 6.00 120.11 118.59 120.13 120.33 120.11 118.69
R-2 6.66 118.69 8.20 118.69 1.10 3.50 9.50 15.50 17.70
R-3 8.50 118.69 122.38
121.04 122.38
56700 C 119.75 56700.00 120.05 0.00 2854.68 2828.23 26.45
L-1 4.00 119.31 6.00 119.85 116.48 116.48 119.31 119.75 119.24 116.84 116.84
L-2 5.95 116.48 11.10 116.48 0.00 6.05 8.00 12.00 15.95 18.32 24.00
L-3 12.00 116.48 122.38
R-1 3.95 119.24 6.00 119.83 116.48 119.85 120.05 119.83 116.84
R-2 6.32 116.84 10.50 116.84 0.90 6.00 12.00 18.00 22.50
R-3 12.00 116.84 122.38
121.04 122.38
56750 C 120.04 56750.00 120.34 0.00 2744.34 2714.56 29.78
L-1 3.79 119.59 6.00 120.14 117.04 117.04 119.59 120.04 119.39 116.44 116.44
L-2 6.50 117.04 10.70 117.04 0.00 4.50 7.21 11.00 14.85 17.00 23.00
L-3 11.00 117.04 122.38
R-1 3.85 119.39 6.00 120.12 117.04 120.14 120.34 120.12 116.44
R-2 6.00 116.44 11.60 116.44 0.30 5.00 11.00 17.00 22.60
R-3 12.00 116.44 122.38
121.04 122.38
56800 C 120.04 56800.00 120.34 0.00 2860.75 2829.84 30.91
L-1 3.95 119.69 6.00 120.14 116.48 116.48 119.69 120.04 119.48 116.48 116.48
L-2 6.50 116.48 11.50 116.48 0.00 5.50 8.05 12.00 15.98 18.45 24.00
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-3 12.00 116.48 122.38
R-1 3.98 119.48 6.00 120.12 116.48 120.14 120.34 120.12 116.48
R-2 6.45 116.48 11.50 116.48 0.50 6.00 12.00 18.00 23.50
R-3 12.00 116.48 122.38
121.04 122.38
56850 C 119.97 56850.00 120.27 0.00 2862.10 2845.66 16.43
L-1 4.00 119.74 6.00 120.07 117.48 117.48 119.74 119.97 120.31 117.59 117.59
L-2 5.95 117.48 9.90 117.48 0.00 6.05 8.00 12.00 15.95 18.12 24.00
L-3 12.00 117.48 122.38
R-1 3.95 120.31 6.00 120.05 117.48 120.07 120.27 120.05 117.59
R-2 6.12 117.59 9.70 117.59 2.10 6.00 12.00 18.00 21.70
R-3 12.00 117.59 122.38
121.04 122.38
56900 C 118.83 56900.00 119.13 0.00 2124.16 2111.11 13.05
L-1 3.98 118.22 6.00 118.93 116.69 116.69 118.22 118.83 118.81 117.48 117.48
L-2 5.95 116.69 9.40 116.69 0.00 3.50 5.47 9.45 13.40 15.67 17.90
L-3 9.45 116.69 122.38
R-1 3.95 118.81 6.00 118.91 116.69 118.93 119.13 118.91 117.48
R-2 6.22 117.48 8.20 117.48 0.05 3.45 9.45 15.45 17.65
R-3 8.45 117.48 122.38
121.04 122.38
56950 C 119.49 56950.00 119.79 0.00 2852.24 2836.38 15.86
L-1 4.00 119.14 6.00 119.59 117.15 117.15 119.14 119.49 119.24 117.59 117.59
L-2 5.95 117.15 9.70 117.15 0.00 6.05 8.00 12.00 15.95 18.12 24.00
L-3 12.00 117.15 122.38
R-1 3.95 119.24 6.00 119.57 117.15 119.59 119.79 119.57 117.59
R-2 6.12 117.59 9.00 117.59 2.30 6.00 12.00 18.00 21.00
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-3 12.00 117.59 122.38
121.04 122.38
57000 C 119.71 57000.00 120.01 0.00 2621.72 2604.29 17.43
L-1 3.97 119.44 6.00 119.81 117.48 117.48 119.44 119.71 119.42 117.32 117.32
L-2 5.95 117.48 9.50 117.48 0.00 5.05 7.03 11.00 14.95 17.12 22.00
L-3 11.00 117.48 122.38
R-1 3.95 119.42 6.00 119.79 117.48 119.81 120.01 119.79 117.32
R-2 6.12 117.32 9.80 117.32 1.50 5.00 11.00 17.00 20.80
R-3 11.00 117.32 122.38
121.04 120.48
57050 C 120.17 57050.00 120.47 0.00 2149.02 2140.96 8.05
L-1 4.00 120.04 6.00 120.27 119.04 119.04 120.04 120.17 120.06 118.89 118.89
L-2 5.95 119.04 7.90 119.04 0.00 3.50 5.45 9.45 13.40 15.57 17.90
L-3 9.45 119.04 122.38
R-1 3.95 120.06 6.00 120.25 119.04 120.27 120.47 120.25 118.89
R-2 6.12 118.89 8.10 118.89 1.55 3.45 9.45 15.45 17.55
R-3 8.45 118.89 122.38
121.04 122.38
57100 C 119.42 57100.00 119.72 0.00 2454.51 2445.84 8.67
L-1 4.00 119.24 6.00 119.52 118.04 118.04 119.24 119.42 119.19 118.24 118.24
L-2 6.50 118.04 8.30 118.04 0.00 3.10 5.60 9.60 13.58 15.75 20.60
L-3 9.60 118.04 122.38
R-1 3.98 119.19 6.00 119.50 118.04 119.52 119.72 119.50 118.24
R-2 6.15 118.24 7.90 118.24 1.30 3.60 9.60 15.60 17.50
R-3 11.00 118.24 122.38
121.04 122.38
57150 C 119.09 57150.00 119.39 0.00 2329.88 2320.75 9.13
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-1 4.00 118.94 6.00 119.19 117.64 117.64 118.94 119.09 118.82 117.99 117.99
L-2 6.00 117.64 8.40 117.64 0.00 3.60 5.60 9.60 13.49 15.60 19.60
L-3 9.60 117.64 122.38
R-1 3.89 118.82 6.00 119.17 117.64 119.19 119.39 119.17 117.99
R-2 6.00 117.99 7.80 117.99 1.20 3.60 9.60 15.60 17.40
R-3 10.00 117.99 122.38
121.04 122.38
57200 C 120.00 57200.00 120.30 0.00 2274.67 2264.73 9.94
L-1 3.78 119.78 6.00 120.10 118.04 118.04 119.78 120.00 119.84 118.84 118.84
L-2 7.10 118.04 9.10 118.04 0.00 3.90 7.22 11.00 14.96 17.63 19.00
L-3 11.00 118.04 122.38
R-1 3.96 119.84 6.00 120.08 118.04 120.10 120.30 120.08 118.84
R-2 6.63 118.84 7.90 118.84 1.90 5.00 11.00 17.00 18.90
R-3 8.00 118.84 122.38
121.04 122.38
57250 C 120.10 57250.00 120.40 0.00 2336.81 2325.90 10.91
L-1 3.76 119.82 6.00 120.20 119.04 119.04 119.82 120.10 119.80 118.44 118.44
L-2 5.10 119.04 7.80 119.04 0.00 3.40 4.74 8.50 12.50 14.15 19.50
L-3 8.50 119.04 122.38
R-1 4.00 119.80 6.00 120.18 119.04 120.20 120.40 120.18 118.44
R-2 5.65 118.44 8.70 118.44 0.70 2.50 8.50 14.50 17.20
R-3 11.00 118.44 122.38
121.04 122.38
57300 C 119.64 57300.00 119.94 0.00 2391.18 2387.32 3.86
L-1 4.00 119.74 6.00 119.74 119.04 119.04 119.74 119.64 119.64 119.04 119.04
L-2 6.00 119.04 7.10 119.04 0.00 5.00 7.00 11.00 14.78 17.68 20.00
L-3 11.00 119.04 122.38
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-1 3.78 119.64 6.00 119.72 119.04 119.74 119.94 119.72 119.04
R-2 6.68 119.04 7.10 119.04 3.90 5.00 11.00 17.00 18.10
R-3 9.00 119.04 122.38
121.04 122.38
57350 C 119.51 57350.00 119.81 0.00 1841.36 1834.70 6.66
L-1 3.90 119.24 6.00 119.61 118.74 118.74 119.24 119.51 119.29 118.67 118.67
L-2 6.05 118.74 7.40 118.74 0.00 1.45 3.60 7.50 11.48 13.65 15.40
L-3 7.50 118.74 122.38
R-1 3.98 119.29 6.00 119.59 118.74 119.61 119.81 119.59 118.67
R-2 6.15 118.67 7.40 118.67 0.10 1.50 7.50 13.50 14.90
R-3 7.90 118.67 122.38
121.04 122.38
57400 C 120.26 57400.00 120.56 0.00 2102.79 2095.81 6.98
L-1 4.00 120.14 6.00 120.36 119.44 119.44 120.14 120.26 120.14 119.04 119.04
L-2 6.10 119.44 7.40 119.44 0.00 1.40 3.50 7.50 11.44 13.62 17.50
L-3 7.50 119.44 122.38
R-1 3.94 120.14 6.00 120.34 119.44 120.36 120.56 120.34 119.04
R-2 6.12 119.04 8.00 119.04 0.10 1.50 7.50 13.50 15.50
R-3 10.00 119.04 122.38
121.04 122.38
57450 C 119.46 57450.00 119.76 0.00 1888.17 1881.47 6.70
L-1 3.92 119.12 6.00 119.56 118.58 118.58 119.12 119.46 119.21 118.84 118.84
L-2 6.00 118.58 7.50 118.58 0.00 1.80 3.88 7.80 11.76 14.22 15.80
L-3 7.80 118.58 122.38
R-1 3.96 119.21 6.00 119.54 118.58 119.56 119.76 119.54 118.84
R-2 6.42 118.84 7.10 118.84 0.30 1.80 7.80 13.80 14.90
R-3 8.00 118.84 122.38
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
121.04 122.38
57500 C 118.37 57500.00 118.67 0.00 2011.75 2004.02 7.73
L-1 3.79 118.14 6.00 118.47 117.74 117.74 118.14 118.37 118.24 117.04 117.04
L-2 5.10 117.74 7.10 117.74 0.00 3.40 4.71 8.50 12.50 14.25 17.00
L-3 8.50 117.74 122.38
R-1 4.00 118.24 6.00 118.45 117.74 118.47 118.67 118.45 117.04
R-2 5.75 117.04 8.20 117.04 1.40 2.50 8.50 14.50 16.70
R-3 8.50 117.04 122.38
121.04 122.38
57550 C 119.80 57550.00 120.10 0.00 2391.70 2381.77 9.93
L-1 4.00 119.34 6.00 119.90 118.69 118.69 119.34 119.80 119.29 118.63 118.63
L-2 6.00 118.69 7.90 118.69 0.00 5.00 7.00 11.00 14.90 17.00 20.00
L-3 11.00 118.69 122.38
R-1 3.90 119.29 6.00 119.88 118.69 119.90 120.10 119.88 118.63
R-2 6.00 118.63 7.90 118.63 3.10 5.00 11.00 17.00 18.90
R-3 9.00 118.63 122.38
121.04 122.38
57600 C 118.77 57600.00 119.07 0.00 1829.99 1823.78 6.21
L-1 4.00 118.54 6.00 118.87 117.94 117.94 118.54 118.77 118.59 118.03 118.03
L-2 6.05 117.94 7.40 117.94 0.00 1.45 3.50 7.50 11.65 13.65 15.40
L-3 7.50 117.94 122.38
R-1 4.15 118.59 6.00 118.85 117.94 118.87 119.07 118.85 118.03
R-2 6.15 118.03 7.30 118.03 0.10 1.50 7.50 13.50 14.80
R-3 7.90 118.03 122.38
121.04 122.38
57650 C 120.24 57650.00 120.54 0.00 2361.87 2353.27 8.61
L-1 4.30 120.04 6.00 120.34 119.04 119.04 120.04 120.24 120.04 118.94 118.94
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-2 6.00 119.04 8.00 119.04 0.00 3.68 5.38 9.68 13.68 15.68 19.68
L-3 9.68 119.04 122.38
R-1 4.00 120.04 6.00 120.32 119.04 120.34 120.54 120.32 118.94
R-2 6.00 118.94 8.10 118.94 1.68 3.68 9.68 15.68 17.78
R-3 10.00 118.94 122.38
121.04 122.38
57700 C 119.84 57700.00 120.14 0.00 2036.48 2029.66 6.82
L-1 4.00 119.74 6.00 119.94 118.74 118.74 119.74 119.84 119.64 119.04 119.04
L-2 6.00 118.74 7.80 118.74 0.00 3.00 5.00 9.00 13.00 15.05 17.00
L-3 9.00 118.74 122.38
R-1 4.00 119.64 6.00 119.92 118.74 119.94 120.14 119.92 119.04
R-2 6.05 119.04 7.40 119.04 1.20 3.00 9.00 15.00 16.40
R-3 8.00 119.04 122.38
121.04 122.38
57750 C 119.06 57750.00 119.36 0.00 2023.55 2015.48 8.06
L-1 3.50 118.74 6.00 119.16 118.34 118.34 118.74 119.06 118.67 118.04 118.04
L-2 5.10 118.34 7.30 118.34 0.00 3.40 5.00 8.50 12.70 14.10 17.00
L-3 8.50 118.34 122.38
R-1 4.20 118.67 6.00 119.14 118.34 119.16 119.36 119.14 118.04
R-2 5.60 118.04 7.70 118.04 1.20 2.50 8.50 14.50 16.20
R-3 8.50 118.04 122.38
121.04 122.38
57800 C 118.03 57800.00 118.33 0.00 2356.67 2346.18 10.50
L-1 4.00 117.64 6.00 118.13 117.15 117.15 117.64 118.03 117.74 116.34 116.34
L-2 6.00 117.15 7.50 117.15 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 117.15 122.38
R-1 3.50 117.74 6.00 118.11 117.15 118.13 118.33 118.11 116.34
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-2 6.00 116.34 8.70 116.34 3.50 5.00 11.00 17.00 19.70
R-3 9.00 116.34 122.38
121.04 122.38
57850 C 119.65 57850.00 119.95 0.00 2151.93 2142.63 9.30
L-1 4.00 119.24 6.00 119.75 118.54 118.54 119.24 119.65 119.14 118.64 118.64
L-2 6.00 118.54 7.90 118.54 0.00 2.00 4.00 8.00 12.00 14.00 18.00
L-3 8.00 118.54 122.38
R-1 4.00 119.14 6.00 119.73 118.54 119.75 119.95 119.73 118.64
R-2 6.00 118.64 7.70 118.64 0.10 2.00 8.00 14.00 15.70
R-3 10.00 118.64 122.38
121.04 122.38
57900 C 119.58 57900.00 119.88 0.00 2252.07 2243.86 8.20
L-1 3.95 119.39 6.00 119.68 118.04 118.04 119.39 119.58 119.34 118.82 118.82
L-2 6.50 118.04 8.50 118.04 0.00 3.36 5.91 9.86 13.86 15.96 18.86
L-3 9.86 118.04 122.38
R-1 4.00 119.34 6.00 119.66 118.04 119.68 119.88 119.66 118.82
R-2 6.10 118.82 7.30 118.82 1.36 3.86 9.86 15.86 17.16
R-3 9.00 118.82 122.38
121.04 122.38
57950 C 119.28 57950.00 119.58 0.00 1915.78 1909.52 6.26
L-1 4.00 119.14 6.00 119.38 118.54 118.54 119.14 119.28 119.19 118.24 118.24
L-2 6.00 118.54 7.30 118.54 0.00 1.56 3.56 7.56 11.56 13.66 16.06
L-3 7.56 118.54 122.38
R-1 4.00 119.19 6.00 119.36 118.54 119.38 119.58 119.36 118.24
R-2 6.10 118.24 7.70 118.24 0.26 1.56 7.56 13.56 15.26
R-3 8.50 118.24 122.38
121.04 122.38
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
58000 C 119.59 58000.00 119.89 0.00 2195.09 2186.63 8.45
L-1 4.00 119.39 6.00 119.69 118.24 118.24 119.39 119.59 119.44 118.41 118.41
L-2 6.00 118.24 8.20 118.24 0.00 3.86 5.86 9.86 13.86 16.36 18.38
L-3 9.86 118.24 122.38
R-1 4.00 119.44 6.00 119.67 118.24 119.69 119.89 119.67 118.41
R-2 6.50 118.41 7.90 118.41 1.66 3.86 9.86 15.86 17.76
R-3 8.52 118.41 122.38
121.04 122.38
58050 C 119.29 58050.00 119.59 0.00 2579.94 2571.00 8.94
L-1 4.00 119.14 6.00 119.39 117.64 117.64 119.14 119.29 119.18 118.32 118.32
L-2 6.00 117.64 8.70 117.64 0.00 3.68 5.68 9.68 13.68 15.68 21.68
L-3 9.68 117.64 122.38
R-1 4.00 119.18 6.00 119.37 117.64 119.39 119.59 119.37 118.32
R-2 6.00 118.32 7.60 118.32 0.98 3.68 9.68 15.68 17.28
R-3 12.00 118.32 122.38
121.04 122.38
58100 C 118.54 58100.00 118.84 0.00 1822.89 1817.36 5.53
L-1 4.00 118.34 6.00 118.64 117.54 117.54 118.34 118.54 118.64 117.92 117.92
L-2 6.12 117.54 7.70 117.54 0.00 1.73 3.85 7.85 11.85 13.85 15.37
L-3 7.85 117.54 122.38
R-1 4.00 118.64 6.00 118.62 117.54 118.64 118.84 118.62 117.92
R-2 6.00 117.92 7.10 117.92 0.15 1.85 7.85 13.85 14.95
R-3 7.52 117.92 122.38
121.04 122.38
58150 C 118.29 58150.00 118.59 0.00 1789.65 1783.83 5.83
L-1 4.00 118.14 6.00 118.39 117.39 117.39 118.14 118.29 118.28 117.48 117.48
L-2 6.10 117.39 7.50 117.39 0.00 1.46 3.56 7.56 11.56 13.66 15.12
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-3 7.56 117.39 122.38
R-1 4.00 118.28 6.00 118.37 117.39 118.39 118.59 118.37 117.48
R-2 6.10 117.48 7.40 117.48 0.06 1.56 7.56 13.56 14.96
R-3 7.56 117.48 122.38
121.04 122.38
58200 C 119.33 58200.00 119.63 0.00 2264.22 2256.38 7.84
L-1 4.00 119.14 6.00 119.43 118.15 118.15 119.14 119.33 119.14 118.29 118.29
L-2 6.10 118.15 8.00 118.15 0.00 2.90 5.00 9.00 13.00 15.10 19.00
L-3 9.00 118.15 122.38
R-1 4.00 119.14 6.00 119.41 118.15 119.43 119.63 119.41 118.29
R-2 6.10 118.29 7.70 118.29 1.00 3.00 9.00 15.00 16.70
R-3 10.00 118.29 122.38
121.04 122.38
58250 C 120.17 58250.00 120.47 0.00 2279.23 2268.93 10.30
L-1 4.00 120.04 6.00 120.27 118.59 118.59 120.04 120.17 119.84 118.81 118.81
L-2 6.10 118.59 8.60 118.59 0.00 2.90 5.00 9.00 13.00 15.10 19.00
L-3 9.00 118.59 122.38
R-1 4.00 119.84 6.00 120.25 118.59 120.27 120.47 120.25 118.81
R-2 6.10 118.81 8.20 118.81 0.40 3.00 9.00 15.00 17.20
R-3 10.00 118.81 122.38
121.04 122.38
58300 C 120.94 58300.00 121.24 0.00 2649.09 2626.01 23.07
L-1 4.00 119.64 6.00 121.04 118.26 118.26 119.64 120.94 119.74 119.06 119.06
L-2 6.10 118.26 10.20 118.26 0.00 4.90 7.00 11.00 15.00 17.10 22.00
L-3 11.00 118.26 122.38
R-1 4.00 119.74 6.00 121.02 118.26 121.04 121.24 121.02 119.06
R-2 6.10 119.06 9.00 119.06 0.80 5.00 11.00 17.00 20.00
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-3 11.00 119.06 122.38
121.04 122.38
58350 C 119.74 58350.00 120.04 0.00 2745.69 2736.86 8.83
L-1 4.00 119.54 6.00 119.84 118.44 118.44 119.54 119.74 119.44 118.59 118.59
L-2 6.10 118.44 8.10 118.44 0.00 4.90 7.00 11.00 15.00 17.10 23.00
L-3 11.00 118.44 122.38
R-1 4.00 119.44 6.00 119.82 118.44 119.84 120.04 119.82 118.59
R-2 6.10 118.59 7.90 118.59 2.90 5.00 11.00 17.00 18.90
R-3 12.00 118.59 122.38
121.04 122.38
58400 C 119.88 58400.00 120.18 0.00 2743.93 2728.59 15.34
L-1 4.00 119.48 6.00 119.98 117.59 117.59 119.48 119.88 119.79 117.92 117.92
L-2 6.10 117.59 9.60 117.59 0.00 4.90 7.00 11.00 15.00 17.10 23.00
L-3 11.00 117.59 122.38
R-1 4.00 119.79 6.00 119.96 117.59 119.98 120.18 119.96 117.92
R-2 6.10 117.92 9.10 117.92 1.40 5.00 11.00 17.00 20.10
R-3 12.00 117.92 122.38
121.04 122.38
58450 C 119.50 58450.00 119.80 0.00 2619.92 2607.60 12.32
L-1 4.00 119.30 6.00 119.60 117.93 117.93 119.30 119.50 118.81 117.92 117.92
L-2 6.05 117.93 8.60 117.93 0.00 4.95 7.00 11.00 14.98 17.15 22.00
L-3 11.00 117.93 122.38
R-1 3.98 118.81 6.00 119.58 117.93 119.60 119.80 119.58 117.92
R-2 6.15 117.92 8.50 117.92 2.40 5.00 11.00 17.00 19.50
R-3 11.00 117.92 122.38
121.04 122.38
58500 C 119.58 58500.00 119.88 0.00 2090.96 2080.35 10.61
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-1 4.30 119.44 6.00 119.68 117.92 117.92 119.44 119.58 119.28 118.15 118.15
L-2 6.00 117.92 8.70 117.92 0.00 1.50 3.20 7.50 11.50 13.50 17.50
L-3 7.50 117.92 122.38
R-1 4.00 119.28 6.00 119.66 117.92 119.68 119.88 119.66 118.15
R-2 6.00 118.15 8.30 118.15 -1.20 1.50 7.50 13.50 15.80
R-3 10.00 118.15 122.38
121.04 122.38
58550 C 119.65 58550.00 119.95 0.00 2387.78 2378.69 9.09
L-1 4.00 119.54 6.00 119.75 118.34 118.34 119.54 119.65 119.48 118.26 118.26
L-2 6.00 118.34 8.20 118.34 0.00 3.00 5.00 9.00 13.00 15.05 20.00
L-3 9.00 118.34 122.38
R-1 4.00 119.48 6.00 119.73 118.34 119.75 119.95 119.73 118.26
R-2 6.05 118.26 8.30 118.26 0.80 3.00 9.00 15.00 17.30
R-3 11.00 118.26 122.38
121.04 118.88
58600 C 120.26 58600.00 120.56 0.00 2398.88 2385.39 13.49
L-1 3.50 120.04 6.00 120.36 118.48 118.48 120.04 120.26 120.04 118.58 118.58
L-2 5.10 118.48 8.90 118.48 0.00 4.90 6.50 10.00 14.20 15.60 20.00
L-3 10.00 118.48 122.38
R-1 4.20 120.04 6.00 120.34 118.48 120.36 120.56 120.34 118.58
R-2 5.60 118.58 8.70 118.58 1.10 4.00 10.00 16.00 18.70
R-3 10.00 118.58 122.38
121.04 122.38
58650 C 120.66 58650.00 120.96 0.00 2407.13 2395.49 11.64
L-1 4.00 120.48 6.00 120.76 119.04 119.04 120.48 120.66 120.29 119.15 119.15
L-2 6.00 119.04 8.60 119.04 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 119.04 122.38
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-1 3.50 120.29 6.00 120.74 119.04 120.76 120.96 120.74 119.15
R-2 6.00 119.15 8.40 119.15 2.40 5.00 11.00 17.00 19.40
R-3 9.00 119.15 122.38
121.04 122.38
58700 C 119.88 58700.00 120.18 0.00 2486.62 2475.52 11.09
L-1 4.00 119.63 6.00 119.98 118.15 118.15 119.63 119.88 119.64 118.48 118.48
L-2 6.05 118.15 8.80 118.15 0.00 3.75 5.80 9.80 13.78 15.95 20.80
L-3 9.80 118.15 122.38
R-1 3.98 119.64 6.00 119.96 118.15 119.98 120.18 119.96 118.48
R-2 6.15 118.48 8.30 118.48 1.00 3.80 9.80 15.80 18.10
R-3 11.00 118.48 122.38
121.04 122.38
58750 C 119.58 58750.00 119.88 0.00 2150.25 2141.36 8.89
L-1 4.30 119.22 6.00 119.68 118.59 118.59 119.22 119.58 119.52 118.06 118.06
L-2 6.00 118.59 7.70 118.59 0.00 3.00 4.70 9.00 13.00 15.00 18.00
L-3 9.00 118.59 122.38
R-1 4.00 119.52 6.00 119.66 118.59 119.68 119.88 119.66 118.06
R-2 6.00 118.06 8.50 118.06 1.30 3.00 9.00 15.00 17.50
R-3 9.00 118.06 122.38
121.04 122.38
58800 C 119.93 58800.00 120.23 0.00 2274.46 2263.93 10.53
L-1 4.00 119.57 6.00 120.03 118.48 118.48 119.57 119.93 119.84 118.39 118.39
L-2 6.00 118.48 8.40 118.48 0.00 3.00 5.00 9.00 13.00 15.05 19.00
L-3 9.00 118.48 122.38
R-1 4.00 119.84 6.00 120.01 118.48 120.03 120.23 120.01 118.39
R-2 6.05 118.39 8.50 118.39 0.60 3.00 9.00 15.00 17.50
R-3 10.00 118.39 122.38
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
121.04 122.38
58850 C 119.96 58850.00 120.26 0.00 2274.95 2262.27 12.68
L-1 3.50 119.68 6.00 120.06 118.15 118.15 119.68 119.96 119.86 118.48 118.48
L-2 5.10 118.15 8.90 118.15 0.00 3.90 5.50 9.00 13.20 14.60 19.00
L-3 9.00 118.15 122.38
R-1 4.20 119.86 6.00 120.04 118.15 120.06 120.26 120.04 118.48
R-2 5.60 118.48 8.40 118.48 0.10 3.00 9.00 15.00 17.40
R-3 10.00 118.48 122.38
121.04 122.38
58900 C 119.81 58900.00 120.11 0.00 2392.67 2384.94 7.73
L-1 4.00 119.46 6.00 119.91 118.91 118.91 119.46 119.81 119.71 118.73 118.73
L-2 6.00 118.91 7.50 118.91 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 118.91 122.38
R-1 3.50 119.71 6.00 119.89 118.91 119.91 120.11 119.89 118.73
R-2 6.00 118.73 7.80 118.73 3.50 5.00 11.00 17.00 18.80
R-3 9.00 118.73 122.38
121.04 122.38
58950 C 119.66 58950.00 119.96 0.00 2140.01 2133.04 6.97
L-1 4.00 119.49 6.00 119.76 118.48 118.48 119.49 119.66 119.51 118.92 118.92
L-2 6.05 118.48 8.00 118.48 0.00 3.95 6.00 10.00 13.98 16.15 17.90
L-3 10.00 118.48 122.38
R-1 3.98 119.51 6.00 119.74 118.48 119.76 119.96 119.74 118.92
R-2 6.15 118.92 7.30 118.92 2.00 4.00 10.00 16.00 17.30
R-3 7.90 118.92 122.38
121.04 122.38
59000 C 119.67 59000.00 119.97 0.00 2009.82 2003.59 6.22
L-1 4.30 119.60 6.00 119.77 118.54 118.54 119.60 119.67 119.59 118.91 118.91
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-2 6.00 118.54 7.90 118.54 0.00 3.00 4.70 9.00 13.00 15.00 16.80
L-3 9.00 118.54 122.38
R-1 4.00 119.59 6.00 119.75 118.54 119.77 119.97 119.75 118.91
R-2 6.00 118.91 7.30 118.91 1.10 3.00 9.00 15.00 16.30
R-3 7.80 118.91 122.38
121.04 122.38
59050 C 119.62 59050.00 119.92 0.00 2363.17 2353.55 9.62
L-1 4.00 119.48 6.00 119.72 118.15 118.15 119.48 119.62 119.55 118.15 118.15
L-2 6.00 118.15 8.40 118.15 0.00 3.80 5.80 9.80 13.80 15.85 19.80
L-3 9.80 118.15 122.38
R-1 4.00 119.55 6.00 119.70 118.15 119.72 119.92 119.70 118.15
R-2 6.05 118.15 8.40 118.15 1.40 3.80 9.80 15.80 18.20
R-3 10.00 118.15 122.38
121.04 122.38
59100 C 119.64 59100.00 119.94 0.00 2033.13 2025.46 7.67
L-1 3.50 119.44 6.00 119.74 118.59 118.59 119.44 119.64 119.60 118.68 118.68
L-2 5.10 118.59 7.80 118.59 0.00 3.40 5.00 8.50 12.70 14.10 17.00
L-3 8.50 118.59 122.38
R-1 4.20 119.60 6.00 119.72 118.59 119.74 119.94 119.72 118.68
R-2 5.60 118.68 7.60 118.68 0.70 2.50 8.50 14.50 16.10
R-3 8.50 118.68 122.38
121.04 122.38
59150 C 119.90 59150.00 120.20 0.00 2392.37 2382.33 10.04
L-1 4.00 119.70 6.00 120.00 118.39 118.39 119.70 119.90 119.81 118.53 118.53
L-2 6.00 118.39 8.50 118.39 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 118.39 122.38
R-1 3.50 119.81 6.00 119.98 118.39 120.00 120.20 119.98 118.53
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-2 6.00 118.53 8.20 118.53 2.50 5.00 11.00 17.00 19.20
R-3 9.00 118.53 122.38
121.04 122.38
59200 C 119.83 59200.00 120.13 0.00 2392.16 2384.49 7.67
L-1 4.00 119.71 6.00 119.93 118.59 118.59 119.71 119.83 119.74 118.74 118.74
L-2 6.05 118.59 8.10 118.59 0.00 3.95 6.00 10.00 13.98 16.15 20.00
L-3 10.00 118.59 122.38
R-1 3.98 119.74 6.00 119.91 118.59 119.93 120.13 119.91 118.74
R-2 6.15 118.74 7.80 118.74 1.90 4.00 10.00 16.00 17.80
R-3 10.00 118.74 122.38
121.04 122.38
59250 C 119.65 59250.00 119.95 0.00 2127.37 2119.57 7.80
L-1 4.30 119.51 6.00 119.75 118.21 118.21 119.51 119.65 119.59 118.69 118.69
L-2 6.00 118.21 8.40 118.21 0.00 4.00 5.70 10.00 14.00 16.00 17.80
L-3 10.00 118.21 122.38
R-1 4.00 119.59 6.00 119.73 118.21 119.75 119.95 119.73 118.69
R-2 6.00 118.69 7.60 118.69 1.60 4.00 10.00 16.00 17.60
R-3 7.80 118.69 122.38
121.04 122.38
59300 C 119.59 59300.00 119.89 0.00 1889.96 1883.44 6.52
L-1 4.00 119.44 6.00 119.69 118.63 118.63 119.44 119.59 119.58 118.59 118.59
L-2 6.00 118.63 7.60 118.63 0.00 1.80 3.80 7.80 11.80 13.85 15.80
L-3 7.80 118.63 122.38
R-1 4.00 119.58 6.00 119.67 118.63 119.69 119.89 119.67 118.59
R-2 6.05 118.59 7.70 118.59 0.20 1.80 7.80 13.80 15.50
R-3 8.00 118.59 122.38
121.04 122.38
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
59350 C 119.99 59350.00 120.29 0.00 2038.66 2028.28 10.38
L-1 3.50 119.55 6.00 120.09 118.69 118.69 119.55 119.99 119.99 118.59 118.59
L-2 5.10 118.69 8.10 118.69 0.00 3.40 5.00 8.50 12.70 14.10 17.00
L-3 8.50 118.69 122.38
R-1 4.20 119.99 6.00 120.07 118.69 120.09 120.29 120.07 118.59
R-2 5.60 118.59 8.30 118.59 0.40 2.50 8.50 14.50 16.80
R-3 8.50 118.59 122.38
121.04 122.38
59400 C 119.91 59400.00 120.21 0.00 2394.05 2386.43 7.62
L-1 4.00 119.76 6.00 120.01 118.89 118.89 119.76 119.91 120.02 118.59 118.59
L-2 6.00 118.89 7.70 118.89 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 118.89 122.38
R-1 3.50 120.02 6.00 119.99 118.89 120.01 120.21 119.99 118.59
R-2 6.00 118.59 8.20 118.59 3.30 5.00 11.00 17.00 19.20
R-3 9.00 118.59 122.38
121.04 122.38
59450 C 119.39 59450.00 119.69 0.00 2384.40 2377.99 6.41
L-1 4.00 119.18 6.00 119.49 118.34 118.34 119.18 119.39 119.38 118.70 118.70
L-2 6.00 118.34 7.80 118.34 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 118.34 122.38
R-1 3.50 119.38 6.00 119.47 118.34 119.49 119.69 119.47 118.70
R-2 6.00 118.70 7.20 118.70 3.20 5.00 11.00 17.00 18.20
R-3 9.00 118.70 122.38
121.04 122.38
59500 C 120.81 59500.00 121.11 0.00 2411.46 2403.60 7.86
L-1 4.00 120.67 6.00 120.91 119.48 119.48 120.67 120.81 120.80 119.81 119.81
L-2 6.00 119.48 8.20 119.48 0.00 5.00 7.00 11.00 14.50 17.00 20.00
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-3 11.00 119.48 122.38
R-1 3.50 120.80 6.00 120.89 119.48 120.91 121.11 120.89 119.81
R-2 6.00 119.81 7.70 119.81 2.80 5.00 11.00 17.00 18.70
R-3 9.00 119.81 122.38
115.14 116.58
59550 C 114.55 59550.00 114.85 0.00 2286.56 2278.53 8.03
L-1 4.00 114.37 6.00 114.65 113.41 113.41 114.37 114.55 114.54 113.34 113.34
L-2 6.00 113.41 7.90 113.41 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 113.41 116.78
R-1 3.50 114.54 6.00 114.63 113.41 114.65 114.85 114.63 113.34
R-2 6.00 113.34 8.00 113.34 3.10 5.00 11.00 17.00 19.00
R-3 9.00 113.34 116.78
115.64 116.78
59600 C 113.95 59600.00 114.25 0.00 2273.95 2264.39 9.56
L-1 4.00 113.61 6.00 114.05 112.64 112.64 113.61 113.95 113.87 112.64 112.64
L-2 6.00 112.64 8.20 112.64 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 112.64 116.78
R-1 3.50 113.87 6.00 114.03 112.64 114.05 114.25 114.03 112.64
R-2 6.00 112.64 8.10 112.64 2.80 5.00 11.00 17.00 19.10
R-3 9.00 112.64 116.78
115.64 116.78
59650 C 115.54 59650.00 115.84 0.00 2305.30 2295.16 10.14
L-1 4.00 115.33 6.00 115.64 114.12 114.12 115.33 115.54 115.39 114.10 114.10
L-2 6.00 114.12 8.30 114.12 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 114.12 116.78
R-1 3.50 115.39 6.00 115.62 114.12 115.64 115.84 115.62 114.10
R-2 6.00 114.10 8.30 114.10 2.70 5.00 11.00 17.00 19.30
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-3 9.00 114.10 116.78
115.64 116.78
59700 C 114.92 59700.00 115.22 0.00 2293.50 2284.10 9.40
L-1 4.00 114.70 6.00 115.02 113.69 113.69 114.70 114.92 114.79 113.52 113.52
L-2 6.00 113.69 8.00 113.69 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 113.69 116.78
R-1 3.50 114.79 6.00 115.00 113.69 115.02 115.22 115.00 113.52
R-2 6.00 113.52 8.30 113.52 3.00 5.00 11.00 17.00 19.30
R-3 9.00 113.52 116.78
115.64 116.78
59750 C 114.15 59750.00 114.45 0.00 2278.98 2270.70 8.28
L-1 4.00 114.00 6.00 114.25 113.18 113.18 114.00 114.15 114.04 112.79 112.79
L-2 6.00 113.18 7.70 113.18 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 113.18 116.78
R-1 3.50 114.04 6.00 114.23 113.18 114.25 114.45 114.23 112.79
R-2 6.00 112.79 8.20 112.79 3.30 5.00 11.00 17.00 19.20
R-3 9.00 112.79 116.78
115.64 116.78
59800 C 113.29 59800.00 113.59 0.00 2262.06 2255.05 7.01
L-1 4.00 113.10 6.00 113.39 112.18 112.18 113.10 113.29 113.18 112.52 112.52
L-2 6.00 112.18 7.90 112.18 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 112.18 116.78
R-1 3.50 113.18 6.00 113.37 112.18 113.39 113.59 113.37 112.52
R-2 6.00 112.52 7.30 112.52 3.10 5.00 11.00 17.00 18.30
R-3 9.00 112.52 116.78
115.64 116.78
59850 C 115.41 59850.00 115.71 0.00 2416.28 2405.18 11.09
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
L-1 4.00 115.27 6.00 115.51 114.08 114.08 115.27 115.41 115.40 113.49 113.49
L-2 6.00 114.08 8.20 114.08 0.00 5.00 7.00 11.00 14.50 17.00 21.00
L-3 11.00 114.08 116.78
R-1 3.50 115.40 6.00 115.49 114.08 115.51 115.71 115.49 113.49
R-2 6.00 113.49 9.00 113.49 2.80 5.00 11.00 17.00 20.00
R-3 10.00 113.49 116.78
115.64 114.28
59900 C 114.55 59900.00 114.85 0.00 2288.14 2282.13 6.01
L-1 4.00 114.37 6.00 114.65 113.72 113.72 114.37 114.55 114.54 113.75 113.75
L-2 6.00 113.72 7.40 113.72 0.00 5.00 7.00 11.00 14.50 17.00 20.00
L-3 11.00 113.72 116.78
R-1 3.50 114.54 6.00 114.63 113.72 114.65 114.85 114.63 113.75
R-2 6.00 113.75 7.40 113.75 3.60 5.00 11.00 17.00 18.40
R-3 9.00 113.75 116.78
115.64 116.78
59950 C 113.95 59950.00 114.25 0.00 2049.13 2041.84 7.28
L-1 3.95 113.84 6.00 114.05 112.89 112.89 113.84 113.95 113.87 112.75 112.75
L-2 6.50 112.89 7.80 112.89 0.00 3.00 5.55 9.50 13.50 15.50 18.00
L-3 9.50 112.89 116.78
R-1 4.00 113.87 6.00 114.03 112.89 114.05 114.25 114.03 112.75
R-2 6.00 112.75 8.00 112.75 1.70 3.50 9.50 15.50 17.50
R-3 8.50 112.75 116.78
115.64 115.28
60000 C 113.95 60000.00 114.25 0.00 2038.42 2032.00 6.41
L-1 4.05 113.74 6.00 114.05 113.12 113.12 113.74 113.95 113.87 113.01 113.01
L-2 5.95 113.12 7.40 113.12 0.00 3.50 5.40 9.45 13.40 15.57 17.90
L-3 9.45 113.12 115.78
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Datum L-3 L-2 L-1 C R-1 R-2 R-3 F.A I.A N.A
Distance R.L Distance R.L
R-1 3.95 113.87 6.00 114.03 113.12 114.05 114.25 114.03 113.01
R-2 6.12 113.01 7.60 113.01 2.05 3.45 9.45 15.45 17.05
R-3 8.45 113.01 113.01
113.01 113.01

JUNIOR ENGINEER ASST.EXECUTIVE ENGINEER EXECUTIVE ENGINEER


R&B DIVISION R&B DIVISION R&B DIVISION
BOUDH BOUDH BOUDH
ESTIMATE FOR CONSTRUCTION OF C.D ( H.P.C-Singlee row - 1000mm dia)
#REF! ###
Package NO #REF!
Sl. No. of
Item of Work No. Length Bredth Height Quantity Rate (Rs.) Amount (Rs.)
No. C.D.
1 2 3 4 5 6 7 8 9
1 Earth work in excavation of foundation of structures as per
drawing and technical specification including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious matter, dressing of sides and bottom and back
filling with approved material as per Specification & Technical
Clause 304.
Head Walls 2 5.00 1.50 1.05 = 0.00 cum
Pipe Portion 1 4.65 2.00 0.90 = 0.00 cum
D/S appron 1 4.85 2.00 0.225 = 0.00 cum
U/S Appron 1 4.85 1.50 0.225 = 0.00 cum
Collar joint 2 2.00 0.200 0.150 = 0.00 cum
Revetment 4 5.00 1.000 1.000 0.00 cum
Total = 0.00 cum @Rs. 85.56 / cum = Rs. 0.00
2 Sand Filling in Foundation Trenches as per Drawing & Technical

Specification Clause 305.3.9.


Below Head Wall 2 5.00 1.50 0.20 = 0.00 cum
Below Pipes 1 (5.03+5.19)/2 2.00 0.20 = 0.00 cum
in between head walls (encasing pipe) 1 (5.31+6.47)/2 2.20 1.10 = 0.00 cum
Deduct Pipes av length = (5.31+6.24)/2=5.775 1 5.775 0.785 1.44 = 0.00 cum
Pipe Joints 2 2.000 0.200 1.50 = 0.00 cum
Add pipe in collar jt portion 2 (22/7)/4 1.440 0.20 = 0.00 cum
Sl. No. of
Item of Work No. Length Bredth Height Quantity Rate (Rs.) Amount (Rs.)
No. C.D.
1 2 3 4 5 6 7 8 9
Revetment 4 5.00 1.000 0.150 0.00 cum
Total = 0.00 cum @Rs. 256.04 / cum = Rs. 0.00
3 Providing P C.C. in foundation upto 1.5 m below bed level with
nominal size H.G. metal in openfoundation including laying in
position & compacting by using vibrator including shuttering,
cost, conveyance, T&P articles as per MORD Specification and
direction of E.I.C.
P.C.C. grade M-15 (Nominal mix 1:2.5:5)
Head Wall 2 5.00 1.50 0.15 = 0.00 cum
Below Pipe 1 5.25 2.00 0.15 = 0.00 cum
Pipe portion 2 2.00 0.20 0.15 = 0.00 cum
Revetment 4 5.00 1.000 0.150 0.00 cum
Total = 0.00 cum @Rs. 3122.48 / cum = Rs. 0.00
4 Providing P C.C. in sub-structure upto 1.5 m below bed level
with nominal size H.G. metal in openfoundation including laying
in position & compacting by using vibrator including shuttering,
cost, conveyance, T&P articles as per MORD Specification and
direction of E.I.C.
P.C.C. grade M-15 (Nominal mix (1:2.5:5))
Head Wall Av width = (1.35+ 0.40)/2 = 0.875 2 4.85 0.875 2.45 = 0.00 cum
Joints of Pipe 2 2.00 1.70 0.20 = 0.00 cum
Parapet 2 4.85 0.40 0.40 = 0.00 cum
Deduction for pipe from head wall Av width of
2 0.785 1.44 0.865 = 0.00 cum
wall = (1.097+0.632)/2 = 0.865
Deduction for pipe from collar joint 2 0.785 1.44 0.200 = 0.00 cum
Revetment 4 5.00 0.650 1.600 0.00 cum
Sl. No. of
Item of Work No. Length Bredth Height Quantity Rate (Rs.) Amount (Rs.)
No. C.D.
1 2 3 4 5 6 7 8 9
Total = 0.00 cum @Rs. 3272.92 / cum = Rs. 0.00

5 Laying Reinforced Cement Concrete Pipe NP3/ Prestressed


concrete pipe for culverts on first class bedding of granular
material in single row including fixing collar with cement mortar
1:2 but excluding excavation, protection works, back filling,
concrete and masonry works in head walls and parapets as per
Technical Specification Clause 1100.
1000mm dia NP3 Hume pipes 1 7.50 = 0.00 mtr @Rs. 3590.74 / mtr = Rs. 0.00
6 Providing & laying boulder apron for bed protection with stone
boulders of minimum size & weight as portable 1300.1Weighing
not less than 25 kg laid dry complete as per drawing & technical
clauses 1301
U/S approns 1 4.85 1.50 0.225 = 0.00 cum
D/S approns 1 4.85 2.00 0.225 = 0.00 cum
Revetment (Conical Portion) 4 2*22/7*1.5/8 2.34 0.225 = 0.00 cum
Deduct 1/6 th voids = 0.00 cum
Total = 0.00 cum @Rs. 730.42 / cum = Rs. 0.00
Total = Rs. 0.00
Total for 0 nos of CD works

#REF! #REF! ###


#REF! #REF! ###
Sl. No. of
Item of Work No. Length Bredth Height Quantity Rate (Rs.) Amount (Rs.)
No. C.D.
1 2 3 4 5 6 7 8 9
#REF! #REF! ###
ESTIMATE FOR CONSTRUCTION OF DRAIN
#REF! ###
#REF!
Sl No Description of item No Length Width (in M) Thickness Unit Quantity Rate (in Amount (in
(In M) (in M) Rs) Rs)
1 Excavation of structure
Earth work in excavation for structures as per drawing and technical
specification clause 305.1 including setting out construction of
shoring & bracing removal of stumps and other deleterious material
and disposal up to a lead of 50mtr, dressing of sides and bottm and
back filling in trenches with excavated suitable material.

Drain 1 0.00 (0.60+0.40)/2 0.400 cum 0.000 85.56 0.00

Filling sand in foundation in trenches as per drawing and technical


2 specification clause 305.3.9 1 0.00 (0.60+0.40)/2 0.100 cum 0.000 256.04 0.00
3 Providing Concrete for Plain/ reinforced concrete in open foundation
complete as per drawing and technical specifications Clauses
802,803,1202 & 1203

P.C.C. grade M-20 (Nominal mix 1:2:4)


Bottom concrete 1 0.00 0.500 0.100 cum 0.000
Side 2 0.00 0.223 0.100 cum 0.000
Total Total 0.000 3866.64 0.00
Total 0.00

#REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
ESTIMATE FOR CONSTRUCTION OF C.D. ( H.P.C-single row - 600mm dia)
#REF! ###
Package No- #REF!
Sl. No of Length (In Width Thickness Rate Amount
Description of item No Unit Quantity
No CD m) (in m) (in m) (in Rs) (in Rs)
1 Excavation of structure
Earth work in excavation for structures as per drawing and technical
specification clause 305.1 including setting out construction of shoring &
bracing removal of stumps and other deleterious material and disposal up
Head Wall 2 3.48 1.400 0.90 cum 0.00
to a lead of 50mtr, dressing of sides and bottm and back filling in
Pipe portion
trenches with excavated suitable material. 1 4.85 1.360 0.90 cum 0.00
Head Wall 2 3.48 1.400 0.90 cum 0.00
Pipe portion 1 4.85 1.360 0.90 cum 0.00
Head Wall 2 3.48 1.400 0.90 cum 0.00
Pipe portion 1 4.85 1.360 0.90 cum 0.00
0.00 142.53 0.00
2) Filling sand in foundation in trenches as per drawing and technical
specification clause 305.3.9
Below Head wall 2 3.48 1.400 0.10 cum 0.00
Below pipe 1 5.35 1.360 0.10 cum 0.00
Below Head wall 2 3.48 1.400 0.10 cum 0.00
Below pipe 1 5.35 1.360 0.10 cum 0.00
Below Head wall 2 3.48 1.400 0.15 cum 0.00
Below pipe 1 5.35 1.360 0.15 cum 0.00
Total 0.00 448.38 0.00
3) Providing Concrete for Plain/ reinforced concrete in open foundation
complete as per drawing and technical specifications Clauses
802,803,1202 & 1203
P.C.C. grade M-15 (Nominal mix 1:2.5:5)
Head Wall 2 3.48 1.400 0.10 cum 0.00
Sl. No of Length (In Width Thickness Rate Amount
Description of item No Unit Quantity
No CD m) (in m) (in m) (in Rs) (in Rs)
Below pipe 1 5.50 1.360 0.10 cum 0.00
Head Wall 2 3.48 1.400 0.10 cum 0.00
Below pipe 1 5.50 1.360 0.10 cum 0.00
Head Wall 2 3.48 1.400 0.15 cum 0.00
Below pipe 1 5.50 1.360 0.15 cum 0.00
Net 0.00 3653.59 0.00

4 Providing Concrete for Plain/ reinforced concrete in sub-structure


complete as per drawing and technical specifications Clauses
802,803,1202 & 1203
P.C.C. grade M-15 (Nominal mix (1:2.5:5))
Head Wall 2 3.33 0.825 1.90 cum 0.00
Pipe Joint 2 1.36 1.310 0.20 cum 0.00
Parapet 2 3.33 0.400 0.40 cum 0.00
Deduction for pipe portion in collor joint 2 π/4 (0.76)2 0.20 cum 0.00
Deduction for pipe portion in Head Wall
2 π/4 (0.76)2 (0.65+0.975)/2 cum 0.00
Head Wall 2 3.33 0.825 1.85 cum 0.00
Pipe Joint 2 1.36 1.310 0.20 cum 0.00
Parapet 2 3.33 0.400 0.40 cum 0.00
Deduction for pipe portion in collor joint 2 π/4 (0.76)2 0.20 cum 0.00
Deduction for pipe portion in Head Wall
2 π/4 (0.76)2 (0.65+0.975)/2 cum 0.00
Head Wall 2 3.33 0.825 1.85 cum 0.00
Pipe Joint 2 1.36 1.310 0.20 cum 0.00
Parapet 2 3.33 0.400 0.40 cum 0.00
Deduction for pipe portion in collor joint 2 π/4 (0.76)2 0.20 cum 0.00
Sl. No of Length (In Width Thickness Rate Amount
Description of item No Unit Quantity
No CD m) (in m) (in m) (in Rs) (in Rs)
Deduction for pipe portion in Head Wall
2 π/4 (0.76)2 (0.65+0.975)/2 cum 0.00
Total cum 0.00 3842.13 0.00
5 Providing and laying reinforced cement concrete pipe 600mm dia Np3 as
per specification.
Providing and laying reinforced cement concrete pipe Np3 for culverts
on 1st class bedding of granular material including fixing collar with
cement mortar 1:2 as per clause 1106
3 2.50 metre 0.00
3 2.50 metre 0.00
3 2.50 metre 0.00
metre 0.00 1730.08 0.00
Total 0.00

#REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
ESTIMATE FOR CONSTRUCTION OF
4 x 6.77 m span RCC SLAB CULVERT
#REF! ###
#REF!
No. of
Sl. No. Description of Item Culvert No Length Bredth Hight Unit Qnty. Rate Amount
1 2 3 5 6 7 8 9 10 11

2 Earth work in excavation for structures as per drawing and


technical specification clause 305.1 including setting out
construction of shoring & bracing removal of stumps and
Over Burdden 1 27.88 15.50 0.50 Cum. 0.00
other deleterious material and disposal up to a lead of 50mtr,
AR
dressing of sides and bottom and back filling in trenches with 1 7.90 3.81 1.00 Cum. 0.00
excavated
P3 suitable material. 1 11.31 2.40 1.00 Cum. 0.00
AL 1 7.90 3.81 1.00 Cum. 0.00
wing Wall 2 5.00 1.80 1.50 Cum. 0.00
P1 & P2 2 11.31 2.40 1.00 Cum. 0.00
U/S Appron 1 27.88 1.00 1.50 Cum. 0.00
D/S Appron 1 27.88 1.00 1.80 Cum. 0.00
Bed 1 27.08 15.50 0.45 Cum. 0.00
0.00 142.53 0.00

3 Filling sand in foundation trenches as per drawing and


technical specification clause 305.3.9
AL/AR 2 5.70 1.90 2.40 Cum. 0.00
Wing Walls 2 5.00 1.20 1.80 Cum. 0.00
Bed 1 27.08 15.50 0.15 Cum. 0.00
3 9.08 1.58 0.15 Cum. 0.00
0.00 368.75 0.00

4 Providing Concrete for Plain/ reinforced concrete in open


foundation (1:3:6) complete as per drawing and technical
specifications Clauses 802,803,1202 & 1203
Foundation including dewatering
No. of
Sl. No. Description of Item Culvert No Length Bredth Hight Unit Qnty. Rate Amount
1 2 3 5 6 7 8 9 10 11
AR 1 7.80 3.81 0.20 Cum. 0.00
P3 1 11.31 2.40 0.20 Cum. 0.00
AP 1 7.80 3.81 0.20 Cum. 0.00
Wing Wall 2 5.00 1.80 0.20 Cum. 0.00
P1 & P2 2 11.31 2.40 0.20 Cum. 0.00
U/S cut off 1 33.08 1.00 0.20 Cum. 0.00
D /S cut off 1 37.08 1.00 0.20 Cum. 0.00
U/S Apprron 1 27.08 3.00 0.20 Cum. 0.00
D/S Apprron 1 27.08 5.00 0.20 Cum. 0.00
1 27.08 15.50 0.20 Cum. 0.00
1 63.30 1.00 0.15 Cum. 0.00
1 12.00 1.00 0.15 Cum. 0.00
1 176.40 3.75 0.075 Cum. 0.00
Cum. 0.00 3758.76 0.00

5 Providing Concrete for Plain/ reinforced concrete in Open


Foundation complete as per drawing and technical
specifications
PCC Grade M-15 Clauses 802,804,805,806,807,1202 & 1204
With Dewatering and frame work upto bed level
AR 1 7.50 2.99 1.80 Cum. 0.00
P3 1 8.25 1.788 1.800 Cum. 0.00
AL 1 7.50 2.99 1.800 Cum. 0.00
Wing walls 2 5.00 1.200 1.30 Cum. 0.00
P1 & P2 2 8.25 1.788 1.80 Cum. 0.00
0.00 3765.57 0.00
Providing Concrete for Plain/ reinforced concrete in Open
Foundation complete as per drawing and technical
specifications Clauses 802,804,805,806,807,1202 & 1204
PCC Grade M-15
Superstructure
No. of
Sl. No. Description of Item Culvert No Length Bredth Hight Unit Qnty. Rate Amount
1 2 3 5 6 7 8 9 10 11
AR 1 0.00 2.32 1.20 Cum. 0.00
P3 1 9.65 1.000 3.300 Cum. 0.00
AR 1 7.50 1.63 3.300 Cum. 0.00
AL 1 7.50 1.63 3.300 Cum. 0.00
Wing walls 2 5.00 0.700 3.33 Cum. 0.00
P1 & P2 2 9.65 1.000 3.30 Cum. 0.00
0.00 3954.11 0.00
7 Providing Concrete for Plain/ reinforced concrete in
Superstructure complete as per drawing and technical
specifications
RCC M-25 Clauses 802,804,805,806,807,1202 & 1204
Abutment cap 2 7.50 0.60 0.200 Cum. 0.00
Pier Cap 3 9.66 0.20 1.000 Cum. 0.00
Dirt wall 2 7.50 0.30 0.480 Cum. 0.00
Deck slab 2 6.77 7.50 0.480 Cum. 0.00
1 6.77 7.50 0.480 Cum. 0.00
1 6.77 7.50 0.480 Cum. 0.00
Kerb Wall 2 27.08 0.48 0.275 Cum. 0.00
Cum. 0.00 5885.66 0.00
Providing Concrete for Plain/ reinforced concrete in
Superstructure complete as per drawing and technical
specifications Clauses 802,804,805,806,807,1202 & 1204
RCC M-25
Railing 2 2.00 27.08 Cum. 0.00
Cum. 0.00 2663.84 0.00
8 Providing and laying CC wearing course M-30 grade
including reinforcement complete as per drawing and
technical specification clauses 800 and 1206.3
Wearing coarse 4 6.77 6.50 0.075 Cum. 0.00 11513.97 0.00
9 Providing weep holes in brick masonry/stone masonry,
plain/reinforced concrete abutment, wing wall, return wall with
100 mm dia AC pipe extending through the full width of the
Abutment 20 nos 0.00
structures with slope of 1(V):20(H) towards drawing face
Wing walls 6 nos 0.00
complete as per drawing and MORD technical specification
No. of
Sl. No. Description of Item Culvert No Length Bredth Hight Unit Qnty. Rate Amount
1 2 3 5 6 7 8 9 10 11
Total nos 0.00 188.10 0.00
10 Providing and laying filter media with granular crushed
aggregates as per specification to a thickness of not less than
600mm with smaller size towards the wall and providing over
Wing walls
the entire surface behing abutment, wing wall, return wall to 2 5.70 3.00 0.60 Cum. 0.00
the full height, compacted to firm condition complete as per 0.000 963.56 0.00
12 drawing and
Providing technicalfor
Concrete specification
Plain/ reinforced concrete in open
foundation complete as per drawing and technical
specifications
PCC Grade M-20 Clauses 802,803,1202 & 1203
(1:2:4)
U/S Apprron 1 27.08 3.00 0.10 Cum. 0.00
D/S Apprron 1 27.08 5.00 0.100 Cum. 0.00
Bed 1 27.080 7.50 0.100 Cum. 0.00
3 9.080 1.58 0.150 Cum. 0.00
Cum. 0.00 4632.92 0.00

13 Supplying, fitting and placing HYSD bar reinforcement in


foundation complete as per drawings and technical
specifications
Foundation (super structure) Mt 0.00
Mt 0.00
Mt 0.000
Mt 0.000 67952.98 0.00

Super Structure Mt 0.00


Mt 0.00
Mt 0.000
Mt 0.00
Mt 0.00
Mt 0.00
Mt 0.00
Wearing Coat Mt 0.000
Mt 0.000 68593.83 0.00
No. of
Sl. No. Description of Item Culvert No Length Bredth Hight Unit Qnty. Rate Amount
1 2 3 5 6 7 8 9 10 11
7 Providing and laying boulder appron for bed protection with
stone boulders of minimum size and weight as per table
1300.1, no fragment weighing not less than 25kg laid dry
Lastala sid U/S Approns 1 12.00 5.667 0.300 cum 0.00
complete as per drawing and technical specification clause
D/S Approns
1301. with departmental stone 1 21.30 5.167 0.300 cum 0.00
U/S Approns 1 22.00 5.833 0.300 cum 0.00
D/S Approns 1 20.00 5.667 0.300 cum 0.00
Total cum 0.00 957.09 0.00

Total 0.00

Junior Engineer Asst. Executive Engineer Executive Engineer


R.W. Section R.W. Sub-Division R.W. Division
Puintala Bolangir Bolangir
ESTIMATE FOR CONSTRUCTION OF DRAIN
#REF! ###
#REF!
Sl No Description of item No Length Width (in M) Thickness Unit Quantity Rate (in Amount (in
(In M) (in M) Rs) Rs)
1 Excavation of structure
Earth work in excavation for structures as per drawing and technical
specification clause 305.1 including setting out construction of
shoring & bracing removal of stumps and other deleterious material
and disposal up to a lead of 50mtr, dressing of sides and bottm and
back filling in trenches with excavated suitable material.

Drain 1 (0.60+0.40)/2 0.400 cum 0.000 85.56 0.00

Filling sand in foundation in trenches as per drawing and technical


2 specification clause 305.3.9 1 (0.60+0.40)/2 0.100 cum 0.000 256.04 0.00
3 Providing Concrete for Plain/ reinforced concrete in open foundation
complete as per drawing and technical specifications Clauses
802,803,1202 & 1203

P.C.C. grade M-20 (Nominal mix 1:2:4)


Bottom concrete 1 0.500 0.100 cum 0.000
Side 2 0.223 0.100 cum 0.000
Total Total 0.000 3866.64 0.00
Total 0.00

#REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
ESTIMATE FOR CONSTRUCTION OF C.D. ( H.P.C-single row - 600mm dia)
#REF! ###
Package No- #REF!

Sl. No of Length (In Width Thickness Rate Amount


Description of item No Unit Quantity
No CD m) (in m) (in m) (in Rs) (in Rs)

1 Excavation of structure
Earth work in excavation for structures as per drawing and technical
specification clause 305.1 including setting out construction of shoring &
bracing removal of stumps and other deleterious material and disposal up
to a lead of 50mtr, dressing of sides and bottm and back filling in 1 1.00 cum 0.00
trenches with excavated suitable material. 1 1.00 cum 0.00
1 1.00 cum 0.00
1 1.00 cum 0.00
1 1.00 cum 0.00
1 1.00 cum 0.00
1 1.00 cum 0.00
0.00 142.53 0.00
2) Filling sand in foundation in trenches as per drawing and technical
specification clause 305.3.9
1 1 0.10 cum 0.00
1 1 0.10 cum 0.00
1 1 0.10 cum 0.00
1 1 0.10 cum 0.00
1 1 0.10 cum 0.00
1 1 0.10 cum 0.00
1 1 0.10 cum 0.00
0.10 cum 0.00
Total 0.00 547.91 0.00
Sl. No of Length (In Width Thickness Rate Amount
Description of item No Unit Quantity
No CD m) (in m) (in m) (in Rs) (in Rs)

3) Providing Concrete for Plain/ reinforced concrete in open foundation


complete as per drawing and technical specifications Clauses
802,803,1202 & 1203
P.C.C. grade M-15 (Nominal mix 1:2.5:5)
1 1 1.20 cum 0.00
1 1 1.20 cum 0.00
1 1 1.20 cum 0.00
1 1 1.20 cum 0.00
1 1 1.20 cum 0.00
1 1 1.20 cum 0.00
1 1 1.20 cum 0.00
0.00 3699.88 0.00

4 Providing Concrete for Plain/ reinforced concrete in sub-structure


complete as per drawing and technical specifications Clauses
802,803,1202 & 1203
P.C.C. grade M-15 (Nominal mix (1:2.5:5))
Extension of Slab culvert at 1/300 1 cum 0.00
1 cum 0.00
1 cum 0.00
Total cum 0.00 3888.42 0.00

6 Construction of toe walls for protection with dry stone masonary with
stone boulders of minimum size and weight as per drawing and technical
specification Clause 1302.5
Revetment Toe Wall 4 0.60 1.00 cum 0.00 1046.83 0.00
7 Providing and laying boulder appron for bed protection with stone
boulders of minimum size and weight as per table 1300.1, no fragment
weighing not less than 25kg laid dry complete as per drawing and
technical specification clause 1301. with departmental stone
Sl. No of Length (In Width Thickness Rate Amount
Description of item No Unit Quantity
No CD m) (in m) (in m) (in Rs) (in Rs)

U/S Approns 1 3.33 1.500 0.300 cum 0.00


D/S Approns 1 3.33 2.000 0.300 cum 0.00
Revetment (Conical Portion) Area = 1/2 * (2*π*R )/4 * H 4 1/2 * (2*π*1.50 )/4 0.300 cum 0.00
Total * 2.02 0.00
Less 1/6th voids 0.00
0.00 730.42 0.00
Total 0.00

#REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
ESTIMATE FOR CONSTRUCTION OF C.D. ( H.P.C-single row - 600mm dia)
#REF! ###
Package No- #REF!

Sl. No of Length (In Width Thickness Rate Amount


Description of item No Unit Quantity
No CD m) (in m) (in m) (in Rs) (in Rs)

1 Excavation of structure
Earth work in excavation for structures as per drawing and technical
specification clause 305.1 including setting out construction of shoring &
bracing removal of stumps and other deleterious material and disposal up
to a lead of 50mtr, dressing of sides and bottm and back filling in
trenches with excavated suitable material.

Head Wall at 0/960, 2 3.48 1.400 0.95 cum 0.00


Pipe portion 1 4.85 1.360 0.95 cum 0.00
0.00 142.53 0.00
2) Filling sand in foundation in trenches as per drawing and technical
specification clause 305.3.9
Below Head wall 2 3.48 1.400 0.15 cum 0.00
Below pipe 1 5.35 1.360 0.15 cum 0.00
Total 0.00 547.91 0.00
3) Providing Concrete for Plain/ reinforced concrete in open foundation
complete as per drawing and technical specifications Clauses
802,803,1202 & 1203
P.C.C. grade M-15 (Nominal mix 1:2.5:5)
Head Wall 2 3.48 1.400 0.15 cum 0.00
Below pipe 1 5.50 1.360 0.15 cum 0.00
Net 0.00 3699.88 0.00
Sl. No of Length (In Width Thickness Rate Amount
Description of item No Unit Quantity
No CD m) (in m) (in m) (in Rs) (in Rs)

4 Providing Concrete for Plain/ reinforced concrete in sub-structure


complete as per drawing and technical specifications Clauses
802,803,1202 & 1203
P.C.C. grade M-15 (Nominal mix (1:2.5:5))
Head Wall 2 3.33 0.825 2.01 cum 0.00
Pipe Encasing 2 1.36 1.310 0.20 cum 0.00
Parapet 2 3.33 0.400 0.40 cum 0.00
Deduction for pipe portion in collor joint 2 π/4 (0.76)2 0.20 cum 0.00
Deduction for pipe portion in Head Wall
2 π/4 (0.76)2 (0.65+0.975)/2 cum 0.00
Total cum 0.00 3888.42 0.00
5 Providing and laying reinforced cement concrete pipe 600mm dia Np3 as
per specification.
Providing and laying reinforced cement concrete pipe Np3 for culverts
on 1st class bedding of granular material including fixing collar with
cement mortar 1:2 as per clause 1106
3 2.50 metre 0.00 1736.54 0.00
Total for 0 nos of CD works Total 0.00

#REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
ESTIMATE FOR CONSTRUCTION OF DRAIN
#REF! ###
#REF!
Sl No Description of item No Length Width (in M) Thickness Unit Quantity Rate (in Amount (in
(In M) (in M) Rs) Rs)
1 Excavation of structure
Earth work in excavation for structures as per drawing and technical
specification clause 305.1 including setting out construction of
shoring & bracing removal of stumps and other deleterious material
and disposal up to a lead of 50mtr, dressing of sides and bottm and
back filling in trenches with excavated suitable material.

Drain 1 (0.60+0.40)/2 0.400 cum 0.000 85.56 0.00

Filling sand in foundation in trenches as per drawing and technical


2 specification clause 305.3.9 1 (0.60+0.40)/2 0.100 cum 0.000 256.04 0.00
3 Providing Concrete for Plain/ reinforced concrete in open foundation
complete as per drawing and technical specifications Clauses
802,803,1202 & 1203

P.C.C. grade M-20 (Nominal mix 1:2:4)


Bottom concrete 1 0.500 0.100 cum 0.000
Side 2 0.223 0.100 cum 0.000
Total Total 0.000 3866.64 0.00
Total 0.00

#REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
ESTIMATE FOR CONSTRUCTION OF C.D ( H.P.C-Singlee row - 1000mm dia)
#REF! ###
Package NO #REF!
Sl. No. of
Item of Work No. Length Bredth Height Quantity Rate (Rs.) Amount (Rs.)
No. C.D.
1 2 3 4 5 6 7 8 9
1 Earth work in excavation of foundation of structures as per
drawing and technical specification including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious matter, dressing of sides and bottom and back
filling with approved material as per Specification & Technical
Clause 304.
Head Walls 2 5.00 1.50 1.05 = 0.00 cum
Pipe Portion 1 4.65 2.00 0.90 = 0.00 cum
D/S appron 1 4.85 2.00 0.225 = 0.00 cum
U/S Appron 1 4.85 1.50 0.225 = 0.00 cum
Collar joint 2 2.00 0.200 0.150 = 0.00 cum
Revetment 4 5.00 1.000 1.000 0.00 cum
Total = 0.00 cum @Rs. 85.56 / cum = Rs. 0.00
2 Sand Filling in Foundation Trenches as per Drawing & Technical

Specification Clause 305.3.9.


Below Head Wall 2 5.00 1.50 0.20 = 0.00 cum
Below Pipes 1 (5.03+5.19)/2 2.00 0.20 = 0.00 cum
in between head walls (encasing pipe) 1 (5.31+6.47)/2 2.20 1.10 = 0.00 cum
Deduct Pipes av length = (5.31+6.24)/2=5.775 1 5.775 0.785 1.44 = 0.00 cum
Pipe Joints 2 2.000 0.200 1.50 = 0.00 cum
Add pipe in collar jt portion 2 (22/7)/4 1.440 0.20 = 0.00 cum
Sl. No. of
Item of Work No. Length Bredth Height Quantity Rate (Rs.) Amount (Rs.)
No. C.D.
1 2 3 4 5 6 7 8 9
Revetment 4 5.00 1.000 0.150 0.00 cum
Total = 0.00 cum @Rs. 256.04 / cum = Rs. 0.00
3 Providing P C.C. in foundation upto 1.5 m below bed level with
nominal size H.G. metal in openfoundation including laying in
position & compacting by using vibrator including shuttering,
cost, conveyance, T&P articles as per MORD Specification and
direction of E.I.C.
P.C.C. grade M-15 (Nominal mix 1:2.5:5)
Head Wall 2 5.00 1.50 0.15 = 0.00 cum
Below Pipe 1 5.25 2.00 0.15 = 0.00 cum
Pipe portion 2 2.00 0.20 0.15 = 0.00 cum
Revetment 4 5.00 1.000 0.150 0.00 cum
Total = 0.00 cum @Rs. 3122.48 / cum = Rs. 0.00
4 Providing P C.C. in sub-structure upto 1.5 m below bed level
with nominal size H.G. metal in openfoundation including laying
in position & compacting by using vibrator including shuttering,
cost, conveyance, T&P articles as per MORD Specification and
direction of E.I.C.
P.C.C. grade M-15 (Nominal mix (1:2.5:5))
Head Wall Av width = (1.35+ 0.40)/2 = 0.875 2 4.85 0.875 2.45 = 0.00 cum
Joints of Pipe 2 2.00 1.70 0.20 = 0.00 cum
Parapet 2 4.85 0.40 0.40 = 0.00 cum
Deduction for pipe from head wall Av width of
2 0.785 1.44 0.865 = 0.00 cum
wall = (1.097+0.632)/2 = 0.865
Deduction for pipe from collar joint 2 0.785 1.44 0.200 = 0.00 cum
Revetment 4 5.00 0.650 1.600 0.00 cum
Sl. No. of
Item of Work No. Length Bredth Height Quantity Rate (Rs.) Amount (Rs.)
No. C.D.
1 2 3 4 5 6 7 8 9
Total = 0.00 cum @Rs. 3272.92 / cum = Rs. 0.00

5 Laying Reinforced Cement Concrete Pipe NP3/ Prestressed


concrete pipe for culverts on first class bedding of granular
material in single row including fixing collar with cement mortar
1:2 but excluding excavation, protection works, back filling,
concrete and masonry works in head walls and parapets as per
Technical Specification Clause 1100.
1000mm dia NP3 Hume pipes 1 7.50 = 0.00 mtr @Rs. 3590.74 / mtr = Rs. 0.00
6 Providing & laying boulder apron for bed protection with stone
boulders of minimum size & weight as portable 1300.1Weighing
not less than 25 kg laid dry complete as per drawing & technical
clauses 1301
U/S approns 1 4.85 1.50 0.225 = 0.00 cum
D/S approns 1 4.85 2.00 0.225 = 0.00 cum
Revetment (Conical Portion) 4 2*22/7*1.5/8 2.34 0.225 = 0.00 cum
Deduct 1/6 th voids = 0.00 cum
Total = 0.00 cum @Rs. 730.42 / cum = Rs. 0.00
Total = Rs. 0.00
Total for nos of CD works

#REF! #REF! ###


#REF! #REF! ###
Sl. No. of
Item of Work No. Length Bredth Height Quantity Rate (Rs.) Amount (Rs.)
No. C.D.
1 2 3 4 5 6 7 8 9
#REF! #REF! ###
ESTIMATE FOR CONSTRUCTION OF DRAIN
#REF! ###
#REF!
Sl No Description of item No Length Width (in M) Thickness Unit Quantity Rate (in Amount (in
(In M) (in M) Rs) Rs)
1 Excavation of structure
Earth work in excavation for structures as per drawing and technical
specification clause 305.1 including setting out construction of
shoring & bracing removal of stumps and other deleterious material
and disposal up to a lead of 50mtr, dressing of sides and bottm and
back filling in trenches with excavated suitable material.

Drain 1 (0.60+0.40)/2 0.400 cum 0.000 85.56 0.00

Filling sand in foundation in trenches as per drawing and technical


2 specification clause 305.3.9 1 (0.60+0.40)/2 0.100 cum 0.000 256.04 0.00
3 Providing Concrete for Plain/ reinforced concrete in open foundation
complete as per drawing and technical specifications Clauses
802,803,1202 & 1203

P.C.C. grade M-20 (Nominal mix 1:2:4)


Bottom concrete 1 0.500 0.100 cum 0.000
Side 2 0.223 0.100 cum 0.000
Total Total 0.000 3866.64 0.00
Total 0.00

#REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO
60/000

ABSTRACT

CHAINAGE DIFFERENCE AREA AVERAGE VOLUME


In Sq M In Sq M In Cum
48817 0 9.09
48850 33 7.37 8.23 271.51
48900 50 8.26 7.81 390.56
48950 50 7.10 7.68 383.97
49000 50 12.64 9.87 493.44
49050 50 7.63 10.13 506.54
49100 50 8.56 8.09 404.61
49150 50 8.09 8.32 416.13
49200 50 6.19 7.14 356.95
49250 50 7.24 6.71 335.67
49300 50 11.21 9.23 461.27
49350 50 6.45 8.83 441.64
49400 50 10.53 8.49 424.46
49450 50 13.30 11.91 595.66
49500 50 8.34 10.82 540.89
49550 50 17.17 12.75 637.65
49600 50 5.75 11.46 572.99
49650 50 9.15 7.45 372.48
49700 50 9.33 9.24 461.99
49750 50 10.55 9.94 497.08
49800 50 15.60 13.08 653.77
49850 50 13.63 14.61 730.65
49900 50 10.41 12.02 600.87
49950 50 11.07 10.74 536.88
50000 50 12.66 11.86 593.21
50050 50 12.18 12.42 621.04
50100 50 16.10 14.14 707.14
50150 50 12.45 14.28 713.86
50200 50 9.44 10.95 547.34
50250 50 15.75 12.60 629.82
50300 50 2.36 9.05 452.66
50350 50 13.38 7.87 393.42
50400 50 16.53 14.95 747.67
50450 50 12.84 14.68 734.22
50500 50 11.79 12.31 615.69
50550 50 11.63 11.71 585.32
50600 50 10.89 11.26 563.01
50650 50 9.99 10.44 521.97
50700 50 6.44 8.21 410.63
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO
60/000

50750 50 8.79 7.61 380.72


50800 50 8.60 8.69 434.72
50850 50 9.37 8.99 449.36
50900 50 13.22 11.30 564.94
50950 50 6.70 9.96 497.96
51000 50 16.83 11.76 588.24
51050 50 3.65 10.24 512.17
51100 50 0.00 1.83 91.31
51150 50 0.00 0.00 0.00
51200 50 0.00 0.00 0.00
51250 50 0.00 0.00 0.00
51300 50 0.00 0.00 0.00
51350 50 0.00 0.00 0.00
51400 50 0.00 0.00 0.00
51450 50 0.00 0.00 0.00
51500 50 8.15 4.07 203.75
51550 50 14.58 11.37 568.37
51600 50 7.09 10.84 541.94
51650 50 11.57 9.33 466.47
51700 50 19.52 15.54 777.13
51750 50 10.01 14.76 738.21
51800 50 9.11 9.56 477.86
51850 50 10.71 9.91 495.32
51900 50 9.60 10.15 507.74
51950 50 11.93 10.76 538.21
52000 50 10.37 11.15 557.48
52050 50 13.61 11.99 599.59
52100 50 14.14 13.88 693.82
52150 50 18.23 16.19 809.39
52200 50 17.15 17.69 884.68
52250 50 18.42 17.79 889.41
52300 50 16.34 17.38 869.06
52350 50 23.57 19.96 997.76
52400 50 30.01 26.79 1339.53
52450 50 24.68 27.35 1367.26
52500 50 18.87 21.78 1088.80
52550 50 16.45 17.66 883.04
52600 50 17.37 16.91 845.47
52650 50 16.27 16.82 840.94
52700 50 10.44 13.35 667.67
52750 50 18.17 14.31 715.29
52800 50 15.00 16.59 829.29
52850 50 14.32 14.66 733.03
52900 50 15.93 15.13 756.26
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO
60/000

52950 50 14.60 15.26 763.07


53000 50 13.20 13.90 694.82
53050 50 10.65 11.92 596.06
53100 50 15.09 12.87 643.31
53150 50 12.23 13.66 682.86
53200 50 7.19 9.71 485.43
53250 50 9.76 8.48 423.80
53300 50 19.15 14.46 722.85
53350 50 19.27 19.21 960.59
53400 50 13.14 16.21 810.31
53450 50 10.21 11.67 583.70
53500 50 13.82 12.01 600.61
53550 50 16.16 14.99 749.44
53600 50 16.42 16.29 814.56
53650 50 12.47 14.45 722.25
53700 50 15.01 13.74 686.89
53750 50 10.36 12.68 634.15
53800 50 11.52 10.94 547.06
53850 50 15.49 13.51 675.41
53900 50 15.06 15.27 763.72
53950 50 17.66 16.36 817.97
54000 50 15.46 16.56 828.15
54050 50 5.27 10.37 518.31
54100 50 15.53 10.40 519.87
54150 50 13.19 14.36 717.79
54200 50 19.78 16.48 824.10
54250 50 10.34 15.06 753.04
54300 50 12.39 11.37 568.34
54350 50 10.11 11.25 562.48
54400 50 12.45 11.28 564.10
54450 50 12.56 12.51 625.31
54500 50 10.60 11.58 579.04
54550 50 14.80 12.70 635.17
54600 50 14.02 14.41 720.44
54650 50 27.17 20.59 1029.73
54700 50 4.98 16.08 803.97
54750 50 13.22 9.10 455.04
54800 50 15.23 14.23 711.26
54850 50 13.06 14.15 707.44
54900 50 17.60 15.33 766.52
54950 50 15.95 16.77 838.65
55000 50 13.79 14.87 743.38
55050 50 24.73 19.26 962.83
55100 50 11.75 18.24 911.82
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO
60/000

55150 50 22.16 16.95 847.74


55200 50 9.94 16.05 802.47
55250 50 10.24 10.09 504.33
55300 50 14.33 12.28 614.07
55350 50 16.39 15.36 767.78
55400 50 12.46 14.42 721.20
55450 50 14.64 13.55 677.62
55500 50 18.19 16.41 820.70
55550 50 19.47 18.83 941.32
55600 50 14.14 16.80 840.21
55650 50 10.15 12.15 607.26
55700 50 6.61 8.38 418.98
55750 50 16.47 11.54 576.94
55800 50 12.91 14.69 734.44
55850 50 8.50 10.70 535.23
55900 50 23.69 16.09 804.72
55950 50 13.14 18.41 920.62
56000 50 19.85 16.49 824.66
56050 50 18.55 19.20 960.14
56100 50 29.09 23.82 1191.23
56150 50 9.22 19.16 957.76
56200 50 27.93 18.57 928.63
56250 50 23.88 25.91 1295.34
56300 50 24.73 24.31 1215.35
56350 50 32.39 28.56 1428.11
56400 50 25.72 29.06 1452.82
56450 50 20.29 23.01 1150.28
56500 50 12.13 16.21 810.64
56550 50 11.74 11.94 596.92
56600 50 14.66 13.20 660.05
56650 50 10.31 12.48 624.08
56700 50 26.45 18.38 918.89
56750 50 29.78 28.11 1405.67
56800 50 30.91 30.34 1517.21
56850 50 16.43 23.67 1183.66
56900 50 13.05 14.74 737.06
56950 50 15.86 14.46 722.76
57000 50 17.43 16.64 832.22
57050 50 8.05 12.74 637.00
57100 50 8.67 8.36 418.07
57150 50 9.13 8.90 445.05
57200 50 9.94 9.54 476.76
57250 50 10.91 10.42 521.17
57300 50 3.86 7.39 369.25
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO
60/000

57350 50 6.66 5.26 263.05


57400 50 6.98 6.82 341.01
57450 50 6.70 6.84 341.99
57500 50 7.73 7.21 360.71
57550 50 9.93 8.83 441.35
57600 50 6.21 8.07 403.42
57650 50 8.61 7.41 370.51
57700 50 6.82 7.71 385.75
57750 50 8.06 7.44 372.08
57800 50 10.50 9.28 463.98
57850 50 9.30 9.90 494.83
57900 50 8.20 8.75 437.43
57950 50 6.26 7.23 361.54
58000 50 8.45 7.36 367.88
58050 50 8.94 8.70 434.92
58100 50 5.53 7.24 361.86
58150 50 5.83 5.68 283.94
58200 50 7.84 6.83 341.64
58250 50 10.30 9.07 453.60
58300 50 23.07 16.69 834.47
58350 50 8.83 15.95 797.65
58400 50 15.34 12.08 604.17
58450 50 12.32 13.83 691.42
58500 50 10.61 11.47 573.36
58550 50 9.09 9.85 492.61
58600 50 13.49 11.29 564.60
58650 50 11.64 12.57 628.36
58700 50 11.09 11.37 568.39
58750 50 8.89 9.99 499.55
58800 50 10.53 9.71 485.42
58850 50 12.68 11.60 580.23
58900 50 7.73 10.21 510.36
58950 50 6.97 7.35 367.62
59000 50 6.22 6.60 329.90
59050 50 9.62 7.92 396.10
59100 50 7.67 8.64 432.23
59150 50 10.04 8.86 442.75
59200 50 7.67 8.85 442.70
59250 50 7.80 7.74 386.80
59300 50 6.52 7.16 358.13
59350 50 10.38 8.45 422.63
59400 50 7.62 9.00 450.15
59450 50 6.41 7.02 350.79
59500 50 7.86 7.14 356.76
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO
60/000

59550 50 8.03 7.95 397.29


59600 50 9.56 8.79 439.71
59650 50 10.14 9.85 492.35
59700 50 9.40 9.77 488.45
59750 50 8.28 8.84 442.14
59800 50 7.01 7.65 382.45
59850 50 11.09 9.05 452.69
59900 50 6.01 8.55 427.50
59950 50 7.28 6.64 332.25
60000 50 6.41 6.85 342.42
TOTAL Cum 136314.79

JUNIOR ENGINEER ASST.EXECUTIVE ENGINEER EXECUTIVE ENGINEER


R&B DIVISION R&B DIVISION R&B DIVISION
BOUDH BOUDH BOUDH
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Name of work WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
1.2 114.92 113.72 2.76 116.48 113.72
48817 C 0.00 1.070 114.92 113.85 0.00 2.33 116.48 114.15
L-1 3.72 1.370 114.92 113.55 6.00 2.53 116.48 113.95
L-2 5.10 2.400 114.92 112.52 8.20 3.96 116.48 112.52
L-3 8.50 2.400 114.92 112.52 0.00 116.48 116.48
R-1 3.75 1.270 114.92 113.65 6.00 2.55 116.48 113.93
R-2 5.60 1.900 114.92 113.02 7.40 3.46 116.48 113.02
R-3 10.00 1.900 114.92 113.02 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
48850 C 0.00 2.210 114.92 112.71 48850.00 3.47 116.48 113.01
L-1 3.75 2.820 114.92 112.10 6.00 3.67 116.48 112.81
L-2 5.55 3.350 114.92 111.57 7.90 4.91 116.48 111.57
L-3 11.00 3.350 114.92 111.57 0.00 116.48 116.48
R-1 3.50 2.230 114.92 112.69 6.00 3.69 116.48 112.79
R-2 6.00 2.540 114.92 112.38 6.70 4.10 116.48 112.38
R-3 9.00 2.540 114.92 112.38 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
48900 C 0.00 1.550 114.92 113.37 48900.00 2.81 116.48 113.67
L-1 3.95 2.050 114.92 112.87 6.00 3.01 116.48 113.47
L-2 6.15 2.700 114.92 112.22 7.90 4.26 116.48 112.22
L-3 9.50 2.700 114.92 112.22 0.00 116.48 116.48
R-1 4.00 1.800 114.92 113.12 6.00 3.03 116.48 113.45
R-2 6.88 2.450 114.92 112.47 7.50 4.01 116.48 112.47
R-3 8.50 2.450 114.92 112.47 0.00 116.48 116.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
CP 0.00 114.92 114.92 0.00 116.48 116.48
48950 C 0.00 1.330 114.92 113.59 48950.00 2.59 116.48 113.89
L-1 3.88 1.800 114.92 113.12 6.00 2.79 116.48 113.69
L-2 5.95 2.300 114.92 112.62 7.70 3.86 116.48 112.62
L-3 9.45 2.300 114.92 112.62 0.00 116.48 116.48
R-1 3.95 1.620 114.92 113.30 6.00 2.81 116.48 113.67
R-2 6.12 1.700 114.92 113.22 6.70 3.26 116.48 113.22
R-3 8.45 1.700 114.92 113.22 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49000 C 0.00 0.640 114.92 114.28 49000.00 1.90 116.48 114.58
L-1 3.77 1.240 114.92 113.68 6.00 2.10 116.48 114.38
L-2 6.00 2.400 114.92 112.52 8.80 3.96 116.48 112.52
L-3 9.00 2.400 114.92 112.52 0.00 116.48 116.48
R-1 3.80 0.760 114.92 114.16 6.00 2.12 116.48 114.36
R-2 6.00 2.150 114.92 112.77 8.40 3.71 116.48 112.77
R-3 9.00 2.150 114.92 112.77 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49050 C 0.00 2.210 114.92 112.71 49050.00 3.47 116.48 113.01
L-1 3.82 2.820 114.92 112.10 6.00 3.67 116.48 112.81
L-2 5.65 3.350 114.92 111.57 7.90 4.91 116.48 111.57
L-3 8.40 3.350 114.92 111.57 0.00 116.48 116.48
R-1 3.75 2.330 114.92 112.59 6.00 3.69 116.48 112.79
R-2 5.35 2.540 114.92 112.38 6.70 4.10 116.48 112.38
R-3 8.20 2.540 114.92 112.38 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49100 C 0.00 1.550 114.92 113.37 49100.00 2.81 116.48 113.67
L-1 3.91 2.050 114.92 112.87 6.00 3.01 116.48 113.47
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
L-2 6.05 2.700 114.92 112.22 7.90 4.26 116.48 112.22
L-3 8.90 2.700 114.92 112.22 0.00 116.48 116.48
R-1 3.98 1.800 114.92 113.12 6.00 3.03 116.48 113.45
R-2 6.15 2.450 114.92 112.47 7.50 4.01 116.48 112.47
R-3 7.90 2.450 114.92 112.47 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49150 C 0.00 1.330 114.92 113.59 49150.00 2.59 116.48 113.89
L-1 4.00 1.800 114.92 113.12 6.00 2.79 116.48 113.69
L-2 6.05 2.300 114.92 112.62 7.70 3.86 116.48 112.62
L-3 9.00 2.300 114.92 112.62 0.00 116.48 116.48
R-1 3.96 1.620 114.92 113.30 6.00 2.81 116.48 113.67
R-2 6.00 2.200 114.92 112.72 7.50 3.76 116.48 112.72
R-3 7.80 2.200 114.92 112.72 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49200 C 0.00 0.870 114.92 114.05 49200.00 2.13 116.48 114.35
L-1 3.79 1.220 114.92 113.70 6.00 2.33 116.48 114.15
L-2 6.00 1.420 114.92 113.50 7.00 2.98 116.48 113.50
L-3 7.80 1.420 114.92 113.50 0.00 116.48 116.48
R-1 3.94 1.240 114.92 113.68 6.00 2.35 116.48 114.13
R-2 6.05 1.360 114.92 113.56 6.90 2.92 116.48 113.56
R-3 8.00 1.360 114.92 113.56 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49250 C 0.00 1.620 114.92 113.30 49250.00 2.88 116.48 113.60
L-1 3.88 1.500 114.92 113.42 6.00 3.08 116.48 113.40
L-2 6.28 3.000 114.92 111.92 8.30 4.56 116.48 111.92
L-3 8.50 3.000 114.92 111.92 0.00 116.48 116.48
R-1 3.85 1.540 114.92 113.38 6.00 3.10 116.48 113.38
R-2 5.88 2.800 114.92 112.12 7.90 4.36 116.48 112.12
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-3 8.50 2.800 114.92 112.12 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49300 C 0.00 1.950 114.92 112.97 49300.00 3.21 116.48 113.27
L-1 3.76 2.300 114.92 112.62 6.00 3.41 116.48 113.07
L-2 6.00 3.400 114.92 111.52 8.40 4.96 116.48 111.52
L-3 11.00 3.400 114.92 111.52 0.00 116.48 116.48
R-1 3.87 2.200 114.92 112.72 6.00 3.43 116.48 113.05
R-2 6.15 3.500 114.92 111.42 8.50 5.06 116.48 111.42
R-3 9.00 3.500 114.92 111.42 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49350 C 0.00 1.040 114.92 113.88 49350.00 2.30 116.48 114.18
L-1 3.95 1.140 114.92 113.78 6.00 2.50 116.48 113.98
L-2 6.50 1.600 114.92 113.32 7.00 3.16 116.48 113.32
L-3 9.50 1.600 114.92 113.32 0.00 116.48 116.48
R-1 4.00 1.450 114.92 113.47 6.00 2.52 116.48 113.96
R-2 6.00 2.000 114.92 112.92 7.60 3.56 116.48 112.92
R-3 8.50 2.000 114.92 112.92 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49400 C 0.00 0.940 114.92 113.98 49400.00 2.20 116.48 114.28
L-1 3.97 1.200 114.92 113.72 6.00 2.40 116.48 114.08
L-2 6.06 2.460 114.92 112.46 8.50 4.02 116.48 112.46
L-3 9.45 2.460 114.92 112.46 0.00 116.48 116.48
R-1 3.95 1.350 114.92 113.57 6.00 2.42 116.48 114.06
R-2 6.12 2.200 114.92 112.72 8.10 3.76 116.48 112.72
R-3 8.45 2.200 114.92 112.72 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49450 C 0.00 1.400 114.92 113.52 49450.00 2.66 116.48 113.82
L-1 3.89 1.600 114.92 113.32 6.00 2.86 116.48 113.62
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
L-2 6.00 3.300 114.92 111.62 9.00 4.86 116.48 111.62
L-3 10.00 3.300 114.92 111.62 0.00 116.48 116.48
R-1 3.78 1.700 114.92 113.22 6.00 2.88 116.48 113.60
R-2 6.00 3.130 114.92 111.79 8.80 4.69 116.48 111.79
R-3 10.00 3.130 114.92 111.79 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49500 C 0.00 1.530 114.92 113.39 49500.00 2.79 116.48 113.69
L-1 3.77 2.100 114.92 112.82 6.00 2.99 116.48 113.49
L-2 5.46 2.350 114.92 112.57 7.40 3.91 116.48 112.57
L-3 8.40 2.350 114.92 112.57 0.00 116.48 116.48
R-1 3.94 1.750 114.92 113.17 6.00 3.01 116.48 113.47
R-2 6.32 2.600 114.92 112.32 7.80 4.16 116.48 112.32
R-3 8.20 2.600 114.92 112.32 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49550 C 0.00 0.780 114.92 114.14 49550.00 2.04 116.48 114.44
L-1 3.86 1.060 114.92 113.86 6.00 2.24 116.48 114.24
L-2 6.05 3.100 114.92 111.82 9.70 4.66 116.48 111.82
L-3 10.00 3.100 114.92 111.82 0.00 116.48 116.48
R-1 3.98 1.090 114.92 113.83 6.00 2.26 116.48 114.22
R-2 6.15 3.010 114.92 111.91 9.50 4.57 116.48 111.91
R-3 11.00 3.010 114.92 111.91 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49600 C 0.00 1.580 114.92 113.34 49600.00 2.84 116.48 113.64
L-1 3.75 1.690 114.92 113.23 6.00 3.04 116.48 113.44
L-2 6.00 2.460 114.92 112.46 7.50 4.02 116.48 112.46
L-3 9.80 2.460 114.92 112.46 0.00 116.48 116.48
R-1 3.95 1.700 114.92 113.22 6.00 3.06 116.48 113.42
R-2 6.10 2.200 114.92 112.72 7.10 3.76 116.48 112.72
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-3 7.80 2.200 114.92 112.72 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49650 C 0.00 2.760 114.92 112.16 49650.00 4.02 116.48 112.46
L-1 3.79 3.040 114.92 111.88 6.00 4.22 116.48 112.26
L-2 6.00 3.980 114.92 110.94 8.00 5.54 116.48 110.94
L-3 8.50 3.980 114.92 110.94 0.00 116.48 116.48
R-1 3.75 3.100 114.92 111.82 6.00 4.24 116.48 112.24
R-2 6.05 3.860 114.92 111.06 7.80 5.42 116.48 111.06
R-3 9.00 3.860 114.92 111.06 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49700 C 0.00 1.240 114.92 113.68 49700.00 2.50 116.48 113.98
L-1 3.97 1.700 114.92 113.22 6.00 2.70 116.48 113.78
L-2 5.65 2.350 114.92 112.57 7.90 3.91 116.48 112.57
L-3 8.50 2.350 114.92 112.57 0.00 116.48 116.48
R-1 3.90 1.450 114.92 113.47 6.00 2.72 116.48 113.76
R-2 5.98 2.460 114.92 112.46 8.00 4.02 116.48 112.46
R-3 8.50 2.460 114.92 112.46 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49750 C 0.00 2.270 114.92 112.65 49750.00 3.53 116.48 112.95
L-1 3.99 2.500 114.92 112.42 6.00 3.73 116.48 112.75
L-2 6.45 3.890 114.92 111.03 8.60 5.45 116.48 111.03
L-3 11.00 3.890 114.92 111.03 0.00 116.48 116.48
R-1 3.84 2.500 114.92 112.42 6.00 3.75 116.48 112.73
R-2 6.00 3.700 114.92 111.22 8.30 5.26 116.48 111.22
R-3 9.00 3.700 114.92 111.22 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 116.48 116.48
49800 C 0.00 0.800 114.92 114.12 49800.00 2.06 116.48 114.42
L-1 3.95 1.500 114.92 113.42 6.00 2.26 116.48 114.22
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
L-2 6.50 2.500 114.92 112.42 8.70 4.06 116.48 112.42
L-3 9.50 2.500 114.92 112.42 0.00 116.48 116.48
R-1 3.81 1.900 114.92 113.02 6.00 2.28 116.48 114.20
R-2 6.00 2.400 114.92 112.52 8.60 3.96 116.48 112.52
R-3 8.50 2.400 114.92 112.52 0.00 116.48 116.48
CP 0.00 114.92 114.92 0.00 3.50 3.5 116.48 112.98
49850 C 0.00 1.200 114.92 113.72 49850.00 2.46 116.48 114.02
L-1 4.00 1.960 114.92 112.96 6.00 2.66 116.48 113.82
L-2 5.95 3.000 114.92 111.92 8.90 4.56 116.48 111.92
L-3 9.45 3.000 114.92 111.92 0.00 116.48 116.48
R-1 3.95 1.700 114.92 113.22 6.00 2.68 116.48 113.80
R-2 6.12 2.560 114.92 112.36 8.20 4.12 116.48 112.36
R-3 10.00 2.560 114.92 112.36 0.00 116.48 116.48
CP 0.00 1.76 0.14 116.54 114.78 0.00 116.48 116.48
49900 C 0.00 1.760 116.54 114.78 49900.00 1.40 116.48 115.08
L-1 3.98 2.110 116.54 114.43 6.00 1.60 116.48 114.88
L-2 6.00 3.000 116.54 113.54 8.10 2.94 116.48 113.54
L-3 9.00 3.000 116.54 113.54 0.00 116.48 116.48
R-1 4.00 2.100 116.54 114.44 6.00 1.62 116.48 114.86
R-2 6.10 3.260 116.54 113.28 8.40 3.20 116.48 113.28
R-3 11.00 3.260 116.54 113.28 0.00 116.48 116.48
CP 0.00 116.54 116.54 0.00 116.48 116.48
49950 C 0.00 3.010 116.54 113.53 49950.00 2.65 116.48 113.83
L-1 4.00 3.500 116.54 113.04 6.00 2.85 116.48 113.63
L-2 6.12 4.680 116.54 111.86 8.70 4.62 116.48 111.86
L-3 8.40 4.680 116.54 111.86 0.00 116.48 116.48
R-1 3.86 3.300 116.54 113.24 6.00 2.87 116.48 113.61
R-2 6.32 4.200 116.54 112.34 8.00 4.14 116.48 112.34
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-3 9.50 4.200 116.54 112.34 0.00 116.48 116.48
CP 0.00 116.54 116.54 0.00 116.48 116.48
50000 C 0.00 1.750 116.54 114.79 50000.00 1.39 116.48 115.09
L-1 3.97 2.450 116.54 114.09 6.00 1.59 116.48 114.89
L-2 6.05 3.400 116.54 113.14 8.70 3.34 116.48 113.14
L-3 9.20 3.400 116.54 113.14 0.00 116.48 116.48
R-1 3.98 2.550 116.54 113.99 6.00 1.61 116.48 114.87
R-2 6.15 2.720 116.54 113.82 7.60 2.66 116.48 113.82
R-3 7.90 2.720 116.54 113.82 0.00 116.48 116.48
CP 0.00 3.24 1.79 117.99 114.75 0.00 3.50 2.5 117.48 113.98
50050 C 0.00 1.500 117.99 116.49 50050.00 0.69 117.48 116.79
L-1 3.91 1.900 117.99 116.09 6.00 0.89 117.48 116.59
L-2 6.00 2.900 117.99 115.09 8.30 2.39 117.48 115.09
L-3 9.00 2.900 117.99 115.09 0.00 117.48 117.48
R-1 4.00 1.950 117.99 116.04 6.00 0.91 117.48 116.57
R-2 6.00 3.200 117.99 114.79 8.70 2.69 117.48 114.79
R-3 10.00 3.200 117.99 114.79 0.00 117.48 117.48
CP 0.00 117.99 117.99 0.00 117.48 117.48
50100 C 0.00 1.760 117.99 116.23 50100.00 0.95 117.48 116.53
L-1 4.00 2.900 117.99 115.09 6.00 1.15 117.48 116.33
L-2 6.14 3.500 117.99 114.49 8.80 2.99 117.48 114.49
L-3 9.80 3.500 117.99 114.49 0.00 117.48 117.48
R-1 4.00 2.760 117.99 115.23 6.00 1.17 117.48 116.31
R-2 6.05 3.150 117.99 114.84 8.30 2.64 117.48 114.84
R-3 10.00 3.150 117.99 114.84 0.00 117.48 117.48
CP 0.00 117.99 117.99 0.00 117.48 117.48
50150 C 0.00 1.450 117.99 116.54 50150.00 0.64 117.48 116.84
L-1 3.76 1.600 117.99 116.39 6.00 0.84 117.48 116.64
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
L-2 5.10 3.100 117.99 114.89 8.70 2.59 117.48 114.89
L-3 9.60 3.100 117.99 114.89 0.00 117.48 117.48
R-1 3.98 1.900 117.99 116.09 6.00 0.86 117.48 116.62
R-2 5.60 2.900 117.99 115.09 8.30 2.39 117.48 115.09
R-3 10.00 2.900 117.99 115.09 0.00 117.48 117.48
CP 0.00 0.38 1.27 117.10 116.72 0.00 117.48 117.48
50200 C 0.00 1.750 117.10 115.35 50200.00 1.83 117.48 115.65
L-1 4.00 1.900 117.10 115.20 6.00 2.03 117.48 115.45
L-2 6.13 3.400 117.10 113.70 8.70 3.78 117.48 113.70
L-3 11.00 3.400 117.10 113.70 0.00 117.48 117.48
R-1 3.79 1.850 117.10 115.25 6.00 2.05 117.48 115.43
R-2 6.00 2.900 117.10 114.20 7.90 3.28 117.48 114.20
R-3 9.00 2.900 117.10 114.20 0.00 117.48 117.48
CP 0.00 117.10 117.10 0.00 117.48 117.48
50250 C 0.00 1.240 117.10 115.86 50250.00 1.32 117.48 116.16
L-1 3.95 1.400 117.10 115.70 6.00 1.52 117.48 115.96
L-2 6.50 3.500 117.10 113.60 9.60 3.88 117.48 113.60
L-3 11.00 3.500 117.10 113.60 0.00 117.48 117.48
R-1 4.00 1.400 117.10 115.70 6.00 1.54 117.48 115.94
R-2 6.06 3.500 117.10 113.60 9.60 3.88 117.48 113.60
R-3 12.00 3.500 117.10 113.60 0.00 117.48 117.48
CP 0.00 117.10 117.10 0.00 117.48 117.48
50300 C 0.00 2.750 117.10 114.35 50300.00 2.83 117.48 114.65
L-1 4.00 2.750 117.10 114.35 6.00 3.03 117.48 114.45
L-2 5.95 2.750 117.10 114.35 6.20 3.13 117.48 114.35
L-3 9.45 2.750 117.10 114.35 0.00 117.48 117.48
R-1 3.95 2.750 117.10 114.35 6.00 3.05 117.48 114.43
R-2 6.12 2.750 117.10 114.35 6.20 3.13 117.48 114.35
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-3 8.45 2.750 117.10 114.35 0.00 117.48 117.48
CP 0.00 117.10 117.10 0.00 117.48 117.48
50350 C 0.00 1.710 117.10 115.39 50350.00 1.79 117.48 115.69
L-1 3.88 2.100 117.10 115.00 6.00 1.99 117.48 115.49
L-2 6.00 3.500 117.10 113.60 8.90 3.88 117.48 113.60
L-3 9.00 3.500 117.10 113.60 0.00 117.48 117.48
R-1 4.00 2.050 117.10 115.05 6.00 2.01 117.48 115.47
R-2 6.11 3.450 117.10 113.65 8.80 3.83 117.48 113.65
R-3 11.00 3.450 117.10 113.65 0.00 117.48 117.48
CP 0.00 117.10 117.10 0.00 117.48 117.48
50400 C 0.00 0.780 117.10 116.32 50400.00 0.86 117.48 116.62
L-1 3.85 1.200 117.10 115.90 6.00 1.06 117.48 116.42
L-2 5.40 2.500 117.10 114.60 8.80 2.88 117.48 114.60
L-3 10.00 2.500 117.10 114.60 0.00 117.48 117.48
R-1 3.82 1.300 117.10 115.80 6.00 1.08 117.48 116.40
R-2 5.20 2.900 117.10 114.20 9.30 3.28 117.48 114.20
R-3 10.00 2.900 117.10 114.20 0.00 117.48 117.48
CP 0.00 117.10 117.10 0.00 117.48 117.48
50450 C 0.00 0.900 117.10 116.20 50450.00 0.98 117.48 116.50
L-1 3.77 1.300 117.10 115.80 6.00 1.18 117.48 116.30
L-2 6.05 2.600 117.10 114.50 8.70 2.98 117.48 114.50
L-3 9.80 2.600 117.10 114.50 0.00 117.48 117.48
R-1 3.98 1.260 117.10 115.84 6.00 1.20 117.48 116.28
R-2 6.15 2.560 117.10 114.54 8.70 2.94 117.48 114.54
R-3 11.00 2.560 117.10 114.54 0.00 117.48 117.48
CP 0.00 117.10 117.10 0.00 117.48 117.48
50500 C 0.00 1.390 117.10 115.71 50500.00 1.47 117.48 116.01
L-1 4.00 2.050 117.10 115.05 6.00 1.67 117.48 115.81
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
L-2 6.00 3.000 117.10 114.10 8.60 3.38 117.48 114.10
L-3 8.90 3.000 117.10 114.10 0.00 117.48 117.48
R-1 4.00 1.560 117.10 115.54 6.00 1.69 117.48 115.79
R-2 6.00 2.800 117.10 114.30 8.30 3.18 117.48 114.30
R-3 11.00 2.800 117.10 114.30 0.00 117.48 117.48
CP 0.00 117.10 117.10 0.00 117.48 117.48
50550 C 0.00 1.160 117.10 115.94 50550.00 1.24 117.48 116.24
L-1 4.00 1.300 117.10 115.80 6.00 1.44 117.48 116.04
L-2 6.00 2.800 117.10 114.30 8.70 3.18 117.48 114.30
L-3 9.50 2.800 117.10 114.30 0.00 117.48 117.48
R-1 4.00 1.430 117.10 115.67 6.00 1.46 117.48 116.02
R-2 6.05 2.860 117.10 114.24 8.70 3.24 117.48 114.24
R-3 10.00 2.860 117.10 114.24 0.00 117.48 117.48
CP 0.00 0.38 1 116.48 116.10 0.00 117.48 117.48
50600 C 0.00 1.540 116.48 114.94 50600.00 2.24 117.48 115.24
L-1 3.50 1.780 116.48 114.70 6.00 2.44 117.48 115.04
L-2 5.10 2.980 116.48 113.50 8.40 3.98 117.48 113.50
L-3 8.50 2.980 116.48 113.50 0.00 117.48 117.48
R-1 4.20 1.750 116.48 114.73 6.00 2.46 117.48 115.02
R-2 5.60 2.890 116.48 113.59 8.20 3.89 117.48 113.59
R-3 12.00 2.890 116.48 113.59 0.00 117.48 117.48
CP 0.00 116.48 116.48 0.00 117.48 117.48
50650 C 0.00 1.160 116.48 115.32 50650.00 1.86 117.48 115.62
L-1 4.00 1.410 116.48 115.07 6.00 2.06 117.48 115.42
L-2 6.00 2.230 116.48 114.25 7.80 3.23 117.48 114.25
L-3 11.00 2.230 116.48 114.25 0.00 117.48 117.48
R-1 3.50 1.600 116.48 114.88 6.00 2.08 117.48 115.40
R-2 6.00 2.560 116.48 113.92 8.30 3.56 117.48 113.92
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-3 9.00 2.560 116.48 113.92 0.00 117.48 117.48
CP 0.00 116.48 116.48 0.00 117.48 117.48
50700 C 0.00 1.380 116.48 115.10 50700.00 2.08 117.48 115.40
L-1 3.95 1.400 116.48 115.08 6.00 2.28 117.48 115.20
L-2 6.50 2.700 116.48 113.78 8.20 3.70 117.48 113.78
L-3 9.50 2.700 116.48 113.78 0.00 117.48 117.48
R-1 4.00 1.380 116.48 115.10 6.00 2.30 117.48 115.18
R-2 6.00 2.200 116.48 114.28 7.40 3.20 117.48 114.28
R-3 8.50 2.200 116.48 114.28 0.00 117.48 117.48
CP 0.00 1.57 0.4 117.65 116.08 0.00 117.48 117.48
50750 C 0.00 2.250 117.65 115.40 50750.00 1.78 117.48 115.70
L-1 4.05 2.400 117.65 115.25 6.00 1.98 117.48 115.50
L-2 5.95 3.400 117.65 114.25 7.90 3.23 117.48 114.25
L-3 9.45 3.400 117.65 114.25 0.00 117.48 117.48
R-1 3.95 2.450 117.65 115.20 6.00 2.00 117.48 115.48
R-2 6.12 3.650 117.65 114.00 8.30 3.48 117.48 114.00
R-3 8.45 3.650 117.65 114.00 0.00 117.48 117.48
CP 0.00 117.65 117.65 0.00 117.48 117.48
50800 C 0.00 1.200 117.65 116.45 50800.00 0.73 117.48 116.75
L-1 4.00 1.450 117.65 116.20 6.00 0.93 117.48 116.55
L-2 6.00 2.900 117.65 114.75 8.70 2.73 117.48 114.75
L-3 9.00 2.900 117.65 114.75 0.00 117.48 117.48
R-1 4.00 0.800 117.65 116.85 6.00 0.95 117.48 116.53
R-2 6.00 2.450 117.65 115.20 8.00 2.28 117.48 115.20
R-3 8.90 2.450 117.65 115.20 0.00 117.48 117.48
CP 0.00 117.65 117.65 0.00 117.48 117.48
50850 C 0.00 1.160 117.65 116.49 50850.00 0.69 117.48 116.79
L-1 3.75 1.470 117.65 116.18 6.00 0.89 117.48 116.59
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
L-2 5.40 2.500 117.65 115.15 8.20 2.33 117.48 115.15
L-3 8.40 2.500 117.65 115.15 0.00 117.48 117.48
R-1 4.00 1.500 117.65 116.15 6.00 0.91 117.48 116.57
R-2 5.20 2.000 117.65 115.65 7.40 1.83 117.48 115.65
R-3 8.20 2.000 117.65 115.65 0.00 117.48 117.48
CP 0.00 117.65 117.65 0.00 117.48 117.48
50900 C 0.00 1.380 117.65 116.27 50900.00 0.91 117.48 116.57
L-1 4.00 1.860 117.65 115.79 6.00 1.11 117.48 116.37
L-2 6.05 3.000 117.65 114.65 8.60 2.83 117.48 114.65
L-3 9.00 3.000 117.65 114.65 0.00 117.48 117.48
R-1 3.98 2.210 117.65 115.44 6.00 1.13 117.48 116.35
R-2 6.15 2.800 117.65 114.85 8.30 2.63 117.48 114.85
R-3 10.00 2.810 117.65 114.84 0.00 117.48 117.48
CP 0.00 117.65 117.65 0.00 117.48 117.48
50950 C 0.00 1.570 117.65 116.08 50950.00 1.10 117.48 116.38
L-1 3.96 1.400 117.65 116.25 6.00 1.30 117.48 116.18
L-2 6.00 3.000 117.65 114.65 8.30 2.83 117.48 114.65
L-3 10.00 3.000 117.65 114.65 0.00 117.48 117.48
R-1 4.00 1.630 117.65 116.02 6.00 1.32 117.48 116.16
R-2 6.00 2.400 117.65 115.25 7.40 2.23 117.48 115.25
R-3 10.00 2.400 117.65 115.25 0.00 117.48 117.48
CP 0.00 1.45 1.85 117.25 115.80 0.00 117.48 117.48
51000 C 0.00 1.100 117.25 116.15 51000.00 1.03 117.48 116.45
L-1 3.92 1.800 117.25 115.45 6.00 1.23 117.48 116.25
L-2 6.00 3.160 117.25 114.09 9.30 3.39 117.48 114.09
L-3 10.00 3.160 117.25 114.09 0.00 117.48 117.48
R-1 4.00 1.900 117.25 115.35 6.00 1.25 117.48 116.23
R-2 6.05 2.850 117.25 114.40 8.80 3.08 117.48 114.40
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-3 10.00 2.850 117.25 114.40 0.00 117.48 117.48
CP 0.00 117.25 117.25 0.00 117.48 117.48
51050 C 0.00 1.220 117.25 116.03 51050.00 1.15 117.48 116.33
L-1 3.78 1.430 117.25 115.82 6.00 1.35 117.48 116.13
L-2 5.10 1.500 117.25 115.75 6.60 1.73 117.48 115.75
L-3 8.50 1.500 117.25 115.75 0.00 117.48 117.48
R-1 4.00 1.210 117.25 116.04 6.00 1.37 117.48 116.11
R-2 5.60 1.390 117.25 115.86 6.40 1.62 117.48 115.86
R-3 8.50 1.390 117.25 115.86 0.00 117.48 117.48
CP 0.00 117.25 117.25 0.00 117.48 117.48
51100 C 0.00 1.340 117.25 115.91 51100.00 1.57 117.48 115.91
L-1 4.00 1.340 117.25 115.91 6.00 1.57 117.48 115.91
L-2 6.00 1.340 117.25 115.91 6.00 1.57 117.48 115.91
L-3 7.58 1.340 117.25 115.91 0.00 117.48 117.48
R-1 4.00 1.340 117.25 115.91 6.00 1.57 117.48 115.91
R-2 6.50 1.340 117.25 115.91 6.00 1.57 117.48 115.91
R-3 8.52 1.340 117.25 115.91 0.00 1.57 117.48 115.91
CP 0.00 117.25 117.25 0.00 117.48 117.48
51150 C 0.00 1.470 117.25 115.78 51150.00 1.70 117.48 115.78
L-1 3.85 1.470 117.25 115.78 6.00 1.70 117.48 115.78
L-2 6.00 1.470 117.25 115.78 6.00 1.70 117.48 115.78
L-3 9.20 1.470 117.25 115.78 0.00 117.48 117.48
R-1 4.00 1.470 117.25 115.78 6.00 1.70 117.48 115.78
R-2 6.00 1.470 117.25 115.78 6.00 1.70 117.48 115.78
R-3 7.52 1.470 117.25 115.78 0.00 1.70 117.48 115.78
CP 0.00 117.25 117.25 0.00 117.48 117.48
51200 C 0.00 0.240 117.25 117.01 51200.00 0.47 117.48 117.01
L-1 4.00 0.240 117.25 117.01 6.00 0.47 117.48 117.01
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
L-2 6.12 0.240 117.25 117.01 6.00 0.47 117.48 117.01
L-3 9.45 0.240 117.25 117.01 0.00 117.48 117.48
R-1 3.95 0.240 117.25 117.01 6.00 0.47 117.48 117.01
R-2 6.12 0.240 117.25 117.01 6.00 0.47 117.48 117.01
R-3 8.45 0.240 117.25 117.01 0.00 0.47 117.48 117.01
CP 0.00 117.25 117.25 0.00 117.48 117.48
51250 C 0.00 1.170 117.25 116.08 51250.00 1.40 117.48 116.08
L-1 3.98 1.170 117.25 116.08 6.00 1.40 117.48 116.08
L-2 6.00 1.170 117.25 116.08 6.00 1.40 117.48 116.08
L-3 9.00 1.170 117.25 116.08 0.00 117.48 117.48
R-1 4.00 1.170 117.25 116.08 6.00 1.40 117.48 116.08
R-2 6.00 1.170 117.25 116.08 6.00 1.40 117.48 116.08
R-3 7.90 1.170 117.25 116.08 0.00 1.40 117.48 116.08
CP 0.00 117.25 117.25 0.00 117.48 117.48
51300 C 0.00 1.580 117.25 115.67 51300.00 1.81 117.48 115.67
L-1 4.00 1.580 117.25 115.67 6.00 1.81 117.48 115.67
L-2 5.40 1.580 117.25 115.67 6.00 1.81 117.48 115.67
L-3 9.62 1.580 117.25 115.67 0.00 117.48 117.48
R-1 3.76 1.580 117.25 115.67 6.00 1.81 117.48 115.67
R-2 5.64 1.580 117.25 115.67 6.00 1.81 117.48 115.67
R-3 8.20 1.580 117.25 115.67 0.00 1.81 117.48 115.67
CP 0.00 117.25 117.25 0.00 117.48 117.48
51350 C 0.00 1.490 117.25 115.76 51350.00 1.72 117.48 115.76
L-1 4.00 1.490 117.25 115.76 6.00 1.72 117.48 115.76
L-2 6.05 1.490 117.25 115.76 6.00 1.72 117.48 115.76
L-3 7.50 1.490 117.25 115.76 0.00 117.48 117.48
R-1 3.98 1.490 117.25 115.76 6.00 1.72 117.48 115.76
R-2 6.15 1.490 117.25 115.76 6.00 1.72 117.48 115.76
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-3 7.90 1.490 117.25 115.76 0.00 1.72 117.48 115.76
CP 0.00 117.25 117.25 0.00 117.48 117.48
51400 C 0.00 1.320 117.25 115.93 51400.00 1.55 117.48 115.93
L-1 3.90 1.320 117.25 115.93 6.00 1.55 117.48 115.93
L-2 6.00 1.320 117.25 115.93 6.00 1.55 117.48 115.93
L-3 7.50 1.320 117.25 115.93 0.00 117.48 117.48
R-1 4.00 1.320 117.25 115.93 6.00 1.55 117.48 115.93
R-2 6.00 1.320 117.25 115.93 6.00 1.55 117.48 115.93
R-3 7.80 1.320 117.25 115.93 0.00 1.55 117.48 115.93
CP 0.00 117.25 117.25 0.00 117.48 117.48
51450 C 0.00 1.350 117.25 115.90 51450.00 1.58 117.48 115.90
L-1 4.00 1.350 117.25 115.90 6.00 1.58 117.48 115.90
L-2 6.00 1.350 117.25 115.90 6.00 1.58 117.48 115.90
L-3 8.63 1.350 117.25 115.90 0.00 117.48 117.48
R-1 4.00 1.350 117.25 115.90 6.00 1.58 117.48 115.90
R-2 6.05 1.350 117.25 115.90 6.00 1.58 117.48 115.90
R-3 8.00 1.350 117.25 115.90 0.00 1.58 117.48 115.90
CP 0.00 117.25 117.25 0.00 117.48 117.48
51500 C 0.00 1.580 117.25 115.67 51500.00 1.51 117.48 115.97
L-1 4.00 1.600 117.25 115.65 6.00 1.71 117.48 115.77
L-2 5.10 2.600 117.25 114.65 7.70 2.83 117.48 114.65
L-3 8.50 2.600 117.25 114.65 0.00 117.48 117.48
R-1 4.20 1.700 117.25 115.55 6.00 1.73 117.48 115.75
R-2 5.60 2.900 117.25 114.35 8.20 3.13 117.48 114.35
R-3 8.50 2.900 117.25 114.35 0.00 117.48 117.48
CP 0.00 117.25 117.25 0.00 117.48 117.48
51550 C 0.00 1.320 117.25 115.93 51550.00 1.25 117.48 116.23
L-1 4.00 1.940 117.25 115.31 6.00 1.45 117.48 116.03
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
L-2 6.00 2.600 117.25 114.65 8.10 2.83 117.48 114.65
L-3 8.45 2.600 117.25 114.65 0.00 117.48 117.48
R-1 3.96 1.850 117.25 115.40 6.00 1.47 117.48 116.01
R-2 6.00 3.500 117.25 113.75 9.40 3.73 117.48 113.75
R-3 10.00 3.500 117.25 113.75 0.00 117.48 117.48
CP 0.00 0.76 2.51 115.50 114.74 0.00 117.48 117.48
51600 C 0.00 1.320 115.50 114.18 51600.00 3.00 117.48 114.48
L-1 4.00 1.560 115.50 113.94 6.00 3.20 117.48 114.28
L-2 6.00 1.980 115.50 113.52 7.20 3.96 117.48 113.52
L-3 8.00 1.980 115.50 113.52 0.00 117.48 117.48
R-1 4.00 1.500 115.50 114.00 6.00 3.22 117.48 114.26
R-2 6.00 2.500 115.50 113.00 7.90 4.48 117.48 113.00
R-3 7.50 2.500 115.50 113.00 0.00 117.48 117.48
CP 0.00 115.50 115.50 0.00 117.48 117.48
51650 C 0.00 1.320 115.50 114.18 51650.00 3.00 117.48 114.48
L-1 3.95 1.440 115.50 114.06 6.00 3.20 117.48 114.28
L-2 6.50 3.000 115.50 112.50 8.70 4.98 117.48 112.50
L-3 9.63 3.000 115.50 112.50 0.00 117.48 117.48
R-1 4.00 1.700 115.50 113.80 6.00 3.22 117.48 114.26
R-2 6.10 3.000 115.50 112.50 8.70 4.98 117.48 112.50
R-3 10.00 3.000 115.50 112.50 0.00 117.48 117.48
CP 0.00 115.50 115.50 0.00 117.48 117.48
51700 C 0.00 1.530 115.50 113.97 51700.00 3.21 117.48 114.27
L-1 3.98 1.750 115.50 113.75 6.00 3.41 117.48 114.07
L-2 6.00 4.000 115.50 111.50 9.90 5.98 117.48 111.50
L-3 10.20 4.000 115.50 111.50 0.00 117.48 117.48
R-1 4.00 1.710 115.50 113.79 6.00 3.43 117.48 114.05
R-2 6.10 4.250 115.50 111.25 10.20 6.23 117.48 111.25
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-3 11.00 4.250 115.50 111.25 0.00 117.48 117.48
CP 0.00 2.56 1.55 116.51 113.95 0.00 117.48 117.48
51750 C 0.00 2.560 116.51 113.95 51750.00 3.23 117.48 114.25
L-1 4.00 2.900 116.51 113.61 6.00 3.43 117.48 114.05
L-2 6.00 3.600 116.51 112.91 7.80 4.57 117.48 112.91
L-3 9.00 3.600 116.51 112.91 0.00 117.48 117.48
R-1 4.00 3.100 116.51 113.41 6.00 3.45 117.48 114.03
R-2 6.50 4.000 116.51 112.51 8.30 4.97 117.48 112.51
R-3 8.52 4.000 116.51 112.51 0.00 117.48 117.48
CP 0.00 116.51 116.51 0.00 117.48 117.48
51800 C 0.00 1.600 116.51 114.91 51800.00 2.27 117.48 115.21
L-1 3.92 1.950 116.51 114.56 6.00 2.47 117.48 115.01
L-2 6.24 2.560 116.51 113.95 7.60 3.53 117.48 113.95
L-3 8.00 2.560 116.51 113.95 0.00 117.48 117.48
R-1 4.00 1.880 116.51 114.63 6.00 2.49 117.48 114.99
R-2 6.00 3.000 116.51 113.51 8.30 3.97 117.48 113.51
R-3 10.00 3.000 116.51 113.51 0.00 117.48 117.48
CP 0.00 116.51 116.51 0.00 117.48 117.48
51850 C 0.00 1.270 116.51 115.24 51850.00 1.94 117.48 115.54
L-1 3.99 1.360 116.51 115.15 6.00 2.14 117.48 115.34
L-2 6.25 3.260 116.51 113.25 9.20 4.23 117.48 113.25
L-3 9.56 3.260 116.51 113.25 0.00 117.48 117.48
R-1 4.00 1.450 116.51 115.06 6.00 2.16 117.48 115.32
R-2 6.50 2.560 116.51 113.95 8.10 3.53 117.48 113.95
R-3 8.52 2.560 116.51 113.95 0.00 117.48 117.48
CP 0.00 0.56 1.17 115.90 115.34 0.00 117.48 117.48
51900 C 0.00 0.560 115.90 115.34 51900.00 1.84 117.48 115.64
L-1 3.98 0.850 115.90 115.05 6.00 2.04 117.48 115.44
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
L-2 6.21 1.900 115.90 114.00 8.20 3.48 117.48 114.00
L-3 8.00 1.900 115.90 114.00 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 4.00 0.700 115.90 115.20 6.00 2.06 117.48 115.42
R-2 6.00 1.980 115.90 113.92 8.30 3.56 117.48 113.92
R-3 10.00 1.980 115.90 113.92 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
51950 C 0.00 1.130 115.90 114.77 51950.00 2.41 117.48 115.07
L-1 3.99 1.600 115.90 114.30 6.00 2.61 117.48 114.87
L-2 6.10 2.560 115.90 113.34 8.30 4.14 117.48 113.34
L-3 9.00 2.560 115.90 113.34 0.00 117.48 117.48
R-1 4.00 1.610 115.90 114.29 6.00 2.63 117.48 114.85
R-2 6.00 2.680 115.90 113.22 8.50 4.26 117.48 113.22
R-3 10.00 2.680 115.90 113.22 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52000 C 0.00 1.900 115.90 114.00 52000.00 3.18 117.48 114.30
L-1 3.95 1.980 115.90 113.92 6.00 3.38 117.48 114.10
L-2 6.50 3.500 115.90 112.40 8.60 5.08 117.48 112.40
L-3 9.00 3.500 115.90 112.40 0.00 117.48 117.48
R-1 4.00 2.000 115.90 113.90 6.00 3.40 117.48 114.08
R-2 6.10 3.600 115.90 112.30 8.70 5.18 117.48 112.30
R-3 9.00 3.600 115.90 112.30 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52050 C 0.00 2.390 115.90 113.51 52050.00 3.67 117.48 113.81
L-1 4.00 2.650 115.90 113.25 6.00 3.87 117.48 113.61
L-2 6.65 4.260 115.90 111.64 9.00 5.84 117.48 111.64
L-3 10.23 4.260 115.90 111.64 0.00 117.48 117.48
R-1 3.96 2.900 115.90 113.00 6.00 3.89 117.48 113.59
R-2 6.22 4.250 115.90 111.65 9.00 5.83 117.48 111.65
R-3 10.00 4.250 115.90 111.65 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
52100 C 0.00 1.110 115.90 114.79 52100.00 2.39 117.48 115.09
L-1 3.88 1.470 115.90 114.43 6.00 2.59 117.48 114.89
L-2 6.63 3.250 115.90 112.65 9.40 4.83 117.48 112.65
L-3 11.00 3.250 115.90 112.65 0.00 117.48 117.48
R-1 4.00 1.500 115.90 114.40 6.00 2.61 117.48 114.87
R-2 6.50 2.890 115.90 113.01 8.80 4.47 117.48 113.01
R-3 11.00 2.890 115.90 113.01 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52150 C 0.00 1.220 115.90 114.68 52150.00 2.50 117.48 114.98
L-1 3.87 2.050 115.90 113.85 6.00 2.70 117.48 114.78
L-2 6.00 3.120 115.90 112.78 9.00 4.70 117.48 112.78
L-3 11.00 3.120 115.90 112.78 0.00 117.48 117.48
R-1 4.00 1.950 115.90 113.95 6.00 2.72 117.48 114.76
R-2 6.00 3.420 115.90 112.48 9.50 5.00 117.48 112.48
R-3 11.00 3.420 115.90 112.48 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52200 C 0.00 1.390 115.90 114.51 52200.00 2.67 117.48 114.81
L-1 4.00 1.600 115.90 114.30 6.00 2.87 117.48 114.61
L-2 6.12 3.160 115.90 112.74 8.90 4.74 117.48 112.74
L-3 11.00 3.160 115.90 112.74 0.00 117.48 117.48
R-1 4.00 1.700 115.90 114.20 6.00 2.89 117.48 114.59
R-2 6.00 4.150 115.90 111.75 10.30 5.73 117.48 111.75
R-3 11.00 4.150 115.90 111.75 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52250 C 0.00 1.650 115.90 114.25 52250.00 2.93 117.48 114.55
L-1 3.83 1.710 115.90 114.19 6.00 3.13 117.48 114.35
L-2 6.10 3.460 115.90 112.44 8.90 5.04 117.48 112.44
L-3 10.00 3.460 115.90 112.44 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.94 2.200 115.90 113.70 6.00 3.15 117.48 114.33
R-2 6.10 4.560 115.90 111.34 10.50 6.14 117.48 111.34
R-3 10.00 4.560 115.90 111.34 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52300 C 0.00 1.460 115.90 114.44 52300.00 2.74 117.48 114.74
L-1 3.97 1.600 115.90 114.30 6.00 2.94 117.48 114.54
L-2 6.16 3.260 115.90 112.64 8.90 4.84 117.48 112.64
L-3 11.00 3.260 115.90 112.64 0.00 117.48 117.48
R-1 3.99 2.030 115.90 113.87 6.00 2.96 117.48 114.52
R-2 6.32 3.980 115.90 111.92 10.00 5.56 117.48 111.92
R-3 11.00 3.980 115.90 111.92 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52350 C 0.00 1.350 115.90 114.55 52350.00 2.63 117.48 114.85
L-1 3.95 1.510 115.90 114.39 6.00 2.83 117.48 114.65
L-2 6.50 4.560 115.90 111.34 11.00 6.14 117.48 111.34
L-3 12.00 4.560 115.90 111.34 0.00 117.48 117.48
R-1 4.00 1.510 115.90 114.39 6.00 2.85 117.48 114.63
R-2 6.10 4.250 115.90 111.65 10.50 5.83 117.48 111.65
R-3 12.00 4.250 115.90 111.65 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52400 C 0.00 1.100 115.90 114.80 52400.00 2.38 117.48 115.10
L-1 3.86 1.270 115.90 114.63 6.00 2.58 117.48 114.90
L-2 6.00 4.980 115.90 110.92 12.00 6.56 117.48 110.92
L-3 15.00 4.980 115.90 110.92 0.00 117.48 117.48
R-1 4.00 1.400 115.90 114.50 6.00 2.60 117.48 114.88
R-2 6.10 4.120 115.90 111.78 10.70 5.70 117.48 111.78
R-3 15.00 4.120 115.90 111.78 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
52450 C 0.00 0.280 115.90 115.62 52450.00 1.56 117.48 115.92
L-1 4.00 0.450 115.90 115.45 6.00 1.76 117.48 115.72
L-2 6.00 3.260 115.90 112.64 10.70 4.84 117.48 112.64
L-3 11.00 3.260 115.90 112.64 0.00 117.48 117.48
R-1 3.94 0.500 115.90 115.40 6.00 1.78 117.48 115.70
R-2 6.65 3.560 115.90 112.34 11.10 5.14 117.48 112.34
R-3 11.00 3.560 115.90 112.34 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52500 C 0.00 0.820 115.90 115.08 52500.00 2.10 117.48 115.38
L-1 3.89 1.100 115.90 114.80 6.00 2.30 117.48 115.18
L-2 6.10 3.000 115.90 112.90 9.50 4.58 117.48 112.90
L-3 12.00 3.000 115.90 112.90 0.00 117.48 117.48
R-1 3.96 1.200 115.90 114.70 6.00 2.32 117.48 115.16
R-2 6.15 3.500 115.90 112.40 10.20 5.08 117.48 112.40
R-3 12.00 3.500 115.90 112.40 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52550 C 0.00 1.880 115.90 114.02 52550.00 3.16 117.48 114.32
L-1 4.00 1.950 115.90 113.95 6.00 3.36 117.48 114.12
L-2 6.12 4.260 115.90 111.64 9.80 5.84 117.48 111.64
L-3 10.80 4.260 115.90 111.64 0.00 117.48 117.48
R-1 3.97 1.920 115.90 113.98 6.00 3.38 117.48 114.10
R-2 6.12 4.260 115.90 111.64 9.70 5.84 117.48 111.64
R-3 7.52 4.260 115.90 111.64 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52600 C 0.00 2.110 115.90 113.79 52600.00 3.39 117.48 114.09
L-1 3.93 2.250 115.90 113.65 6.00 3.59 117.48 113.89
L-2 6.16 4.400 115.90 111.50 9.60 5.98 117.48 111.50
L-3 11.20 4.400 115.90 111.50 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 4.00 2.350 115.90 113.55 6.00 3.61 117.48 113.87
R-2 6.10 4.600 115.90 111.30 9.90 6.18 117.48 111.30
R-3 11.00 4.600 115.90 111.30 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52650 C 0.00 1.420 115.90 114.48 52650.00 2.70 117.48 114.78
L-1 4.00 1.560 115.90 114.34 6.00 2.90 117.48 114.58
L-2 6.00 3.750 115.90 112.15 9.70 5.33 117.48 112.15
L-3 10.00 3.750 115.90 112.15 0.00 117.48 117.48
R-1 3.87 1.630 115.90 114.27 6.00 2.92 117.48 114.56
R-2 6.00 3.560 115.90 112.34 9.40 5.14 117.48 112.34
R-3 11.00 3.560 115.90 112.34 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 2.50 2.5 117.48 114.98
52700 C 0.00 1.100 115.90 114.80 52700.00 2.38 117.48 115.10
L-1 3.95 1.260 115.90 114.64 6.00 2.58 117.48 114.90
L-2 6.50 2.560 115.90 113.34 8.40 4.14 117.48 113.34
L-3 9.00 2.560 115.90 113.34 0.00 117.48 117.48
R-1 4.00 1.290 115.90 114.61 6.00 2.60 117.48 114.88
R-2 6.10 2.790 115.90 113.11 8.70 4.37 117.48 113.11
R-3 9.00 2.790 115.90 113.11 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52750 C 0.00 0.830 115.90 115.07 52750.00 2.11 117.48 115.37
L-1 3.91 1.250 115.90 114.65 6.00 2.31 117.48 115.17
L-2 6.18 3.120 115.90 112.78 9.60 4.70 117.48 112.78
L-3 11.00 3.120 115.90 112.78 0.00 117.48 117.48
R-1 4.00 1.290 115.90 114.61 6.00 2.33 117.48 115.15
R-2 6.10 3.150 115.90 112.75 9.70 4.73 117.48 112.75
R-3 11.00 3.150 115.90 112.75 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
52800 C 0.00 2.320 115.90 113.58 52800.00 3.60 117.48 113.88
L-1 3.87 2.970 115.90 112.93 6.00 3.80 117.48 113.68
L-2 6.32 4.000 115.90 111.90 8.70 5.58 117.48 111.90
L-3 9.56 4.000 115.90 111.90 0.00 117.48 117.48
R-1 4.00 2.890 115.90 113.01 6.00 3.82 117.48 113.66
R-2 6.50 4.320 115.90 111.58 9.20 5.90 117.48 111.58
R-3 10.00 4.320 115.90 111.58 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52850 C 0.00 1.320 115.90 114.58 52850.00 2.60 117.48 114.88
L-1 3.92 1.560 115.90 114.34 6.00 2.80 117.48 114.68
L-2 6.50 3.500 115.90 112.40 9.50 5.08 117.48 112.40
L-3 9.63 3.500 115.90 112.40 0.00 117.48 117.48
R-1 4.00 1.460 115.90 114.44 6.00 2.82 117.48 114.66
R-2 6.00 3.260 115.90 112.64 9.10 4.84 117.48 112.64
R-3 11.00 3.260 115.90 112.64 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52900 C 0.00 1.180 115.90 114.72 52900.00 2.46 117.48 115.02
L-1 3.75 1.420 115.90 114.48 6.00 2.66 117.48 114.82
L-2 6.12 3.330 115.90 112.57 9.40 4.91 117.48 112.57
L-3 9.85 3.330 115.90 112.57 0.00 117.48 117.48
R-1 4.00 1.250 115.90 114.65 6.00 2.68 117.48 114.80
R-2 6.00 3.460 115.90 112.44 9.60 5.04 117.48 112.44
R-3 10.00 3.460 115.90 112.44 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
52950 C 0.00 1.590 115.90 114.31 52950.00 2.87 117.48 114.61
L-1 3.96 1.650 115.90 114.25 6.00 3.07 117.48 114.41
L-2 6.10 4.000 115.90 111.90 9.80 5.58 117.48 111.90
L-3 11.23 4.000 115.90 111.90 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.98 1.750 115.90 114.15 6.00 3.09 117.48 114.39
R-2 6.10 3.400 115.90 112.50 8.90 4.98 117.48 112.50
R-3 12.00 3.400 115.90 112.50 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
53000 C 0.00 0.820 115.90 115.08 53000.00 2.10 117.48 115.38
L-1 3.79 0.980 115.90 114.92 6.00 2.30 117.48 115.18
L-2 6.32 2.540 115.90 113.36 8.80 4.12 117.48 113.36
L-3 9.63 2.540 115.90 113.36 0.00 117.48 117.48
R-1 3.98 1.000 115.90 114.90 6.00 2.32 117.48 115.16
R-2 6.00 2.890 115.90 113.01 9.30 4.47 117.48 113.01
R-3 10.00 2.890 115.90 113.01 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
53050 C 0.00 1.600 115.90 114.30 53050.00 2.88 117.48 114.60
L-1 3.95 1.950 115.90 113.95 6.00 3.08 117.48 114.40
L-2 6.50 3.150 115.90 112.75 8.50 4.73 117.48 112.75
L-3 9.60 3.150 115.90 112.75 0.00 117.48 117.48
R-1 4.00 2.000 115.90 113.90 6.00 3.10 117.48 114.38
R-2 6.10 2.900 115.90 113.00 8.10 4.48 117.48 113.00
R-3 9.00 2.900 115.90 113.00 0.00 117.48 117.48
CP 0.00 115.90 115.90 0.00 117.48 117.48
53100 C 0.00 0.900 115.90 115.00 53100.00 2.18 117.48 115.30
L-1 4.00 1.210 115.90 114.69 6.00 2.38 117.48 115.10
L-2 6.00 3.400 115.90 112.50 9.90 4.98 117.48 112.50
L-3 10.65 3.400 115.90 112.50 0.00 117.48 117.48
R-1 3.91 0.950 115.90 114.95 6.00 2.40 117.48 115.08
R-2 6.10 2.600 115.90 113.30 8.70 4.18 117.48 113.30
R-3 12.00 2.600 115.90 113.30 0.00 117.48 117.48
CP 0.00 1.5 2.5 114.90 113.40 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
53150 C 0.00 1.360 114.90 113.54 53150.00 3.64 117.48 113.84
L-1 3.98 1.420 114.90 113.48 6.00 3.84 117.48 113.64
L-2 6.00 3.400 114.90 111.50 9.30 5.98 117.48 111.50
L-3 10.25 3.400 114.90 111.50 0.00 117.48 117.48
R-1 4.00 1.560 114.90 113.34 6.00 3.86 117.48 113.62
R-2 6.50 3.000 114.90 111.90 8.60 5.58 117.48 111.90
R-3 12.00 3.000 114.90 111.90 0.00 117.48 117.48
CP 0.00 114.90 114.90 0.00 117.48 117.48
53200 C 0.00 1.580 114.90 113.32 53200.00 3.86 117.48 113.62
L-1 3.95 1.930 114.90 112.97 6.00 4.06 117.48 113.42
L-2 6.65 2.900 114.90 112.00 8.20 5.48 117.48 112.00
L-3 9.56 2.900 114.90 112.00 0.00 117.48 117.48
R-1 3.90 1.880 114.90 113.02 6.00 4.08 117.48 113.40
R-2 6.60 2.900 114.90 112.00 8.20 5.48 117.48 112.00
R-3 10.00 114.90 114.90 0.00 117.48 117.48
CP 0.00 4.12 0.96 118.06 113.94 0.00 117.48 117.48
53250 C 0.00 4.120 118.06 113.94 53250.00 3.24 117.48 114.24
L-1 3.96 4.200 118.06 113.86 6.00 3.44 117.48 114.04
L-2 6.12 5.600 118.06 112.46 8.40 5.02 117.48 112.46
L-3 9.68 5.600 118.06 112.46 0.00 117.48 117.48
R-1 3.65 4.300 118.06 113.76 6.00 3.46 117.48 114.02
R-2 6.00 5.430 118.06 112.63 7.70 4.55 117.48 112.93
R-3 10.00 5.430 118.06 112.63 0.00 117.48 117.48
CP 0.00 118.06 118.06 0.00 117.48 117.48
53300 C 0.00 2.760 118.06 115.30 53300.00 1.88 117.48 115.60
L-1 3.85 2.820 118.06 115.24 6.00 2.08 117.48 115.40
L-2 6.65 5.560 118.06 112.50 10.40 4.98 117.48 112.50
L-3 12.00 5.560 118.06 112.50 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.99 2.890 118.06 115.17 6.00 2.10 117.48 115.38
R-2 6.63 5.460 118.06 112.60 10.20 4.88 117.48 112.60
R-3 12.00 5.460 118.06 112.60 0.00 117.48 117.48
CP 0.00 118.06 118.06 0.00 117.48 117.48
53350 C 0.00 1.010 118.06 117.05 53350.00 0.13 117.48 117.35
L-1 3.98 1.530 118.06 116.53 6.00 0.33 117.48 117.15
L-2 6.84 3.530 118.06 114.53 10.00 2.95 117.48 114.53
L-3 12.00 3.530 118.06 114.53 0.00 117.48 117.48
R-1 4.00 1.400 118.06 116.66 6.00 0.35 117.48 117.13
R-2 6.00 3.460 118.06 114.60 9.80 2.88 117.48 114.60
R-3 12.00 3.460 118.06 114.60 0.00 117.48 117.48
CP 0.00 118.06 118.06 0.00 117.48 117.48
53400 C 0.00 1.300 118.06 116.76 53400.00 0.42 117.48 117.06
L-1 3.95 1.570 118.06 116.49 6.00 0.62 117.48 116.86
L-2 6.50 3.450 118.06 114.61 9.40 2.87 117.48 114.61
L-3 9.68 3.450 118.06 114.61 0.00 117.48 117.48
R-1 3.91 1.480 118.06 116.58 6.00 0.64 117.48 116.84
R-2 6.32 2.980 118.06 115.08 8.70 2.40 117.48 115.08
R-3 9.00 2.980 118.06 115.08 0.00 117.48 117.48
CP 0.00 118.06 118.06 0.00 117.48 117.48
53450 C 0.00 1.960 118.06 116.10 53450.00 1.08 117.48 116.40
L-1 3.92 2.080 118.06 115.98 6.00 1.28 117.48 116.20
L-2 6.33 3.450 118.06 114.61 8.40 2.87 117.48 114.61
L-3 7.56 3.450 118.06 114.61 0.00 117.48 117.48
R-1 4.00 2.000 118.06 116.06 6.00 1.30 117.48 116.18
R-2 6.10 3.680 118.06 114.38 8.80 3.10 117.48 114.38
R-3 10.00 3.680 118.06 114.38 0.00 117.48 117.48
CP 0.00 0.51 2.89 115.68 115.17 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
53500 C 0.00 0.510 115.68 115.17 53500.00 2.01 117.48 115.47
L-1 3.98 0.550 115.68 115.13 6.00 2.21 117.48 115.27
L-2 6.35 2.560 115.68 113.12 9.30 4.36 117.48 113.12
L-3 9.86 2.560 115.68 113.12 0.00 117.48 117.48
R-1 4.00 0.800 115.68 114.88 6.00 2.23 117.48 115.25
R-2 6.50 2.600 115.68 113.08 9.30 4.40 117.48 113.08
R-3 10.00 2.600 115.68 113.08 0.00 117.48 117.48
CP 0.00 115.68 115.68 0.00 117.48 117.48
53550 C 0.00 1.010 115.68 114.67 53550.00 2.51 117.48 114.97
L-1 3.90 1.300 115.68 114.38 6.00 2.71 117.48 114.77
L-2 6.65 3.120 115.68 112.56 9.40 4.92 117.48 112.56
L-3 9.65 3.120 115.68 112.56 0.00 117.48 117.48
R-1 4.00 1.470 115.68 114.21 6.00 2.73 117.48 114.75
R-2 6.00 3.210 115.68 112.47 9.50 5.01 117.48 112.47
R-3 12.00 3.210 115.68 112.47 0.00 117.48 117.48
CP 0.00 115.68 115.68 0.00 117.48 117.48
53600 C 0.00 1.290 115.68 114.39 53600.00 2.79 117.48 114.69
L-1 3.76 1.600 115.68 114.08 6.00 2.99 117.48 114.49
L-2 6.84 3.360 115.68 112.32 9.30 5.16 117.48 112.32
L-3 10.00 3.360 115.68 112.32 0.00 117.48 117.48
R-1 3.98 1.680 115.68 114.00 6.00 3.01 117.48 114.47
R-2 6.34 3.700 115.68 111.98 9.80 5.50 117.48 111.98
R-3 10.00 3.700 115.68 111.98 0.00 117.48 117.48
CP 0.00 1.2 0.5 116.38 115.18 0.00 117.48 117.48
53650 C 0.00 1.100 116.38 115.28 53650.00 1.90 117.48 115.58
L-1 3.86 1.250 116.38 115.13 6.00 2.10 117.48 115.38
L-2 6.10 2.800 116.38 113.58 8.70 3.90 117.48 113.58
L-3 12.32 2.800 116.38 113.58 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.98 1.350 116.38 115.03 6.00 2.12 117.48 115.36
R-2 6.10 2.980 116.38 113.40 9.00 4.08 117.48 113.40
R-3 12.00 2.980 116.38 113.40 0.00 117.48 117.48
CP 0.00 116.38 116.38 0.00 117.48 117.48
53700 C 0.00 1.370 116.38 115.01 53700.00 2.17 117.48 115.31
L-1 3.90 1.890 116.38 114.49 6.00 2.37 117.48 115.11
L-2 5.98 3.120 116.38 113.26 8.80 4.22 117.48 113.26
L-3 12.00 3.120 116.38 113.26 0.00 117.48 117.48
R-1 4.00 1.800 116.38 114.58 6.00 2.39 117.48 115.09
R-2 6.10 3.420 116.38 112.96 9.20 4.52 117.48 112.96
R-3 12.00 3.420 116.38 112.96 0.00 117.48 117.48
CP 0.00 116.38 116.38 0.00 117.48 117.48
53750 C 0.00 1.320 116.38 115.06 53750.00 2.12 117.48 115.36
L-1 3.95 1.340 116.38 115.04 6.00 2.32 117.48 115.16
L-2 6.50 2.900 116.38 113.48 8.60 4.00 117.48 113.48
L-3 7.85 2.900 116.38 113.48 0.00 117.48 117.48
R-1 3.98 1.350 116.38 115.03 6.00 2.34 117.48 115.14
R-2 6.10 3.120 116.38 113.26 8.90 4.22 117.48 113.26
R-3 10.00 3.120 116.38 113.26 0.00 117.48 117.48
CP 0.00 116.38 116.38 0.00 117.48 117.48
53800 C 0.00 1.730 116.38 114.65 53800.00 2.53 117.48 114.95
L-1 3.98 1.900 116.38 114.48 6.00 2.73 117.48 114.75
L-2 6.68 3.450 116.38 112.93 8.80 4.55 117.48 112.93
L-3 9.00 3.450 116.38 112.93 0.00 117.48 117.48
R-1 4.00 1.800 116.38 114.58 6.00 2.75 117.48 114.73
R-2 6.10 3.600 116.38 112.78 9.00 4.70 117.48 112.78
R-3 12.00 3.600 116.38 112.78 0.00 117.48 117.48
CP 0.00 116.38 116.38 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
53850 C 0.00 1.680 116.38 114.70 53850.00 2.48 117.48 115.00
L-1 4.00 1.900 116.38 114.48 6.00 2.68 117.48 114.80
L-2 6.53 3.650 116.38 112.73 9.20 4.75 117.48 112.73
L-3 10.23 3.650 116.38 112.73 0.00 117.48 117.48
R-1 4.00 1.900 116.38 114.48 6.00 2.70 117.48 114.78
R-2 6.50 4.200 116.38 112.18 9.90 5.30 117.48 112.18
R-3 12.00 4.200 116.38 112.18 0.00 117.48 117.48
CP 0.00 116.38 116.38 0.00 117.48 117.48
53900 C 0.00 2.800 116.38 113.58 53900.00 3.60 117.48 113.88
L-1 3.95 3.600 116.38 112.78 6.00 3.80 117.48 113.68
L-2 6.00 4.700 116.38 111.68 9.00 5.80 117.48 111.68
L-3 10.56 4.700 116.38 111.68 0.00 117.48 117.48
R-1 4.00 3.000 116.38 113.38 6.00 3.82 117.48 113.66
R-2 6.12 4.700 116.38 111.68 9.00 5.80 117.48 111.68
R-3 10.00 4.700 116.38 111.68 0.00 117.48 117.48
CP 0.00 116.38 116.38 0.00 117.48 117.48
53950 C 0.00 1.360 116.38 115.02 53950.00 2.16 117.48 115.32
L-1 3.92 1.420 116.38 114.96 6.00 2.36 117.48 115.12
L-2 6.12 3.900 116.38 112.48 10.00 5.00 117.48 112.48
L-3 12.65 3.900 116.38 112.48 0.00 117.48 117.48
R-1 4.00 1.530 116.38 114.85 6.00 2.38 117.48 115.10
R-2 5.96 3.700 116.38 112.68 9.70 4.80 117.48 112.68
R-3 12.00 3.700 116.38 112.68 0.00 117.48 117.48
CP 0.00 116.38 116.38 0.00 117.48 117.48
54000 C 0.00 1.260 116.38 115.12 54000.00 2.06 117.48 115.42
L-1 4.00 1.500 116.38 114.88 6.00 2.26 117.48 115.22
L-2 6.10 3.400 116.38 112.98 9.40 4.50 117.48 112.98
L-3 11.23 3.400 116.38 112.98 0.00 117.48 117.48
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.99 1.500 116.38 114.88 6.00 2.28 117.48 115.20
R-2 6.10 3.400 116.38 112.98 9.40 4.50 117.48 112.98
R-3 11.00 3.400 116.38 112.98 0.00 117.48 117.48
CP 0.00 3.75 0.58 119.55 115.80 0.00 117.48 117.48
54050 C 0.00 3.730 119.55 115.82 54050.00 1.36 117.48 116.12
L-1 3.79 3.800 119.55 115.75 6.00 1.56 117.48 115.92
L-2 6.46 4.500 119.55 115.05 7.40 2.43 117.48 115.05
L-3 8.00 4.500 119.55 115.05 0.00 117.48 117.48
R-1 3.78 3.800 119.55 115.75 6.00 1.58 117.48 115.90
R-2 6.00 4.410 119.55 115.14 7.20 2.34 117.48 115.14
R-3 7.50 4.410 119.55 115.14 0.00 117.48 117.48
CP 0.00 119.55 119.55 0.00 3.50 1.2 119.78 116.28
54100 C 0.00 1.790 119.55 117.76 54100.00 1.72 119.78 118.06
L-1 3.95 2.000 119.55 117.55 6.00 1.92 119.78 117.86
L-2 6.50 4.000 119.55 115.55 9.50 4.23 119.78 115.55
L-3 9.87 4.000 119.55 115.55 0.00 119.78 119.78
R-1 4.00 2.000 119.55 117.55 6.00 1.94 119.78 117.84
R-2 6.10 4.000 119.55 115.55 9.50 4.23 119.78 115.55
R-3 10.00 4.000 119.55 115.55 0.00 119.78 119.78
CP 0.00 119.55 119.55 0.00 119.78 119.78
54150 C 0.00 1.780 119.55 117.77 54150.00 1.71 119.78 118.07
L-1 3.86 1.840 119.55 117.71 6.00 1.91 119.78 117.87
L-2 5.98 4.000 119.55 115.55 9.80 4.44 119.78 115.34
L-3 11.00 4.000 119.55 115.55 0.00 119.78 119.78
R-1 4.00 1.810 119.55 117.74 6.00 1.93 119.78 117.85
R-2 6.10 3.560 119.55 115.99 8.80 3.79 119.78 115.99
R-3 11.00 3.560 119.55 115.99 0.00 119.78 119.78
CP 0.00 119.55 119.55 0.00 119.78 119.78
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
54200 C 0.00 0.700 119.55 118.85 54200.00 0.63 119.78 119.15
L-1 3.76 1.150 119.55 118.40 6.00 0.83 119.78 118.95
L-2 6.63 3.420 119.55 116.13 10.30 3.65 119.78 116.13
L-3 11.00 3.420 119.55 116.13 0.00 119.78 119.78
R-1 4.00 0.700 119.55 118.85 6.00 0.85 119.78 118.93
R-2 6.83 3.450 119.55 116.10 10.30 3.68 119.78 116.10
R-3 11.00 3.450 119.55 116.10 0.00 119.78 119.78
CP 0.00 119.55 119.55 0.00 119.78 119.78
54250 C 0.00 1.540 119.55 118.01 54250.00 1.47 119.78 118.31
L-1 3.95 1.600 119.55 117.95 6.00 1.67 119.78 118.11
L-2 5.98 3.450 119.55 116.10 9.10 3.68 119.78 116.10
L-3 10.00 3.450 119.55 116.10 0.00 119.78 119.78
R-1 3.86 1.650 119.55 117.90 6.00 1.69 119.78 118.09
R-2 6.00 3.000 119.55 116.55 10.00 4.35 119.78 115.43
R-3 10.00 3.000 119.55 116.55 0.00 119.78 119.78
CP 0.00 119.55 119.55 0.00 119.78 119.78
54300 C 0.00 1.260 119.55 118.29 54300.00 1.19 119.78 118.59
L-1 3.85 1.410 119.55 118.14 6.00 1.39 119.78 118.39
L-2 6.12 3.500 119.55 116.05 10.10 4.12 119.78 115.66
L-3 11.00 3.500 119.55 116.05 0.00 119.78 119.78
R-1 3.96 1.500 119.55 118.05 6.00 1.41 119.78 118.37
R-2 6.00 2.560 119.55 116.99 8.10 2.79 119.78 116.99
R-3 11.00 2.560 119.55 116.99 0.00 119.78 119.78
CP 0.00 0.63 1.47 118.71 118.08 0.00 119.78 119.78
54350 C 0.00 0.630 118.71 118.08 54350.00 1.40 119.78 118.38
L-1 3.94 0.830 118.71 117.88 6.00 1.60 119.78 118.18
L-2 6.32 2.100 118.71 116.61 8.40 3.17 119.78 116.61
L-3 10.00 2.100 118.71 116.61 0.00 119.78 119.78
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.82 0.800 118.71 117.91 6.00 1.62 119.78 118.16
R-2 6.10 2.130 118.71 116.58 8.40 3.20 119.78 116.58
R-3 11.00 2.130 118.71 116.58 0.00 119.78 119.78
CP 0.00 118.71 118.71 0.00 119.78 119.78
54400 C 0.00 1.250 118.71 117.46 54400.00 2.02 119.78 117.76
L-1 3.89 1.400 118.71 117.31 6.00 2.22 119.78 117.56
L-2 6.42 3.200 118.71 115.51 9.70 4.63 119.78 115.15
L-3 11.00 3.200 118.71 115.51 0.00 119.78 119.78
R-1 4.00 1.550 118.71 117.16 6.00 2.24 119.78 117.54
R-2 5.98 3.100 118.71 115.61 9.50 4.52 119.78 115.26
R-3 12.00 3.100 118.71 115.61 0.00 119.78 119.78
CP 0.00 118.71 118.71 0.00 119.78 119.78
54450 C 0.00 1.670 118.71 117.04 54450.00 2.44 119.78 117.34
L-1 3.75 1.900 118.71 116.81 6.00 2.64 119.78 117.14
L-2 6.85 3.600 118.71 115.11 9.10 4.67 119.78 115.11
L-3 11.00 3.600 118.71 115.11 0.00 119.78 119.78
R-1 3.98 2.010 118.71 116.70 6.00 2.66 119.78 117.12
R-2 6.68 3.450 118.71 115.26 8.80 4.52 119.78 115.26
R-3 12.00 3.450 118.71 115.26 0.00 119.78 119.78
CP 0.00 118.71 118.71 0.00 119.78 119.78
54500 C 0.00 1.010 118.71 117.70 54500.00 1.78 119.78 118.00
L-1 4.00 1.300 118.71 117.41 6.00 1.98 119.78 117.80
L-2 6.46 2.450 118.71 116.26 8.40 3.52 119.78 116.26
L-3 9.00 2.450 118.71 116.26 0.00 119.78 119.78
R-1 3.92 1.470 118.71 117.24 6.00 2.00 119.78 117.78
R-2 6.52 2.450 118.71 116.26 8.30 3.52 119.78 116.26
R-3 11.00 2.450 118.71 116.26 0.00 119.78 119.78
CP 0.00 118.71 118.71 0.00 119.78 119.78
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
54550 C 0.00 1.290 118.71 117.42 54550.00 2.06 119.78 117.72
L-1 4.00 1.730 118.71 116.98 6.00 2.26 119.78 117.52
L-2 6.12 2.650 118.71 116.06 8.20 3.72 119.78 116.06
L-3 9.86 2.650 118.71 116.06 0.00 119.78 119.78
R-1 3.86 1.800 118.71 116.91 6.00 2.28 119.78 117.50
R-2 6.64 3.700 118.71 115.01 9.80 4.77 119.78 115.01
R-3 12.00 3.700 118.71 115.01 0.00 119.78 119.78
CP 0.00 118.71 118.71 0.00 119.78 119.78
54600 C 0.00 2.000 118.71 116.71 54600.00 2.77 119.78 117.01
L-1 3.78 2.100 118.71 116.61 6.00 2.97 119.78 116.81
L-2 6.65 4.000 118.71 114.71 9.20 5.07 119.78 114.71
L-3 12.00 4.000 118.71 114.71 0.00 119.78 119.78
R-1 3.98 2.150 118.71 116.56 6.00 2.99 119.78 116.79
R-2 6.00 4.150 118.71 114.56 9.40 5.22 119.78 114.56
R-3 12.00 4.150 118.71 114.56 0.00 119.78 119.78
CP 0.00 118.71 118.71 0.00 119.78 119.78
54650 C 0.00 1.370 118.71 117.34 54650.00 2.14 119.78 117.64
L-1 3.90 2.000 118.71 116.71 6.00 2.34 119.78 117.44
L-2 6.52 4.800 118.71 113.91 11.30 5.87 119.78 113.91
L-3 11.98 4.800 118.71 113.91 0.00 119.78 119.78
R-1 3.96 2.000 118.71 116.71 6.00 2.36 119.78 117.42
R-2 6.00 4.100 118.71 114.61 10.30 5.17 119.78 114.61
R-3 11.00 4.100 118.71 114.61 0.00 119.78 119.78
CP 0.00 118.71 118.71 0.00 119.78 119.78
54700 C 0.00 1.320 118.71 117.39 54700.00 2.09 119.78 117.69
L-1 3.90 1.340 118.71 117.37 6.00 2.29 119.78 117.49
L-2 6.10 1.930 118.71 116.78 7.10 3.00 119.78 116.78
L-3 7.56 1.930 118.71 116.78 0.00 119.78 119.78
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.84 1.350 118.71 117.36 6.00 2.31 119.78 117.47
R-2 6.10 2.150 118.71 116.56 7.40 3.22 119.78 116.56
R-3 7.56 2.150 118.71 116.56 0.00 119.78 119.78
CP 0.00 118.71 118.71 0.00 119.78 119.78
54750 C 0.00 1.730 118.71 116.98 54750.00 2.50 119.78 117.28
L-1 3.88 1.850 118.71 116.86 6.00 2.70 119.78 117.08
L-2 6.00 2.950 118.71 115.76 8.00 4.02 119.78 115.76
L-3 9.00 2.950 118.71 115.76 0.00 119.78 119.78
R-1 3.94 1.950 118.71 116.76 6.00 2.72 119.78 117.06
R-2 3.10 3.600 118.71 115.11 9.00 4.67 119.78 115.11
R-3 10.00 3.600 118.71 115.11 0.00 119.78 119.78
CP 0.00 118.71 118.71 0.00 119.78 119.78
54800 C 0.00 1.680 118.71 117.03 54800.00 2.45 119.78 117.33
L-1 3.95 1.950 118.71 116.76 6.00 2.65 119.78 117.13
L-2 6.50 3.400 118.71 115.31 8.80 4.47 119.78 115.31
L-3 9.80 3.400 118.71 115.31 0.00 119.78 119.78
R-1 4.00 1.900 118.71 116.81 6.00 2.67 119.78 117.11
R-2 6.10 4.200 118.71 114.51 9.90 5.27 119.78 114.51
R-3 11.00 4.200 118.71 114.51 0.00 119.78 119.78
CP 0.00 118.71 118.71 0.00 119.78 119.78
54850 C 0.00 2.800 118.71 115.91 54850.00 3.57 119.78 116.21
L-1 3.75 2.900 118.71 115.81 6.00 3.77 119.78 116.01
L-2 5.94 4.700 118.71 114.01 9.00 5.77 119.78 114.01
L-3 10.69 4.700 118.71 114.01 0.00 119.78 119.78
R-1 4.00 2.950 118.71 115.76 6.00 3.79 119.78 115.99
R-2 6.10 4.700 118.71 114.01 9.00 5.77 119.78 114.01
R-3 11.00 4.700 118.71 114.01 0.00 119.78 119.78
CP 0.00 118.71 118.71 0.00 119.78 119.78
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
54900 C 0.00 1.360 118.71 117.35 54900.00 2.13 119.78 117.65
L-1 3.78 1.420 118.71 117.29 6.00 2.33 119.78 117.45
L-2 6.16 3.900 118.71 114.81 10.00 4.97 119.78 114.81
L-3 12.00 3.900 118.71 114.81 0.00 119.78 119.78
R-1 3.86 1.600 118.71 117.11 6.00 2.35 119.78 117.43
R-2 6.50 3.700 118.71 115.01 9.70 4.77 119.78 115.01
R-3 12.00 3.700 118.71 115.01 0.00 119.78 119.78
CP 0.00 118.71 118.71 0.00 119.78 119.78
54950 C 0.00 1.260 118.71 117.45 54950.00 2.03 119.78 117.75
L-1 3.72 1.500 118.71 117.21 6.00 2.23 119.78 117.55
L-2 6.34 3.400 118.71 115.31 9.40 4.47 119.78 115.31
L-3 10.56 3.400 118.71 115.31 0.00 119.78 119.78
R-1 3.85 1.500 118.71 117.21 6.00 2.25 119.78 117.53
R-2 6.00 3.400 118.71 115.31 9.40 4.47 119.78 115.31
R-3 12.00 3.500 118.71 115.21 0.00 119.78 119.78
CP 0.00 3.75 0.58 121.88 118.13 0.00 119.78 119.78
55000 C 0.00 3.730 121.88 118.15 55000.00 1.33 119.78 118.45
L-1 3.90 3.900 121.88 117.98 6.00 1.53 119.78 118.25
L-2 6.12 5.900 121.88 115.98 9.50 3.80 119.78 115.98
L-3 11.00 5.900 121.88 115.98 0.00 119.78 119.78
R-1 4.00 3.900 121.88 117.98 6.00 1.55 119.78 118.23
R-2 5.96 5.460 121.88 116.42 8.80 3.36 119.78 116.42
R-3 11.00 5.460 121.88 116.42 0.00 119.78 119.78
CP 0.00 121.88 121.88 0.00 3.50 0.9 122.38 118.88
55050 C 0.00 1.790 121.88 120.09 55050.00 1.99 122.38 120.39
L-1 3.88 2.000 121.88 119.88 6.00 2.19 122.38 120.19
L-2 6.34 4.690 121.88 117.19 10.50 5.19 122.38 117.19
L-3 12.00 4.690 121.88 117.19 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.85 2.100 121.88 119.78 6.00 2.21 122.38 120.17
R-2 6.10 4.980 121.88 116.90 11.00 5.48 122.38 116.90
R-3 12.00 4.980 121.88 116.90 0.00 122.38 122.38
CP 0.00 121.88 121.88 0.00 122.38 122.38
55100 C 0.00 1.780 121.88 120.10 55100.00 1.98 122.38 120.40
L-1 3.81 1.840 121.88 120.04 6.00 2.18 122.38 120.20
L-2 6.00 3.300 121.88 118.58 8.50 3.80 122.38 118.58
L-3 10.00 3.300 121.88 118.58 0.00 122.38 122.38
R-1 3.96 1.810 121.88 120.07 6.00 2.20 122.38 120.18
R-2 6.00 3.810 121.88 118.07 9.20 4.31 122.38 118.07
R-3 10.00 3.810 121.88 118.07 0.00 122.38 122.38
CP 0.00 121.88 121.88 0.00 122.38 122.38
55150 C 0.00 0.700 121.88 121.18 55150.00 0.90 122.38 121.48
L-1 3.95 0.900 121.88 120.98 6.00 1.10 122.38 121.28
L-2 6.50 3.780 121.88 118.10 10.80 4.28 122.38 118.10
L-3 11.00 3.780 121.88 118.10 0.00 122.38 122.38
R-1 4.00 0.850 121.88 121.03 6.00 1.12 122.38 121.26
R-2 6.10 3.450 121.88 118.43 10.30 3.95 122.38 118.43
R-3 11.00 3.450 121.88 118.43 0.00 122.38 122.38
CP 0.00 121.88 121.88 0.00 122.38 122.38
55200 C 0.00 1.540 121.88 120.34 55200.00 1.74 122.38 120.64
L-1 3.94 1.600 121.88 120.28 6.00 1.94 122.38 120.44
L-2 6.00 3.250 121.88 118.63 8.80 3.75 122.38 118.63
L-3 10.00 3.250 121.88 118.63 0.00 122.38 122.38
R-1 3.98 1.650 121.88 120.23 6.00 1.96 122.38 120.42
R-2 6.62 2.980 121.88 118.90 8.30 3.48 122.38 118.90
R-3 12.00 2.980 121.88 118.90 0.00 122.38 122.38
CP 0.00 121.88 121.88 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
55250 C 0.00 1.260 121.88 120.62 55250.00 1.46 122.38 120.92
L-1 4.00 1.410 121.88 120.47 6.00 1.66 122.38 120.72
L-2 6.54 3.150 121.88 118.73 9.00 3.65 122.38 118.73
L-3 10.00 3.150 121.88 118.73 0.00 122.38 122.38
R-1 3.98 1.500 121.88 120.38 6.00 1.68 122.38 120.70
R-2 6.50 2.500 121.88 119.38 8.00 3.00 122.38 119.38
R-3 12.00 2.500 121.88 119.38 0.00 122.38 122.38
CP 0.00 0.63 1.47 121.04 120.41 0.00 122.38 122.38
55300 C 0.00 0.630 121.04 120.41 55300.00 1.67 122.38 120.71
L-1 3.96 0.830 121.04 120.21 6.00 1.87 122.38 120.51
L-2 6.12 2.450 121.04 118.59 8.90 3.79 122.38 118.59
L-3 10.00 2.450 121.04 118.59 0.00 122.38 122.38
R-1 3.90 0.820 121.04 120.22 6.00 1.89 122.38 120.49
R-2 6.00 2.820 121.04 118.22 9.50 4.16 122.38 118.22
R-3 10.00 2.820 121.04 118.22 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
55350 C 0.00 1.250 121.04 119.79 55350.00 2.29 122.38 120.09
L-1 3.98 1.600 121.04 119.44 6.00 2.49 122.38 119.89
L-2 6.55 3.600 121.04 117.44 9.70 4.94 122.38 117.44
L-3 11.00 3.600 121.04 117.44 0.00 122.38 122.38
R-1 4.00 1.400 121.04 119.64 6.00 2.51 122.38 119.87
R-2 6.00 3.450 121.04 117.59 9.50 4.79 122.38 117.59
R-3 12.00 3.450 121.04 117.59 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
55400 C 0.00 1.670 121.04 119.37 55400.00 2.71 122.38 119.67
L-1 3.97 1.900 121.04 119.14 6.00 2.91 122.38 119.47
L-2 6.65 3.900 121.04 117.14 9.50 5.24 122.38 117.14
L-3 10.25 3.900 121.04 117.14 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 4.00 2.010 121.04 119.03 6.00 2.93 122.38 119.45
R-2 6.10 2.980 121.04 118.06 8.10 4.32 122.38 118.06
R-3 12.00 2.980 121.04 118.06 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
55450 C 0.00 1.600 121.04 119.44 55450.00 2.64 122.38 119.74
L-1 3.96 1.950 121.04 119.09 6.00 2.84 122.38 119.54
L-2 6.22 3.450 121.04 117.59 9.00 4.79 122.38 117.59
L-3 12.00 3.450 121.04 117.59 0.00 122.38 122.38
R-1 4.00 2.010 121.04 119.03 6.00 2.86 122.38 119.52
R-2 6.10 3.650 121.04 117.39 9.20 4.99 122.38 117.39
R-3 12.00 3.650 121.04 117.39 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 4.80 4.8 122.38 117.58
55500 C 0.00 0.900 121.04 120.14 55500.00 1.94 122.38 120.44
L-1 3.98 1.210 121.04 119.83 6.00 2.14 122.38 120.24
L-2 6.54 3.400 121.04 117.64 9.90 4.74 122.38 117.64
L-3 12.00 3.400 121.04 117.64 0.00 122.38 122.38
R-1 4.00 0.950 121.04 120.09 6.00 2.16 122.38 120.22
R-2 6.50 3.560 121.04 117.48 10.20 4.90 122.38 117.48
R-3 8.50 3.560 121.04 117.48 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
55550 C 0.00 1.360 121.04 119.68 55550.00 2.40 122.38 119.98
L-1 3.92 1.420 121.04 119.62 6.00 2.60 122.38 119.78
L-2 6.68 4.120 121.04 116.92 10.30 5.46 122.38 116.92
L-3 10.96 4.120 121.04 116.92 0.00 122.38 122.38
R-1 4.00 1.540 121.04 119.50 6.00 2.62 122.38 119.76
R-2 6.16 4.050 121.04 116.99 10.20 5.39 122.38 116.99
R-3 12.00 4.050 121.04 116.99 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
55600 C 0.00 1.580 121.04 119.46 55600.00 2.62 122.38 119.76
L-1 3.78 1.930 121.04 119.11 6.00 2.82 122.38 119.56
L-2 6.00 3.000 121.04 118.04 8.30 4.34 122.38 118.04
L-3 10.00 3.000 121.04 118.04 0.00 122.38 122.38
R-1 3.85 1.880 121.04 119.16 6.00 2.84 122.38 119.54
R-2 6.23 3.880 121.04 117.16 9.60 5.22 122.38 117.16
R-3 10.00 3.880 121.04 117.16 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
55650 C 0.00 4.120 121.04 116.92 55650.00 5.16 122.38 117.22
L-1 4.00 4.200 121.04 116.84 6.00 5.36 122.38 117.02
L-2 6.32 5.690 121.04 115.35 8.60 7.03 122.38 115.35
L-3 9.00 5.690 121.04 115.35 0.00 122.38 122.38
R-1 3.95 4.520 121.04 116.52 6.00 5.38 122.38 117.00
R-2 6.54 5.520 121.04 115.52 8.30 6.86 122.38 115.52
R-3 10.00 5.520 121.04 115.52 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
55700 C 0.00 2.760 121.04 118.28 55700.00 3.80 122.38 118.58
L-1 4.00 2.820 121.04 118.22 6.00 4.00 122.38 118.38
L-2 6.35 3.600 121.04 117.44 7.50 4.94 122.38 117.44
L-3 8.96 3.600 121.04 117.44 0.00 122.38 122.38
R-1 3.95 2.890 121.04 118.15 6.00 4.02 122.38 118.36
R-2 6.54 4.000 121.04 117.04 8.00 5.34 122.38 117.04
R-3 9.00 4.000 121.04 117.04 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
55750 C 0.00 1.010 121.04 120.03 55750.00 2.05 122.38 120.33
L-1 3.92 1.530 121.04 119.51 6.00 2.25 122.38 120.13
L-2 6.30 3.500 121.04 117.54 9.90 4.84 122.38 117.54
L-3 10.00 3.500 121.04 117.54 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.86 1.400 121.04 119.64 6.00 2.27 122.38 120.11
R-2 7.56 2.980 121.04 118.06 9.10 4.32 122.38 118.06
R-3 10.00 2.980 121.04 118.06 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
55800 C 0.00 1.000 121.04 120.04 55800.00 2.04 122.38 120.34
L-1 3.98 1.300 121.04 119.74 6.00 2.24 122.38 120.14
L-2 6.00 2.900 121.04 118.14 9.00 4.24 122.38 118.14
L-3 10.00 2.900 121.04 118.14 0.00 122.38 122.38
R-1 3.86 1.480 121.04 119.56 6.00 2.26 122.38 120.12
R-2 6.00 2.450 121.04 118.59 8.30 3.79 122.38 118.59
R-3 11.00 2.450 121.04 118.59 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
55850 C 0.00 1.960 121.04 119.08 55850.00 3.00 122.38 119.38
L-1 3.86 2.080 121.04 118.96 6.00 3.20 122.38 119.18
L-2 6.35 3.450 121.04 117.59 8.40 4.79 122.38 117.59
L-3 10.00 3.450 121.04 117.59 0.00 122.38 122.38
R-1 3.76 2.100 121.04 118.94 6.00 3.22 122.38 119.16
R-2 6.00 3.000 121.04 118.04 7.70 4.34 122.38 118.04
R-3 10.00 3.000 121.04 118.04 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
55900 C 0.00 0.510 121.04 120.53 55900.00 1.55 122.38 120.83
L-1 3.85 0.550 121.04 120.49 6.00 1.75 122.38 120.63
L-2 6.36 3.450 121.04 117.59 10.60 4.79 122.38 117.59
L-3 14.00 3.450 121.04 117.59 0.00 122.38 122.38
R-1 4.00 0.700 121.04 120.34 6.00 1.77 122.38 120.61
R-2 6.00 3.650 121.04 117.39 10.90 4.99 122.38 117.39
R-3 15.00 3.650 121.04 117.39 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
55950 C 0.00 1.010 121.04 120.03 55950.00 2.05 122.38 120.33
L-1 3.78 1.300 121.04 119.74 6.00 2.25 122.38 120.13
L-2 6.05 3.120 121.04 117.92 9.40 4.46 122.38 117.92
L-3 10.00 3.120 121.04 117.92 0.00 122.38 122.38
R-1 3.93 1.200 121.04 119.84 6.00 2.27 122.38 120.11
R-2 6.50 2.560 121.04 118.48 8.50 3.90 122.38 118.48
R-3 10.00 2.560 121.04 118.48 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56000 C 0.00 1.290 121.04 119.75 56000.00 2.33 122.38 120.05
L-1 3.94 1.730 121.04 119.31 6.00 2.53 122.38 119.85
L-2 6.52 3.800 121.04 117.24 10.00 5.14 122.38 117.24
L-3 11.00 3.800 121.04 117.24 0.00 122.38 122.38
R-1 3.79 1.800 121.04 119.24 6.00 2.55 122.38 119.83
R-2 6.00 3.700 121.04 117.34 9.80 5.04 122.38 117.34
R-3 11.00 3.700 121.04 117.34 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56050 C 0.00 2.000 121.04 119.04 56050.00 3.04 122.38 119.34
L-1 3.91 2.100 121.04 118.94 6.00 3.24 122.38 119.14
L-2 6.52 4.500 121.04 116.54 9.90 5.84 122.38 116.54
L-3 10.00 4.500 121.04 116.54 0.00 122.38 122.38
R-1 3.76 2.150 121.04 118.89 6.00 3.26 122.38 119.12
R-2 6.00 4.600 121.04 116.44 10.10 5.94 122.38 116.44
R-3 12.00 4.600 121.04 116.44 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56100 C 0.00 1.370 121.04 119.67 56100.00 2.41 122.38 119.97
L-1 3.79 1.450 121.04 119.59 6.00 2.61 122.38 119.77
L-2 6.31 4.800 121.04 116.24 11.30 6.14 122.38 116.24
L-3 12.86 4.800 121.04 116.24 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.88 1.500 121.04 119.54 6.00 2.63 122.38 119.75
R-2 6.10 4.900 121.04 116.14 11.50 6.24 122.38 116.14
R-3 12.00 4.900 121.04 116.14 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56150 C 0.00 1.600 121.04 119.44 56150.00 2.64 122.38 119.74
L-1 3.78 1.950 121.04 119.09 6.00 2.84 122.38 119.54
L-2 6.64 2.900 121.04 118.14 8.20 4.24 122.38 118.14
L-3 11.00 2.900 121.04 118.14 0.00 122.38 122.38
R-1 3.85 1.700 121.04 119.34 6.00 2.86 122.38 119.52
R-2 6.00 2.900 121.04 118.14 8.10 4.24 122.38 118.14
R-3 9.00 2.900 121.04 118.14 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56200 C 0.00 0.900 121.04 120.14 56200.00 1.94 122.38 120.44
L-1 3.95 1.000 121.04 120.04 6.00 2.14 122.38 120.24
L-2 6.50 4.120 121.04 116.92 11.00 5.46 122.38 116.92
L-3 12.00 4.120 121.04 116.92 0.00 122.38 122.38
R-1 4.00 0.950 121.04 120.09 6.00 2.16 122.38 120.22
R-2 6.00 4.560 121.04 116.48 11.70 5.90 122.38 116.48
R-3 12.00 4.560 121.04 116.48 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56250 C 0.00 1.360 121.04 119.68 56250.00 2.40 122.38 119.98
L-1 4.00 1.420 121.04 119.62 6.00 2.60 122.38 119.78
L-2 5.95 4.560 121.04 116.48 11.00 5.90 122.38 116.48
L-3 12.00 4.560 121.04 116.48 0.00 122.38 122.38
R-1 3.95 1.500 121.04 119.54 6.00 2.62 122.38 119.76
R-2 6.12 4.230 121.04 116.81 10.50 5.57 122.38 116.81
R-3 12.00 4.230 121.04 116.81 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
56300 C 0.00 1.580 121.04 119.46 56300.00 2.62 122.38 119.76
L-1 3.84 1.930 121.04 119.11 6.00 2.82 122.38 119.56
L-2 6.00 4.560 121.04 116.48 10.70 5.90 122.38 116.48
L-3 12.00 4.560 121.04 116.48 0.00 122.38 122.38
R-1 3.97 1.880 121.04 119.16 6.00 2.84 122.38 119.54
R-2 6.50 4.650 121.04 116.39 10.80 5.99 122.38 116.39
R-3 12.00 4.650 121.04 116.39 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56350 C 0.00 1.100 121.04 119.94 56350.00 2.14 122.38 120.24
L-1 3.95 1.300 121.04 119.74 6.00 2.34 122.38 120.04
L-2 6.00 4.560 121.04 116.48 11.40 5.90 122.38 116.48
L-3 15.00 4.560 121.04 116.48 0.00 122.38 122.38
R-1 4.00 1.450 121.04 119.59 6.00 2.36 122.38 120.02
R-2 6.00 4.900 121.04 116.14 11.90 6.24 122.38 116.14
R-3 15.00 4.900 121.04 116.14 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56400 C 0.00 1.230 121.04 119.81 56400.00 2.27 122.38 120.11
L-1 4.00 1.560 121.04 119.48 6.00 2.47 122.38 119.91
L-2 6.12 3.980 121.04 117.06 10.30 5.32 122.38 117.06
L-3 12.00 3.980 121.04 117.06 0.00 122.38 122.38
R-1 3.81 1.650 121.04 119.39 6.00 2.49 122.38 119.89
R-2 6.08 4.560 121.04 116.48 11.20 5.90 122.38 116.48
R-3 12.00 4.560 121.04 116.48 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56450 C 0.00 1.010 121.04 120.03 56450.00 2.05 122.38 120.33
L-1 3.73 1.530 121.04 119.51 6.00 2.25 122.38 120.13
L-2 6.10 3.560 121.04 117.48 10.00 4.90 122.38 117.48
L-3 11.00 3.560 121.04 117.48 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.97 1.200 121.04 119.84 6.00 2.27 122.38 120.11
R-2 6.10 3.560 121.04 117.48 10.00 4.90 122.38 117.48
R-3 12.00 3.560 121.04 117.48 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56500 C 0.00 1.300 121.04 119.74 56500.00 2.34 122.38 120.04
L-1 3.75 1.570 121.04 119.47 6.00 2.54 122.38 119.84
L-2 5.56 2.300 121.04 118.74 7.70 3.64 122.38 118.74
L-3 8.50 2.300 121.04 118.74 0.00 122.38 122.38
R-1 4.00 1.480 121.04 119.56 6.00 2.56 122.38 119.82
R-2 5.80 3.480 121.04 117.56 9.40 4.82 122.38 117.56
R-3 10.00 3.480 121.04 117.56 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56550 C 0.00 1.960 121.04 119.08 56550.00 3.00 122.38 119.38
L-1 4.00 2.080 121.04 118.96 6.00 3.20 122.38 119.18
L-2 6.00 3.700 121.04 117.34 8.80 5.04 122.38 117.34
L-3 11.00 3.700 121.04 117.34 0.00 122.38 122.38
R-1 3.84 2.360 121.04 118.68 6.00 3.22 122.38 119.16
R-2 6.64 3.560 121.04 117.48 8.60 4.90 122.38 117.48
R-3 9.00 3.560 121.04 117.48 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56600 C 0.00 0.510 121.04 120.53 56600.00 1.55 122.38 120.83
L-1 4.00 0.550 121.04 120.49 6.00 1.75 122.38 120.63
L-2 6.00 2.560 121.04 118.48 9.30 3.90 122.38 118.48
L-3 11.00 2.560 121.04 118.48 0.00 122.38 122.38
R-1 3.78 1.020 121.04 120.02 6.00 1.77 122.38 120.61
R-2 6.58 2.540 121.04 118.50 9.20 3.88 122.38 118.50
R-3 10.00 2.450 121.04 118.59 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
56650 C 0.00 1.010 121.04 120.03 56650.00 2.05 122.38 120.33
L-1 3.95 1.300 121.04 119.74 6.00 2.25 122.38 120.13
L-2 6.50 2.450 121.04 118.59 8.40 3.79 122.38 118.59
L-3 9.50 2.450 121.04 118.59 0.00 122.38 122.38
R-1 3.90 1.470 121.04 119.57 6.00 2.27 122.38 120.11
R-2 6.66 2.350 121.04 118.69 8.20 3.69 122.38 118.69
R-3 8.50 2.350 121.04 118.69 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56700 C 0.00 1.290 121.04 119.75 56700.00 2.33 122.38 120.05
L-1 4.00 1.730 121.04 119.31 6.00 2.53 122.38 119.85
L-2 5.95 4.560 121.04 116.48 11.10 5.90 122.38 116.48
L-3 12.00 4.560 121.04 116.48 0.00 122.38 122.38
R-1 3.95 1.800 121.04 119.24 6.00 2.55 122.38 119.83
R-2 6.32 4.200 121.04 116.84 10.50 5.54 122.38 116.84
R-3 12.00 4.200 121.04 116.84 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56750 C 0.00 1.000 121.04 120.04 56750.00 2.04 122.38 120.34
L-1 3.79 1.450 121.04 119.59 6.00 2.24 122.38 120.14
L-2 6.50 4.000 121.04 117.04 10.70 5.34 122.38 117.04
L-3 11.00 4.000 121.04 117.04 0.00 122.38 122.38
R-1 3.85 1.650 121.04 119.39 6.00 2.26 122.38 120.12
R-2 6.00 4.600 121.04 116.44 11.60 5.94 122.38 116.44
R-3 12.00 4.600 121.04 116.44 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56800 C 0.00 1.000 121.04 120.04 56800.00 2.04 122.38 120.34
L-1 3.95 1.350 121.04 119.69 6.00 2.24 122.38 120.14
L-2 6.50 4.560 121.04 116.48 11.50 5.90 122.38 116.48
L-3 12.00 4.560 121.04 116.48 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.98 1.560 121.04 119.48 6.00 2.26 122.38 120.12
R-2 6.45 4.560 121.04 116.48 11.50 5.90 122.38 116.48
R-3 12.00 4.560 121.04 116.48 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56850 C 0.00 1.070 121.04 119.97 56850.00 2.11 122.38 120.27
L-1 4.00 1.300 121.04 119.74 6.00 2.31 122.38 120.07
L-2 5.95 3.560 121.04 117.48 9.90 4.90 122.38 117.48
L-3 12.00 3.560 121.04 117.48 0.00 122.38 122.38
R-1 3.95 0.730 121.04 120.31 6.00 2.33 122.38 120.05
R-2 6.12 3.450 121.04 117.59 9.70 4.79 122.38 117.59
R-3 12.00 3.450 121.04 117.59 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56900 C 0.00 2.210 121.04 118.83 56900.00 3.25 122.38 119.13
L-1 3.98 2.820 121.04 118.22 6.00 3.45 122.38 118.93
L-2 5.95 4.350 121.04 116.69 9.40 5.69 122.38 116.69
L-3 9.45 4.350 121.04 116.69 0.00 122.38 122.38
R-1 3.95 2.230 121.04 118.81 6.00 3.47 122.38 118.91
R-2 6.22 3.560 121.04 117.48 8.20 4.90 122.38 117.48
R-3 8.45 3.560 121.04 117.48 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
56950 C 0.00 1.550 121.04 119.49 56950.00 2.59 122.38 119.79
L-1 4.00 1.900 121.04 119.14 6.00 2.79 122.38 119.59
L-2 5.95 3.890 121.04 117.15 9.70 5.23 122.38 117.15
L-3 12.00 3.890 121.04 117.15 0.00 122.38 122.38
R-1 3.95 1.800 121.04 119.24 6.00 2.81 122.38 119.57
R-2 6.12 3.450 121.04 117.59 9.00 4.79 122.38 117.59
R-3 12.00 3.450 121.04 117.59 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
57000 C 0.00 1.330 121.04 119.71 57000.00 2.37 122.38 120.01
L-1 3.97 1.600 121.04 119.44 6.00 2.57 122.38 119.81
L-2 5.95 3.560 121.04 117.48 9.50 4.90 122.38 117.48
L-3 11.00 3.560 121.04 117.48 0.00 122.38 122.38
R-1 3.95 1.620 121.04 119.42 6.00 2.59 122.38 119.79
R-2 6.12 3.720 121.04 117.32 9.80 5.06 122.38 117.32
R-3 11.00 3.720 121.04 117.32 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 1.90 1.9 122.38 120.48
57050 C 0.00 0.870 121.04 120.17 57050.00 1.91 122.38 120.47
L-1 4.00 1.000 121.04 120.04 6.00 2.11 122.38 120.27
L-2 5.95 2.000 121.04 119.04 7.90 3.34 122.38 119.04
L-3 9.45 2.000 121.04 119.04 0.00 122.38 122.38
R-1 3.95 0.980 121.04 120.06 6.00 2.13 122.38 120.25
R-2 6.12 2.150 121.04 118.89 8.10 3.49 122.38 118.89
R-3 8.45 2.150 121.04 118.89 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57100 C 0.00 1.620 121.04 119.42 57100.00 2.66 122.38 119.72
L-1 4.00 1.800 121.04 119.24 6.00 2.86 122.38 119.52
L-2 6.50 3.000 121.04 118.04 8.30 4.34 122.38 118.04
L-3 9.60 3.000 121.04 118.04 0.00 122.38 122.38
R-1 3.98 1.850 121.04 119.19 6.00 2.88 122.38 119.50
R-2 6.15 2.800 121.04 118.24 7.90 4.14 122.38 118.24
R-3 11.00 2.800 121.04 118.24 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57150 C 0.00 1.950 121.04 119.09 57150.00 2.99 122.38 119.39
L-1 4.00 2.100 121.04 118.94 6.00 3.19 122.38 119.19
L-2 6.00 3.400 121.04 117.64 8.40 4.74 122.38 117.64
L-3 9.60 3.400 121.04 117.64 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.89 2.220 121.04 118.82 6.00 3.21 122.38 119.17
R-2 6.00 3.050 121.04 117.99 7.80 4.39 122.38 117.99
R-3 10.00 3.050 121.04 117.99 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57200 C 0.00 1.040 121.04 120.00 57200.00 2.08 122.38 120.30
L-1 3.78 1.260 121.04 119.78 6.00 2.28 122.38 120.10
L-2 7.10 3.000 121.04 118.04 9.10 4.34 122.38 118.04
L-3 11.00 3.000 121.04 118.04 0.00 122.38 122.38
R-1 3.96 1.200 121.04 119.84 6.00 2.30 122.38 120.08
R-2 6.63 2.200 121.04 118.84 7.90 3.54 122.38 118.84
R-3 8.00 2.200 121.04 118.84 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57250 C 0.00 0.940 121.04 120.10 57250.00 1.98 122.38 120.40
L-1 3.76 1.220 121.04 119.82 6.00 2.18 122.38 120.20
L-2 5.10 2.000 121.04 119.04 7.80 3.34 122.38 119.04
L-3 8.50 2.000 121.04 119.04 0.00 122.38 122.38
R-1 4.00 1.240 121.04 119.80 6.00 2.20 122.38 120.18
R-2 5.65 2.600 121.04 118.44 8.70 3.94 122.38 118.44
R-3 11.00 2.600 121.04 118.44 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57300 C 0.00 1.400 121.04 119.64 57300.00 2.44 122.38 119.94
L-1 4.00 1.300 121.04 119.74 6.00 2.64 122.38 119.74
L-2 6.00 2.000 121.04 119.04 7.10 3.34 122.38 119.04
L-3 11.00 2.000 121.04 119.04 0.00 122.38 122.38
R-1 3.78 1.400 121.04 119.64 6.00 2.66 122.38 119.72
R-2 6.68 2.000 121.04 119.04 7.10 3.34 122.38 119.04
R-3 9.00 2.000 121.04 119.04 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
57350 C 0.00 1.530 121.04 119.51 57350.00 2.57 122.38 119.81
L-1 3.90 1.800 121.04 119.24 6.00 2.77 122.38 119.61
L-2 6.05 2.300 121.04 118.74 7.40 3.64 122.38 118.74
L-3 7.50 2.300 121.04 118.74 0.00 122.38 122.38
R-1 3.98 1.750 121.04 119.29 6.00 2.79 122.38 119.59
R-2 6.15 2.370 121.04 118.67 7.40 3.71 122.38 118.67
R-3 7.90 2.370 121.04 118.67 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57400 C 0.00 0.780 121.04 120.26 57400.00 1.82 122.38 120.56
L-1 4.00 0.900 121.04 120.14 6.00 2.02 122.38 120.36
L-2 6.10 1.600 121.04 119.44 7.40 2.94 122.38 119.44
L-3 7.50 1.600 121.04 119.44 0.00 122.38 122.38
R-1 3.94 0.900 121.04 120.14 6.00 2.04 122.38 120.34
R-2 6.12 2.000 121.04 119.04 8.00 3.34 122.38 119.04
R-3 10.00 2.000 121.04 119.04 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57450 C 0.00 1.580 121.04 119.46 57450.00 2.62 122.38 119.76
L-1 3.92 1.920 121.04 119.12 6.00 2.82 122.38 119.56
L-2 6.00 2.460 121.04 118.58 7.50 3.80 122.38 118.58
L-3 7.80 2.460 121.04 118.58 0.00 122.38 122.38
R-1 3.96 1.830 121.04 119.21 6.00 2.84 122.38 119.54
R-2 6.42 2.200 121.04 118.84 7.10 3.54 122.38 118.84
R-3 8.00 2.200 121.04 118.84 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57500 C 0.00 2.670 121.04 118.37 57500.00 3.71 122.38 118.67
L-1 3.79 2.900 121.04 118.14 6.00 3.91 122.38 118.47
L-2 5.10 3.300 121.04 117.74 7.10 4.64 122.38 117.74
L-3 8.50 3.300 121.04 117.74 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 4.00 2.800 121.04 118.24 6.00 3.93 122.38 118.45
R-2 5.75 4.000 121.04 117.04 8.20 5.34 122.38 117.04
R-3 8.50 4.000 121.04 117.04 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57550 C 0.00 1.240 121.04 119.80 57550.00 2.28 122.38 120.10
L-1 4.00 1.700 121.04 119.34 6.00 2.48 122.38 119.90
L-2 6.00 2.350 121.04 118.69 7.90 3.69 122.38 118.69
L-3 11.00 2.350 121.04 118.69 0.00 122.38 122.38
R-1 3.90 1.750 121.04 119.29 6.00 2.50 122.38 119.88
R-2 6.00 2.410 121.04 118.63 7.90 3.75 122.38 118.63
R-3 9.00 2.410 121.04 118.63 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57600 C 0.00 2.270 121.04 118.77 57600.00 3.31 122.38 119.07
L-1 4.00 2.500 121.04 118.54 6.00 3.51 122.38 118.87
L-2 6.05 3.100 121.04 117.94 7.40 4.44 122.38 117.94
L-3 7.50 3.100 121.04 117.94 0.00 122.38 122.38
R-1 4.15 2.450 121.04 118.59 6.00 3.53 122.38 118.85
R-2 6.15 3.010 121.04 118.03 7.30 4.35 122.38 118.03
R-3 7.90 3.010 121.04 118.03 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57650 C 0.00 0.800 121.04 120.24 57650.00 1.84 122.38 120.54
L-1 4.30 1.000 121.04 120.04 6.00 2.04 122.38 120.34
L-2 6.00 2.000 121.04 119.04 8.00 3.34 122.38 119.04
L-3 9.68 2.000 121.04 119.04 0.00 122.38 122.38
R-1 4.00 1.000 121.04 120.04 6.00 2.06 122.38 120.32
R-2 6.00 2.100 121.04 118.94 8.10 3.44 122.38 118.94
R-3 10.00 2.100 121.04 118.94 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
57700 C 0.00 1.200 121.04 119.84 57700.00 2.24 122.38 120.14
L-1 4.00 1.300 121.04 119.74 6.00 2.44 122.38 119.94
L-2 6.00 2.300 121.04 118.74 7.80 3.64 122.38 118.74
L-3 9.00 2.300 121.04 118.74 0.00 122.38 122.38
R-1 4.00 1.400 121.04 119.64 6.00 2.46 122.38 119.92
R-2 6.05 2.000 121.04 119.04 7.40 3.34 122.38 119.04
R-3 8.00 2.000 121.04 119.04 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57750 C 0.00 1.980 121.04 119.06 57750.00 3.02 122.38 119.36
L-1 3.50 2.300 121.04 118.74 6.00 3.22 122.38 119.16
L-2 5.10 2.700 121.04 118.34 7.30 4.04 122.38 118.34
L-3 8.50 2.700 121.04 118.34 0.00 122.38 122.38
R-1 4.20 2.370 121.04 118.67 6.00 3.24 122.38 119.14
R-2 5.60 3.000 121.04 118.04 7.70 4.34 122.38 118.04
R-3 8.50 3.000 121.04 118.04 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57800 C 0.00 3.010 121.04 118.03 57800.00 4.05 122.38 118.33
L-1 4.00 3.400 121.04 117.64 6.00 4.25 122.38 118.13
L-2 6.00 3.890 121.04 117.15 7.50 5.23 122.38 117.15
L-3 11.00 3.890 121.04 117.15 0.00 122.38 122.38
R-1 3.50 3.300 121.04 117.74 6.00 4.27 122.38 118.11
R-2 6.00 4.700 121.04 116.34 8.70 6.04 122.38 116.34
R-3 9.00 4.700 121.04 116.34 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57850 C 0.00 1.390 121.04 119.65 57850.00 2.43 122.38 119.95
L-1 4.00 1.800 121.04 119.24 6.00 2.63 122.38 119.75
L-2 6.00 2.500 121.04 118.54 7.90 3.84 122.38 118.54
L-3 8.00 2.500 121.04 118.54 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 4.00 1.900 121.04 119.14 6.00 2.65 122.38 119.73
R-2 6.00 2.400 121.04 118.64 7.70 3.74 122.38 118.64
R-3 10.00 2.400 121.04 118.64 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57900 C 0.00 1.460 121.04 119.58 57900.00 2.50 122.38 119.88
L-1 3.95 1.650 121.04 119.39 6.00 2.70 122.38 119.68
L-2 6.50 3.000 121.04 118.04 8.50 4.34 122.38 118.04
L-3 9.86 3.000 121.04 118.04 0.00 122.38 122.38
R-1 4.00 1.700 121.04 119.34 6.00 2.72 122.38 119.66
R-2 6.10 2.220 121.04 118.82 7.30 3.56 122.38 118.82
R-3 9.00 2.220 121.04 118.82 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
57950 C 0.00 1.760 121.04 119.28 57950.00 2.80 122.38 119.58
L-1 4.00 1.900 121.04 119.14 6.00 3.00 122.38 119.38
L-2 6.00 2.500 121.04 118.54 7.30 3.84 122.38 118.54
L-3 7.56 2.500 121.04 118.54 0.00 122.38 122.38
R-1 4.00 1.850 121.04 119.19 6.00 3.02 122.38 119.36
R-2 6.10 2.800 121.04 118.24 7.70 4.14 122.38 118.24
R-3 8.50 2.800 121.04 118.24 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58000 C 0.00 1.450 121.04 119.59 58000.00 2.49 122.38 119.89
L-1 4.00 1.650 121.04 119.39 6.00 2.69 122.38 119.69
L-2 6.00 2.800 121.04 118.24 8.20 4.14 122.38 118.24
L-3 9.86 2.800 121.04 118.24 0.00 122.38 122.38
R-1 4.00 1.600 121.04 119.44 6.00 2.71 122.38 119.67
R-2 6.50 2.630 121.04 118.41 7.90 3.97 122.38 118.41
R-3 8.52 2.630 121.04 118.41 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
58050 C 0.00 1.750 121.04 119.29 58050.00 2.79 122.38 119.59
L-1 4.00 1.900 121.04 119.14 6.00 2.99 122.38 119.39
L-2 6.00 3.400 121.04 117.64 8.70 4.74 122.38 117.64
L-3 9.68 3.400 121.04 117.64 0.00 122.38 122.38
R-1 4.00 1.860 121.04 119.18 6.00 3.01 122.38 119.37
R-2 6.00 2.720 121.04 118.32 7.60 4.06 122.38 118.32
R-3 12.00 2.720 121.04 118.32 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58100 C 0.00 2.500 121.04 118.54 58100.00 3.54 122.38 118.84
L-1 4.00 2.700 121.04 118.34 6.00 3.74 122.38 118.64
L-2 6.12 3.500 121.04 117.54 7.70 4.84 122.38 117.54
L-3 7.85 3.500 121.04 117.54 0.00 122.38 122.38
R-1 4.00 2.400 121.04 118.64 6.00 3.76 122.38 118.62
R-2 6.00 3.120 121.04 117.92 7.10 4.46 122.38 117.92
R-3 7.52 3.120 121.04 117.92 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58150 C 0.00 2.750 121.04 118.29 58150.00 3.79 122.38 118.59
L-1 4.00 2.900 121.04 118.14 6.00 3.99 122.38 118.39
L-2 6.10 3.650 121.04 117.39 7.50 4.99 122.38 117.39
L-3 7.56 3.650 121.04 117.39 0.00 122.38 122.38
R-1 4.00 2.760 121.04 118.28 6.00 4.01 122.38 118.37
R-2 6.10 3.560 121.04 117.48 7.40 4.90 122.38 117.48
R-3 7.56 3.560 121.04 117.48 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58200 C 0.00 1.710 121.04 119.33 58200.00 2.75 122.38 119.63
L-1 4.00 1.900 121.04 119.14 6.00 2.95 122.38 119.43
L-2 6.10 2.890 121.04 118.15 8.00 4.23 122.38 118.15
L-3 9.00 2.890 121.04 118.15 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 4.00 1.900 121.04 119.14 6.00 2.97 122.38 119.41
R-2 6.10 2.750 121.04 118.29 7.70 4.09 122.38 118.29
R-3 10.00 2.750 121.04 118.29 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58250 C 0.00 0.870 121.04 120.17 58250.00 1.91 122.38 120.47
L-1 4.00 1.000 121.04 120.04 6.00 2.11 122.38 120.27
L-2 6.10 2.450 121.04 118.59 8.60 3.79 122.38 118.59
L-3 9.00 2.450 121.04 118.59 0.00 122.38 122.38
R-1 4.00 1.200 121.04 119.84 6.00 2.13 122.38 120.25
R-2 6.10 2.230 121.04 118.81 8.20 3.57 122.38 118.81
R-3 10.00 2.230 121.04 118.81 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58300 C 0.00 0.100 121.04 120.94 58300.00 1.14 122.38 121.24
L-1 4.00 1.400 121.04 119.64 6.00 1.34 122.38 121.04
L-2 6.10 2.780 121.04 118.26 10.20 4.12 122.38 118.26
L-3 11.00 2.780 121.04 118.26 0.00 122.38 122.38
R-1 4.00 1.300 121.04 119.74 6.00 1.36 122.38 121.02
R-2 6.10 1.980 121.04 119.06 9.00 3.32 122.38 119.06
R-3 11.00 1.980 121.04 119.06 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58350 C 0.00 1.300 121.04 119.74 58350.00 2.34 122.38 120.04
L-1 4.00 1.500 121.04 119.54 6.00 2.54 122.38 119.84
L-2 6.10 2.600 121.04 118.44 8.10 3.94 122.38 118.44
L-3 11.00 2.600 121.04 118.44 0.00 122.38 122.38
R-1 4.00 1.600 121.04 119.44 6.00 2.56 122.38 119.82
R-2 6.10 2.450 121.04 118.59 7.90 3.79 122.38 118.59
R-3 12.00 2.450 121.04 118.59 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
58400 C 0.00 1.160 121.04 119.88 58400.00 2.20 122.38 120.18
L-1 4.00 1.560 121.04 119.48 6.00 2.40 122.38 119.98
L-2 6.10 3.450 121.04 117.59 9.60 4.79 122.38 117.59
L-3 11.00 3.450 121.04 117.59 0.00 122.38 122.38
R-1 4.00 1.250 121.04 119.79 6.00 2.42 122.38 119.96
R-2 6.10 3.120 121.04 117.92 9.10 4.46 122.38 117.92
R-3 12.00 3.120 121.04 117.92 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58450 C 0.00 1.540 121.04 119.50 58450.00 2.58 122.38 119.80
L-1 4.00 1.740 121.04 119.30 6.00 2.78 122.38 119.60
L-2 6.05 3.110 121.04 117.93 8.60 4.45 122.38 117.93
L-3 11.00 3.110 121.04 117.93 0.00 122.38 122.38
R-1 3.98 2.230 121.04 118.81 6.00 2.80 122.38 119.58
R-2 6.15 3.120 121.04 117.92 8.50 4.46 122.38 117.92
R-3 11.00 3.120 121.04 117.92 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58500 C 0.00 1.460 121.04 119.58 58500.00 2.50 122.38 119.88
L-1 4.30 1.600 121.04 119.44 6.00 2.70 122.38 119.68
L-2 6.00 3.120 121.04 117.92 8.70 4.46 122.38 117.92
L-3 7.50 3.120 121.04 117.92 0.00 122.38 122.38
R-1 4.00 1.760 121.04 119.28 6.00 2.72 122.38 119.66
R-2 6.00 2.890 121.04 118.15 8.30 4.23 122.38 118.15
R-3 10.00 2.890 121.04 118.15 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58550 C 0.00 1.390 121.04 119.65 58550.00 2.43 122.38 119.95
L-1 4.00 1.500 121.04 119.54 6.00 2.63 122.38 119.75
L-2 6.00 2.700 121.04 118.34 8.20 4.04 122.38 118.34
L-3 9.00 2.700 121.04 118.34 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 4.00 1.560 121.04 119.48 6.00 2.65 122.38 119.73
R-2 6.05 2.780 121.04 118.26 8.30 4.12 122.38 118.26
R-3 11.00 2.780 121.04 118.26 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 3.50 3.5 122.38 118.88
58600 C 0.00 0.780 121.04 120.26 58600.00 1.82 122.38 120.56
L-1 3.50 1.000 121.04 120.04 6.00 2.02 122.38 120.36
L-2 5.10 2.560 121.04 118.48 8.90 3.90 122.38 118.48
L-3 10.00 2.560 121.04 118.48 0.00 122.38 122.38
R-1 4.20 1.000 121.04 120.04 6.00 2.04 122.38 120.34
R-2 5.60 2.460 121.04 118.58 8.70 3.80 122.38 118.58
R-3 10.00 2.460 121.04 118.58 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58650 C 0.00 0.380 121.04 120.66 58650.00 1.42 122.38 120.96
L-1 4.00 0.560 121.04 120.48 6.00 1.62 122.38 120.76
L-2 6.00 2.000 121.04 119.04 8.60 3.34 122.38 119.04
L-3 11.00 2.000 121.04 119.04 0.00 122.38 122.38
R-1 3.50 0.750 121.04 120.29 6.00 1.64 122.38 120.74
R-2 6.00 1.890 121.04 119.15 8.40 3.23 122.38 119.15
R-3 9.00 1.890 121.04 119.15 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58700 C 0.00 1.160 121.04 119.88 58700.00 2.20 122.38 120.18
L-1 4.00 1.410 121.04 119.63 6.00 2.40 122.38 119.98
L-2 6.05 2.890 121.04 118.15 8.80 4.23 122.38 118.15
L-3 9.80 2.890 121.04 118.15 0.00 122.38 122.38
R-1 3.98 1.400 121.04 119.64 6.00 2.42 122.38 119.96
R-2 6.15 2.560 121.04 118.48 8.30 3.90 122.38 118.48
R-3 11.00 2.560 121.04 118.48 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
58750 C 0.00 1.460 121.04 119.58 58750.00 2.50 122.38 119.88
L-1 4.30 1.820 121.04 119.22 6.00 2.70 122.38 119.68
L-2 6.00 2.450 121.04 118.59 7.70 3.79 122.38 118.59
L-3 9.00 2.450 121.04 118.59 0.00 122.38 122.38
R-1 4.00 1.520 121.04 119.52 6.00 2.72 122.38 119.66
R-2 6.00 2.980 121.04 118.06 8.50 4.32 122.38 118.06
R-3 9.00 2.980 121.04 118.06 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58800 C 0.00 1.110 121.04 119.93 58800.00 2.15 122.38 120.23
L-1 4.00 1.470 121.04 119.57 6.00 2.35 122.38 120.03
L-2 6.00 2.560 121.04 118.48 8.40 3.90 122.38 118.48
L-3 9.00 2.560 121.04 118.48 0.00 122.38 122.38
R-1 4.00 1.200 121.04 119.84 6.00 2.37 122.38 120.01
R-2 6.05 2.650 121.04 118.39 8.50 3.99 122.38 118.39
R-3 10.00 2.650 121.04 118.39 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58850 C 0.00 1.080 121.04 119.96 58850.00 2.12 122.38 120.26
L-1 3.50 1.360 121.04 119.68 6.00 2.32 122.38 120.06
L-2 5.10 2.890 121.04 118.15 8.90 4.23 122.38 118.15
L-3 9.00 2.890 121.04 118.15 0.00 122.38 122.38
R-1 4.20 1.180 121.04 119.86 6.00 2.34 122.38 120.04
R-2 5.60 2.560 121.04 118.48 8.40 3.90 122.38 118.48
R-3 10.00 2.560 121.04 118.48 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58900 C 0.00 1.230 121.04 119.81 58900.00 2.27 122.38 120.11
L-1 4.00 1.580 121.04 119.46 6.00 2.47 122.38 119.91
L-2 6.00 2.130 121.04 118.91 7.50 3.47 122.38 118.91
L-3 11.00 2.130 121.04 118.91 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.50 1.330 121.04 119.71 6.00 2.49 122.38 119.89
R-2 6.00 2.310 121.04 118.73 7.80 3.65 122.38 118.73
R-3 9.00 2.310 121.04 118.73 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
58950 C 0.00 1.380 121.04 119.66 58950.00 2.42 122.38 119.96
L-1 4.00 1.550 121.04 119.49 6.00 2.62 122.38 119.76
L-2 6.05 2.560 121.04 118.48 8.00 3.90 122.38 118.48
L-3 10.00 2.560 121.04 118.48 0.00 122.38 122.38
R-1 3.98 1.530 121.04 119.51 6.00 2.64 122.38 119.74
R-2 6.15 2.120 121.04 118.92 7.30 3.46 122.38 118.92
R-3 7.90 2.120 121.04 118.92 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
59000 C 0.00 1.370 121.04 119.67 59000.00 2.41 122.38 119.97
L-1 4.30 1.440 121.04 119.60 6.00 2.61 122.38 119.77
L-2 6.00 2.500 121.04 118.54 7.90 3.84 122.38 118.54
L-3 9.00 2.500 121.04 118.54 0.00 122.38 122.38
R-1 4.00 1.450 121.04 119.59 6.00 2.63 122.38 119.75
R-2 6.00 2.130 121.04 118.91 7.30 3.47 122.38 118.91
R-3 7.80 2.130 121.04 118.91 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
59050 C 0.00 1.420 121.04 119.62 59050.00 2.46 122.38 119.92
L-1 4.00 1.560 121.04 119.48 6.00 2.66 122.38 119.72
L-2 6.00 2.890 121.04 118.15 8.40 4.23 122.38 118.15
L-3 9.80 2.890 121.04 118.15 0.00 122.38 122.38
R-1 4.00 1.490 121.04 119.55 6.00 2.68 122.38 119.70
R-2 6.05 2.890 121.04 118.15 8.40 4.23 122.38 118.15
R-3 10.00 2.890 121.04 118.15 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
59100 C 0.00 1.400 121.04 119.64 59100.00 2.44 122.38 119.94
L-1 3.50 1.600 121.04 119.44 6.00 2.64 122.38 119.74
L-2 5.10 2.450 121.04 118.59 7.80 3.79 122.38 118.59
L-3 8.50 2.450 121.04 118.59 0.00 122.38 122.38
R-1 4.20 1.440 121.04 119.60 6.00 2.66 122.38 119.72
R-2 5.60 2.360 121.04 118.68 7.60 3.70 122.38 118.68
R-3 8.50 2.360 121.04 118.68 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
59150 C 0.00 1.140 121.04 119.90 59150.00 2.18 122.38 120.20
L-1 4.00 1.340 121.04 119.70 6.00 2.38 122.38 120.00
L-2 6.00 2.650 121.04 118.39 8.50 3.99 122.38 118.39
L-3 11.00 2.650 121.04 118.39 0.00 122.38 122.38
R-1 3.50 1.230 121.04 119.81 6.00 2.40 122.38 119.98
R-2 6.00 2.510 121.04 118.53 8.20 3.85 122.38 118.53
R-3 9.00 2.510 121.04 118.53 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
59200 C 0.00 1.210 121.04 119.83 59200.00 2.25 122.38 120.13
L-1 4.00 1.330 121.04 119.71 6.00 2.45 122.38 119.93
L-2 6.05 2.450 121.04 118.59 8.10 3.79 122.38 118.59
L-3 10.00 2.450 121.04 118.59 0.00 122.38 122.38
R-1 3.98 1.300 121.04 119.74 6.00 2.47 122.38 119.91
R-2 6.15 2.300 121.04 118.74 7.80 3.64 122.38 118.74
R-3 10.00 2.300 121.04 118.74 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
59250 C 0.00 1.390 121.04 119.65 59250.00 2.43 122.38 119.95
L-1 4.30 1.530 121.04 119.51 6.00 2.63 122.38 119.75
L-2 6.00 2.830 121.04 118.21 8.40 4.17 122.38 118.21
L-3 10.00 2.830 121.04 118.21 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 4.00 1.450 121.04 119.59 6.00 2.65 122.38 119.73
R-2 6.00 2.350 121.04 118.69 7.60 3.69 122.38 118.69
R-3 7.80 2.350 121.04 118.69 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
59300 C 0.00 1.450 121.04 119.59 59300.00 2.49 122.38 119.89
L-1 4.00 1.600 121.04 119.44 6.00 2.69 122.38 119.69
L-2 6.00 2.410 121.04 118.63 7.60 3.75 122.38 118.63
L-3 7.80 2.410 121.04 118.63 0.00 122.38 122.38
R-1 4.00 1.460 121.04 119.58 6.00 2.71 122.38 119.67
R-2 6.05 2.450 121.04 118.59 7.70 3.79 122.38 118.59
R-3 8.00 2.450 121.04 118.59 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
59350 C 0.00 1.050 121.04 119.99 59350.00 2.09 122.38 120.29
L-1 3.50 1.490 121.04 119.55 6.00 2.29 122.38 120.09
L-2 5.10 2.350 121.04 118.69 8.10 3.69 122.38 118.69
L-3 8.50 2.350 121.04 118.69 0.00 122.38 122.38
R-1 4.20 1.050 121.04 119.99 6.00 2.31 122.38 120.07
R-2 5.60 2.450 121.04 118.59 8.30 3.79 122.38 118.59
R-3 8.50 2.450 121.04 118.59 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
59400 C 0.00 1.130 121.04 119.91 59400.00 2.17 122.38 120.21
L-1 4.00 1.280 121.04 119.76 6.00 2.37 122.38 120.01
L-2 6.00 2.150 121.04 118.89 7.70 3.49 122.38 118.89
L-3 11.00 2.150 121.04 118.89 0.00 122.38 122.38
R-1 3.50 1.020 121.04 120.02 6.00 2.39 122.38 119.99
R-2 6.00 2.450 121.04 118.59 8.20 3.79 122.38 118.59
R-3 9.00 2.450 121.04 118.59 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
59450 C 0.00 1.650 121.04 119.39 59450.00 2.69 122.38 119.69
L-1 4.00 1.860 121.04 119.18 6.00 2.89 122.38 119.49
L-2 6.00 2.700 121.04 118.34 7.80 4.04 122.38 118.34
L-3 11.00 2.700 121.04 118.34 0.00 122.38 122.38
R-1 3.50 1.660 121.04 119.38 6.00 2.91 122.38 119.47
R-2 6.00 2.340 121.04 118.70 7.20 3.68 122.38 118.70
R-3 9.00 2.340 121.04 118.70 0.00 122.38 122.38
CP 0.00 121.04 121.04 0.00 122.38 122.38
59500 C 0.00 0.230 121.04 120.81 59500.00 1.27 122.38 121.11
L-1 4.00 0.370 121.04 120.67 6.00 1.47 122.38 120.91
L-2 6.00 1.560 121.04 119.48 8.20 2.90 122.38 119.48
L-3 11.00 1.560 121.04 119.48 0.00 122.38 122.38
R-1 3.50 0.240 121.04 120.80 6.00 1.49 122.38 120.89
R-2 6.00 1.230 121.04 119.81 7.70 2.57 122.38 119.81
R-3 9.00 1.230 121.04 119.81 0.00 122.38 122.38
CP 0.00 0.5 5.9 115.64 115.14 0.00 0.20 5.8 116.78 116.58
59550 C 0.00 1.090 115.64 114.55 59550.00 1.93 116.78 114.85
L-1 4.00 1.270 115.64 114.37 6.00 2.13 116.78 114.65
L-2 6.00 2.230 115.64 113.41 7.90 3.37 116.78 113.41
L-3 11.00 2.230 115.64 113.41 0.00 116.78 116.78
R-1 3.50 1.100 115.64 114.54 6.00 2.15 116.78 114.63
R-2 6.00 2.300 115.64 113.34 8.00 3.44 116.78 113.34
R-3 9.00 2.300 115.64 113.34 0.00 116.78 116.78
CP 0.00 115.64 115.64 0.00 116.78 116.78
59600 C 0.00 1.690 115.64 113.95 59600.00 2.53 116.78 114.25
L-1 4.00 2.030 115.64 113.61 6.00 2.73 116.78 114.05
L-2 6.00 3.000 115.64 112.64 8.20 4.14 116.78 112.64
L-3 11.00 3.000 115.64 112.64 0.00 116.78 116.78
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 3.50 1.770 115.64 113.87 6.00 2.75 116.78 114.03
R-2 6.00 3.000 115.64 112.64 8.10 4.14 116.78 112.64
R-3 9.00 3.000 115.64 112.64 0.00 116.78 116.78
CP 0.00 115.64 115.64 0.00 116.78 116.78
59650 C 0.00 0.100 115.64 115.54 59650.00 0.94 116.78 115.84
L-1 4.00 0.310 115.64 115.33 6.00 1.14 116.78 115.64
L-2 6.00 1.520 115.64 114.12 8.30 2.66 116.78 114.12
L-3 11.00 1.520 115.64 114.12 0.00 116.78 116.78
R-1 3.50 0.250 115.64 115.39 6.00 1.16 116.78 115.62
R-2 6.00 1.540 115.64 114.10 8.30 2.68 116.78 114.10
R-3 9.00 1.540 115.64 114.10 0.00 116.78 116.78
CP 0.00 115.64 115.64 0.00 116.78 116.78
59700 C 0.00 0.720 115.64 114.92 59700.00 1.56 116.78 115.22
L-1 4.00 0.940 115.64 114.70 6.00 1.76 116.78 115.02
L-2 6.00 1.950 115.64 113.69 8.00 3.09 116.78 113.69
L-3 11.00 1.950 115.64 113.69 0.00 116.78 116.78
R-1 3.50 0.850 115.64 114.79 6.00 1.78 116.78 115.00
R-2 6.00 2.120 115.64 113.52 8.30 3.26 116.78 113.52
R-3 9.00 2.120 115.64 113.52 0.00 116.78 116.78
CP 0.00 115.64 115.64 0.00 116.78 116.78
59750 C 0.00 1.490 115.64 114.15 59750.00 2.33 116.78 114.45
L-1 4.00 1.640 115.64 114.00 6.00 2.53 116.78 114.25
L-2 6.00 2.460 115.64 113.18 7.70 3.60 116.78 113.18
L-3 11.00 2.460 115.64 113.18 0.00 116.78 116.78
R-1 3.50 1.600 115.64 114.04 6.00 2.55 116.78 114.23
R-2 6.00 2.850 115.64 112.79 8.20 3.99 116.78 112.79
R-3 9.00 2.850 115.64 112.79 0.00 116.78 116.78
CP 0.00 115.64 115.64 0.00 116.78 116.78
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
59800 C 0.00 2.350 115.64 113.29 59800.00 3.19 116.78 113.59
L-1 4.00 2.540 115.64 113.10 6.00 3.39 116.78 113.39
L-2 6.00 3.460 115.64 112.18 7.90 4.60 116.78 112.18
L-3 11.00 3.460 115.64 112.18 0.00 116.78 116.78
R-1 3.50 2.460 115.64 113.18 6.00 3.41 116.78 113.37
R-2 6.00 3.120 115.64 112.52 7.30 4.26 116.78 112.52
R-3 9.00 3.120 115.64 112.52 0.00 116.78 116.78
CP 0.00 115.64 115.64 0.00 116.78 116.78
59850 C 0.00 0.230 115.64 115.41 59850.00 1.07 116.78 115.71
L-1 4.00 0.370 115.64 115.27 6.00 1.27 116.78 115.51
L-2 6.00 1.560 115.64 114.08 8.20 2.70 116.78 114.08
L-3 11.00 1.560 115.64 114.08 0.00 116.78 116.78
R-1 3.50 0.240 115.64 115.40 6.00 1.29 116.78 115.49
R-2 6.00 2.150 115.64 113.49 9.00 3.29 116.78 113.49
R-3 10.00 2.150 115.64 113.49 0.00 116.78 116.78
CP 0.00 115.64 115.64 0.00 2.50 2.5 116.78 114.28
59900 C 0.00 1.090 115.64 114.55 59900.00 1.93 116.78 114.85
L-1 4.00 1.270 115.64 114.37 6.00 2.13 116.78 114.65
L-2 6.00 1.920 115.64 113.72 7.40 3.06 116.78 113.72
L-3 11.00 1.920 115.64 113.72 0.00 116.78 116.78
R-1 3.50 1.100 115.64 114.54 6.00 2.15 116.78 114.63
R-2 6.00 1.890 115.64 113.75 7.40 3.03 116.78 113.75
R-3 9.00 1.890 115.64 113.75 0.00 116.78 116.78
CP 0.00 115.64 115.64 0.00 116.78 116.78
59950 C 0.00 1.690 115.64 113.95 59950.00 2.53 116.78 114.25
L-1 3.95 1.800 115.64 113.84 6.00 2.73 116.78 114.05
L-2 6.50 2.750 115.64 112.89 7.80 3.89 116.78 112.89
L-3 9.50 2.750 115.64 112.89 0.00 116.78 116.78
WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000

Chainage Initial Level Final Level


Distance BS IS FS HI RL Distance BS IS FS HI RL
R-1 4.00 1.770 115.64 113.87 6.00 2.75 116.78 114.03
R-2 6.00 2.890 115.64 112.75 8.00 4.03 116.78 112.75
R-3 8.50 2.890 115.64 112.75 0.00 116.78 116.78
CP 0.00 115.64 115.64 0.00 0.50 1.5 115.78 115.28
60000 C 0.00 1.690 115.64 113.95 60000.00 1.53 115.78 114.25
L-1 4.05 1.900 115.64 113.74 6.00 1.73 115.78 114.05
L-2 5.95 2.520 115.64 113.12 7.40 2.66 115.78 113.12
L-3 9.45 2.520 115.64 113.12 0.00 115.78 115.78
R-1 3.95 1.770 115.64 113.87 6.00 1.75 115.78 114.03
R-2 6.12 2.630 115.64 113.01 7.60 2.77 115.78 113.01
R-3 8.45 2.630 115.64 113.01 0.00 2.77 113.01 113.01
CP 0.00 2.630 113.01 113.01 0.00 113.01 113.01

JUNIOR ENGINEER ASST.EXECUTIVE ENGINEER EXECUTIVE ENGINEER


R&B DIVISION R&B DIVISION R&B DIVISION
BOUDH BOUDH BOUDH
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

CHANAGE 48,817.000 M CHANAGE 48,850.000 M

115.00 114.00
R.L.

113.00

R.L.
114.00
113.00 112.00
112.00 111.00

111.00 110.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE
DISTANCE

CHANAGE 48,900.000 M CHANAGE 48,950.000 M

114.00 114.50
113.50 114.00
R.L.

R.L.
113.00 113.50
112.50 113.00
112.00 112.50
111.50 112.00
111.00 111.50
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 49,000.000 M CHANAGE 49,050.000 M

115.00 113.50
113.00
R.L.

114.00

R.L.
112.50
113.00 112.00
112.00 111.50
111.00
111.00 110.50
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 49,100.000 M CHANAGE 49,150.000 M


WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

114.00 114.50
114.00
R.L.

R.L.
113.00 113.50
113.00
112.00 112.50
112.00
111.00 111.50
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 49,200.000 M CHANAGE 49,250.000 M

101
114.50
101
114.00
R.L.

100.5
100.5 113.50 . 42
114.00 00

R.L.
R.L.
R.L.
1 .8
113.00

R.L.
100
100
113.50 999.8
112.50
99.5 9 .4
99.5
99 .2
112.00
9
9999
113.00 999
111.50
0
00.00 2 2 4.004
2.00 4
6.00 6 8.00 66 10.00
8 8810
12.00 10
14.0012
1016.00 12
18.00
12 111.00 ..66
9988 0.000
0 22
2.00 4.00 44 6.00 668.00 88
10.00 10
10
10
12.00 12
12 16.00 14
12
14.00 14
1418.00
DISTANCE
DISTANCE DISTANCE
DIST
DISTANCE
ANCE
DISTANCE

CHANAGE 49,300.000 M CHANAGE 49,350.000 M

113.50 114.50
113.00
R.L.

112.50 114.00

R.L.
112.00 113.50
111.50
111.00 113.00
110.50 112.50
110.00
112.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 49,400.000 M CHANAGE 49,450.000 M

114.50 114.00
114.00 113.50
R.L.

113.00
R.L.

113.50
112.50
113.00
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

114.50 114.00
114.00 113.50
R.L.

113.00

R.L.
113.50
112.50
113.00
112.00
112.50
111.50
112.00 111.00
111.50 110.50
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 49,500.000 M CHANAGE 49,550.000 M

114.00 115.00
R.L.

113.50
114.00

R.L.
113.00
113.00
112.50
112.00
112.00
111.00
111.50
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 110.00
DISTANCE 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE

CHANAGE 49,600.000 M CHANAGE 49,650.000 M

114.00 113.00
113.50 112.50
R.L.

R.L.
113.00 112.00
111.50
112.50
111.00
112.00
110.50
111.50
110.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 49,700.000 M CHANAGE 49,750.000 M

114.50 114.00
114.00
R.L.

113.50 113.00
R.L.

113.00 112.00
112.50
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

114.50 114.00
114.00
R.L.

113.50 113.00

R.L.
113.00 112.00
112.50
112.00 111.00
111.50 110.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 49,800.000 M CHANAGE 49,850.000 M

115.00 115.00
R.L.

114.00 114.00

R.L.
113.00 113.00
112.00
112.00
111.00
111.00
110.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE

CHANAGE 49,900.000 M CHANAGE 49,950.000 M

115.50 115.00
115.00 114.00
R.L.

114.50

R.L.
114.00 113.00
113.50 112.00
113.00
112.50 111.00
112.00 110.00
0.00 5.00 10.00 15.00 20.00 25.00 -5.00 0.00 5.00 10.00 15.00 20.00
DISTANCE DISTANCE

CHANAGE 50,000.000 M CHANAGE 50,050.000 M

115.50 117.00
115.00 116.50
R.L.

114.50 116.00
R.L.

114.00 115.50
113.50 115.00
113.00 114.50
112.50 114.00
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

115.50 117.00
115.00 116.50
R.L. 114.50 116.00

R.L.
114.00 115.50
113.50 115.00
113.00 114.50
112.50
114.00
112.00
113.50
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 50,100.000 M CHANAGE 50,150.000 M

117.00 118.00
R.L.

116.00 117.00

R.L.
116.00
115.00 115.00
114.00 114.00
113.00 113.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00DISTANCE 15.00 20.00 25.00
DISTANCE

CHANAGE 50,200.000 M CHANAGE 50,250.000 M

116.00 117.00
R.L.

115.00 116.00

R.L.
114.00 115.00
114.00
113.00
113.00
112.00
112.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 50,300.000 M CHANAGE 50,350.000 M

116.00
114.70
R.L.

114.60 115.00
R.L.

114.50
114.00
114.40
114.30 113.00
114.20 112.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
116.00
114.70
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

R.L.
114.60 115.00

R.L.
114.50
114.00
114.40
114.30 113.00
114.20 112.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 50,400.000 M CHANAGE 50,450.000 M

117.00
117.00
116.50
R.L.

116.00 116.00

R.L.
115.00 115.50
114.00 115.00
114.50
113.00
114.00
112.00 113.50
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 50,500.000 M CHANAGE 50,550.000 M

117.00 116.50
116.00
R.L.

116.00
115.50

R.L.
115.00 115.00
114.50
114.00 114.00
113.50
113.00
113.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 50,600.000 M CHANAGE 50,650.000 M

116.00 0
.0
R.L.

115.00 6
11
R.L.

0
114.00 5 .0
11
113.00 0
4 .0
112.00 11
0
0.00 5.00 10.00 15.00 20.00 25.00 3 .0
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE 11 DISTANCE
116.00 WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM
0 49/000 Km TO 60/000
.0

R.L.
115.00 6
11

R.L.
0
114.00 5 .0
11
113.00 0
4 .0
112.00 11
0
0.00 5.00 10.00 15.00 20.00 25.00 3 .0
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE 11 DISTANCE

CHANAGE 50,700.000 M CHANAGE 50,750.000 M

116.00 116.00
R.L.

115.00 115.50

R.L.
115.00
114.00 114.50
113.00 114.00
113.50
112.00
113.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 50,800.000 M CHANAGE 50,850.000 M

118.00 117.00
117.00 116.50
R.L.

R.L.
116.00
116.00
115.50
115.00
115.00
114.00
114.50
113.00 114.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 50,900.000 M CHANAGE 50,950.000 M

117.00 117.00
R.L.

116.00 116.00
R.L.

115.00 115.00
114.00 114.00
113.00 113.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
117.00 117.00
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

R.L.
116.00 116.00

R.L.
115.00 115.00
114.00 114.00
113.00 113.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 51,000.000 M CHANAGE 51,050.000 M

117.00 116.40
R.L.

116.00 116.20

R.L.
115.00 116.00
114.00 115.80
113.00 115.60
112.00 115.40
0.00 5.00 10.00 15.00 20.00 25.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE
DISTANCE

CHANAGE 51,100.000 M CHANAGE 51,150.000 M

150.00 140.00
120.00
R.L.

100.00 100.00

R.L.
80.00
50.00 60.00
40.00
20.00
0.00 0.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 51,200.000 M CHANAGE 51,250.000 M

150.00 140.00
120.00
R.L.

100.00 100.00
R.L.

80.00
50.00 60.00
40.00
20.00
0.00 0.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE
150.00 140.00
120.00

R.L.
100.00 100.00

R.L.
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000
80.00
50.00 60.00
40.00
20.00
0.00 0.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 51,300.000 M CHANAGE 51,350.000 M

150.00 150.00
R.L.

R.L.
100.00 100.00

50.00 50.00
0.00 0.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE
DISTANCE

CHANAGE 51,400.000 M CHANAGE 51,450.000 M

150.00 140.00
120.00
R.L.

100.00

R.L.
100.00
80.00
60.00
50.00
40.00
20.00
0.00 0.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 51,500.000 M CHANAGE 51,550.000 M

116.50 117.00
116.00
R.L.

116.00
R.L.

115.50
115.00
115.00
114.50 114.00
114.00 113.00
113.50 112.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE
115.00
115.00
114.50 114.00
114.00 WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000
113.00
113.50 112.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 51,600.000 M CHANAGE 51,650.000 M

115.00 115.00
114.50
R.L.

114.00

R.L.
114.00
113.50 113.00
113.00
112.50 112.00
112.00 111.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 51,700.000 M CHANAGE 51,750.000 M

115.00 114.50
114.00
R.L.

114.00
113.00

R.L.
113.50
112.00 113.00
111.00
112.50
110.00
112.00
109.00
111.50
0.00 5.00 10.00 15.00 20.00 25.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

CHANAGE 51,800.000 M CHANAGE 51,850.000 M

115.50 116.00
115.00
R.L.

115.00

R.L.
114.50
114.00 114.00
113.50
113.00 113.00
112.50 112.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 51,900.000 M CHANAGE 51,950.000 M

116.00 115.50
115.50 115.00
R.L.

115.00 114.50

R.L.
114.50 114.00
114.00 113.50
113.50 113.00
112.50
113.00
112.00
-5.00 0.00 5.00 10.00 15.00 20.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 52,000.000 M CHANAGE 52,050.000 M

115.00 115.00
R.L.

114.00 R.L.
114.00
113.00 113.00
112.00
112.00
111.00
111.00 110.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 52,100.000 M
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

115.00
R.L.

114.00
113.00
112.00
111.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

50.000 M

0 20.00 25.00

50.000 M

00 14.00 16.00 18.00 20.00

50.000 M

0 12.00 14.00 16.00 18.00

50.000 M
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

0 12.00 14.00 16.00 18.00

50.000 M

.00 10
10
10
12.00 12
12 16.00 14
12
14.00 14
1418.00

50.000 M

12.00 14.00 16.00 18.00 20.00

50.000 M
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

15.00 20.00 25.00

50.000 M

.00 20.00 25.00

50.000 M

2.00 14.00 16.00 18.00 20.00

50.000 M
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

.00 20.00 25.00

50.000 M

5.00 20.00 25.00

50.000 M

.00 15.00 20.00

50.000 M
WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

2.00 14.00 16.00 18.00 20.00

50.000 M

5.00 20.00 25.00

50.000 M

5.00 20.00 25.00

50.000 M

5.00 20.00 25.00


WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

5.00 20.00 25.00

50.000 M

.00 20.00 25.00

50.000 M

5.00 20.00 25.00

50.000 M

5.00 20.00 25.00


WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

5.00 20.00 25.00

50.000 M

2.00 14.00 16.00 18.00 20.00

50.000 M

0 12.00 14.00 16.00 18.00

50.000 M

5.00 20.00 25.00


WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

5.00 20.00 25.00

50.000 M

0 12.00 14.00 16.00 18.00

50.000 M

0 12.00 14.00 16.00 18.00

50.000 M

0 12.00 14.00 16.00 18.00


WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

0 12.00 14.00 16.00 18.00

50.000 M

00 12.00 14.00 16.00 18.00

50.000 M

0 12.00 14.00 16.00 18.00

50.000 M

00 14.00 16.00 18.00 20.00


WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

00 14.00 16.00 18.00 20.00

50.000 M

5.00 20.00 25.00

50.000 M

.00 14.00 16.00 18.00 20.00


WIDENING AND STRENGTHENING OF HULBANI-TIKARAADA ROAD (SH-23) FROM 49/000 Km TO 60/000

50.000 M

2.00 14.00 16.00 18.00 20.00

50.000 M

.00 14.00 16.00 18.00 20.00

50.000 M

5.00 20.00 25.00


TARVA-BRAHMANI ROAD TO NADHARA

CHANAGE 52,150.000 M CHANAGE 52,200.000 M

116.00 116.00
R.L.

115.00

R.L.
114.00
114.00
113.00 112.00
112.00
111.00 110.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE
DISTANCE

CHANAGE 52,250.000 M CHANAGE 52,300.000 M

115.00 115.00
114.00
R.L.

114.00

R.L.
113.00
113.00
112.00
111.00 112.00
110.00 111.00
109.00 110.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 52,350.000 M CHANAGE 52,400.000 M

116.00 116.00
R.L.

114.00 114.00
R.L.

112.00 112.00
110.00 110.00
108.00
108.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00
DISTANCE DISTANCE

CHANAGE 52,450.000 M CHANAGE 52,500.000 M


TARVA-BRAHMANI ROAD TO NADHARA

118.00 116.00
115.00
R.L.

116.00

R.L.
114.00
114.00 113.00
112.00 112.00
111.00
110.00 110.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE DISTANCE

CHANAGE 52,550.000 M CHANAGE 52,600.000 M

101
115.00
101
115.00
R.L.

114.00
100.5
100.5 114.00 .24
0
10 .8

R.L.
113.00

R.L.
R.L.
113.00

R.L.
100
100
112.00 9 99.8
112.00
99.5 9 .4
99.5
111.00 99 .2
111.00
9
99
110.00
99 999
110.00
00
0.00 225.00 4 4 10.00 6 66 15.00
8 88 10 10
20.00
10 12
1225.00
12 109.00 ..66
9988 0.000
0 22 5.00 44 66
10.00 888 15.00 10
10
10 12
12
12
20.00 14
14
1425.00
DISTANCE
DISTANCE DISTANCE
DISTANCE
DISTANCE
DISTANCE

CHANAGE 52,650.000 M CHANAGE 52,700.000 M

116.00 116.00
115.00 115.00
R.L.

114.00
R.L.

114.00
113.00 113.00
112.00 112.00
111.00
111.00
110.00
110.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 52,750.000 M CHANAGE 52,800.000 M

116.00 115.50
115.00 115.00
R.L.

R.L.

114.50
114.00
114.00
TARVA-BRAHMANI ROAD TO NADHARA

116.00 115.50
115.00 115.00
R.L.

R.L.
114.50
114.00
114.00
113.00
113.50
112.00
113.00
111.00 112.50
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 52,850.000 M CHANAGE 52,900.000 M

116.00 116.00
115.00
R.L.

115.00

R.L.
114.00
114.00
113.00
112.00 113.00
111.00 112.00
110.00 111.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE
DISTANCE

CHANAGE 52,950.000 M CHANAGE 53,000.000 M

115.00 116.00
114.00
R.L.

115.00
R.L.

113.00 114.00
112.00 113.00
111.00 112.00
110.00 111.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 53,050.000 M CHANAGE 53,100.000 M

115.00 116.00
R.L.

114.00 115.00
R.L.

113.00 114.00
TARVA-BRAHMANI ROAD TO NADHARA

115.00 116.00
R.L.

114.00 115.00

R.L.
113.00 114.00
113.00
112.00
112.00
111.00 111.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 53,150.000 M CHANAGE 53,200.000 M

116.00 116.00
R.L.

R.L.
114.00 114.00
112.00 112.00
110.00
110.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE 0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE

CHANAGE 53,250.000 M CHANAGE 53,300.000 M

115.50 118.00
115.00 117.00
R.L.

114.50
R.L.

114.00 116.00
113.50 115.00
113.00
112.50 114.00
112.00 113.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 53,350.000 M CHANAGE 53,400.000 M

118.00 118.00
117.00
R.L.

117.00
116.00
R.L.

115.00 116.00
114.00 115.00
113.00 114.00
TARVA-BRAHMANI ROAD TO NADHARA

118.00 118.00
117.00
R.L.

117.00
116.00

R.L.
115.00 116.00
114.00 115.00
113.00 114.00
112.00
113.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 53,450.000 M CHANAGE 53,500.000 M

117.00 116.00
R.L.

115.00

R.L.
116.00
114.00
115.00
113.00
114.00 112.00
113.00 111.00
-5.00 0.00 5.00 10.00 15.00 20.00 0.00 5.00 10.00DISTANCE 15.00 20.00 25.00
DISTANCE

CHANAGE 53,550.000 M CHANAGE 53,600.000 M

116.00
115.00
R.L.

115.00
114.00
R.L.

114.00
113.00
113.00
112.00
112.00
111.00
111.00
110.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE 0.00 5.00 10.00
DISTANCE
15.00 20.00 25.00

CHANAGE 53,650.000 M CHANAGE 53,700.000 M

116.00
116.00
115.00
R.L.

115.00
R.L.

114.00
114.00
113.00
113.00 112.00
112.00 111.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
116.00
116.00
R.L. TARVA-BRAHMANI
115.00 ROAD TO NADHARA
115.00

R.L.
114.00
114.00
113.00
113.00 112.00
112.00 111.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 53,750.000 M CHANAGE 53,800.000 M

116.00 116.00 115.00


116.00
115.00
R.L.
R.L.

115.00 114.00
115.00
114.00

R.L.
R.L.
113.00 114.00 113.00
114.00
112.00 112.00
113.00
113.00
111.00
111.00
112.00
110.00 112.00
-5.00
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00 25.0020.00
20.00 110.00
111.00
DISTANCE 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE
DISTANCE
DISTANCE

CHANAGE 53,850.000 M CHANAGE 53,900.000 M

116.00 115.00
115.00
R.L.

114.00
114.00
R.L.

113.00 113.00
112.00 112.00
111.00 111.00
110.00
110.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 53,950.000 M CHANAGE 54,000.000 M

116.00 116.00
R.L.

115.00 115.00
R.L.

114.00 114.00
113.00 113.00
112.00 112.00
111.00 111.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
116.00 116.00
R.L.
115.00 115.00
TARVA-BRAHMANI ROAD TO NADHARA

R.L.
114.00 114.00
113.00 113.00
112.00 112.00
111.00 111.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 54,050.000 M CHANAGE 54,100.000 M

116.50 120.00
R.L.

116.00 119.00

R.L.
118.00
115.50 117.00
115.00 116.00
115.00
114.50
114.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 54,150.000 M CHANAGE 54,200.000 M

119.00 119.00
118.00 118.00
R.L.

R.L.

117.00
117.00
116.00
115.00 116.00
114.00 115.00
113.00 114.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 54,250.000 M CHANAGE 54,300.000 M

119.00 119.00
118.00
R.L.

118.00
R.L.

117.00
117.00 116.00
116.00 115.00
114.00
115.00 113.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
119.00 119.00
118.00
R.L.
118.00

R.L.
117.00 ROAD
TARVA-BRAHMANI TO NADHARA
117.00 116.00
116.00 115.00
114.00
115.00 113.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 54,350.000 M CHANAGE 54,400.000 M

118.00 119.00
R.L.

117.00 118.00

R.L.
116.00
117.00
115.00
114.00 116.00
113.00 115.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE
DISTANCE

CHANAGE 54,450.000 M CHANAGE 54,500.000 M

118.00
118.00
117.00
R.L.

R.L. 117.00
116.00
116.00
115.00
115.00
114.00
114.00
113.00
113.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE DISTANCE

CHANAGE 54,550.000 M CHANAGE 54,600.000 M

118.00 118.00
R.L.

117.00 117.00
R.L.

116.00 116.00
115.00 115.00
114.00 114.00
113.00 113.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE DISTANCE
117.00

R.L.
R
116.00 116.00
115.00 115.00 ROAD TO NADHARA
TARVA-BRAHMANI
114.00 114.00
113.00 113.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE DISTANCE

CHANAGE 54,650.000 M CHANAGE 54,700.000 M

118.00 118.00
R.L.

117.50

R.L.
116.00 117.00
114.00 116.50
116.00
112.00 115.50
0.00 5.00 10.00 15.00 20.00 25.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00
DISTANCE
DISTANCE

CHANAGE 54,750.000 M CHANAGE 54,800.000 M

118.00 118.00
R.L.

117.00 117.00

R.L.
116.00
116.00
115.00
115.00
114.00
114.00 113.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
CHANAGE 54,850.000 M CHANAGE 54,900.000 M

117.00 118.00
116.00
R.L.

117.00

R.L.
115.00 116.00
114.00 115.00
113.00
114.00
112.00
113.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE DISTANCE

CHANAGE 54,950.000 M CHANAGE 55,000.000 M

118.00
117.00 119.00
R.L.

116.00 118.00

R.L.
115.00 117.00
114.00 116.00
113.00 115.00
0.00 5.00 10.00 15.00 20.00 25.00 114.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 55,050.000 M CHANAGE 55,100.000 M

121.00 121.00
120.00
R.L.

120.00
R.L.

119.00
119.00
118.00
117.00 118.00
116.00 117.00
115.00 116.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
117.00
116.00 117.00
115.00 116.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 55,150.000 M CHANAGE 55,200.000 M

122.00 121.00
121.00 120.50
R.L.

120.00 120.00

R.L.
119.00 119.50
118.00 119.00
117.00 118.50
116.00 118.00
117.50
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 55,250.000 M CHANAGE 55,300.000 M

121.00
122.00
R.L.

121.00 120.00

R.L.
120.00 119.00
119.00 118.00
118.00 117.00
117.00 116.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 55,350.000 M CHANAGE 55,400.000 M

121.00
120.00
120.00
R.L.

119.00
119.00
R.L.

118.00 118.00
117.00 117.00
116.00 116.00
0.00 5.00 10.00 15.00 20.00 25.00 115.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
118.00
117.00 117.00
116.00 116.00
0.00 5.00 10.00 15.00 20.00 25.00 115.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 55,450.000 M CHANAGE 55,500.000 M

120.00
121.00
119.00
R.L.

120.00

R.L.
118.00 119.00
117.00 118.00
116.00 117.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 116.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 55,550.000 M CHANAGE 55,600.000 M

121.00 121.00
120.00 120.00
R.L.

R.L.
119.00 119.00
118.00 118.00
117.00 117.00
116.00 116.00
115.00 115.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 55,650.000 M CHANAGE 55,700.000 M

118.00 119.00
118.50
R.L.

117.00
R.L.

118.00
116.00 117.50
115.00 117.00
116.50
114.00 116.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE
117.00

R.L
118.00

R
116.00 117.50
115.00 117.00
116.50
114.00 116.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 55,750.000 M CHANAGE 55,800.000 M

121.00 121.00
R.L.

120.00 120.00

R.L.
119.00
119.00
118.00
117.00 118.00
116.00 117.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 55,850.000 M CHANAGE 55,900.000 M

120.00 122.00
121.00
R.L.

119.00 120.00

R.L.
118.00 119.00
118.00
117.00 117.00
116.00
116.00 115.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00
DISTANCE DISTANCE

CHANAGE 55,950.000 M CHANAGE 56,000.000 M

121.00 121.00
120.00
R.L.

120.00
R.L.

119.00 119.00
118.00
118.00
117.00
117.00
116.00
116.00 115.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
121.00
120.00

R.L.
120.00

R.L.
119.00 119.00
118.00
118.00
117.00
117.00
116.00
116.00 115.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
CHANAGE 56,050.000 M CHANAGE 56,100.000 M

120.00 121.00
119.00 120.00
R.L.

119.00

R.L.
118.00
117.00 118.00
117.00
116.00
116.00
115.00
115.00
114.00 114.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE DISTANCE

CHANAGE 56,150.000 M CHANAGE 56,200.000 M

120.00 121.00
119.50 120.00
R.L.

119.00 119.00

R.L.
118.50 118.00
118.00 117.00
117.50 116.00
117.00 115.00
114.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE DISTANCE

CHANAGE 56,250.000 M CHANAGE 56,300.000 M

122.00
122.00
R.L.

120.00
120.00
R.L.

118.00
118.00
116.00
116.00
114.00
114.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE DISTANCE
116.00
116.00
114.00
114.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE DISTANCE

CHANAGE 56,350.000 M CHANAGE 56,400.000 M

122.00 121.00
120.00
R.L.

120.00 119.00

R.L.
118.00 118.00
117.00
116.00 116.00
115.00
114.00 114.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE DISTANCE

CHANAGE 56,450.000 M CHANAGE 56,500.000 M

121.00 121.00
R.L.

120.00 120.00

R.L.
119.00 119.00
118.00 118.00
117.00 117.00
116.00 116.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 56,550.000 M CHANAGE 56,600.000 M

120.00
122.00
R.L.

119.00 121.00
R.L.

118.00 120.00
117.00 119.00
118.00
116.00
117.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
118.00 120.00
117.00 119.00
118.00
116.00
117.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 56,650.000 M CHANAGE 56,700.000 M

120.50 121.00
120.00 120.00
R.L.

119.00

R.L.
119.50
119.00 118.00
117.00
118.50
116.00
118.00
115.00
117.50 114.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE DISTANCE

CHANAGE 56,750.000 M CHANAGE 56,800.000 M

122.00 121.00
120.00
R.L.

120.00 119.00

R.L.
118.00 118.00
117.00
116.00 116.00
115.00
114.00 114.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00
DISTANCE DISTANCE

CHANAGE 56,850.000 M CHANAGE 56,900.000 M

121.00
120.00
R.L.

120.00
119.00
R.L.

119.00
118.00
118.00
117.00
117.00
116.00
116.00
115.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE
119.00

R.L.
119.00
118.00
118.00
117.00
117.00
116.00
116.00
115.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 56,950.000 M CHANAGE 57,000.000 M

121.00 121.00
120.00 120.00
R.L.

R.L.
119.00 119.00
118.00 118.00
117.00 117.00
116.00 116.00
115.00 115.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 57,050.000 M CHANAGE 57,100.000 M

120.00
R.L.

121.00 119.50
120.50

R.L.
119.00
120.00 118.50
119.50 118.00
119.00 117.50
118.50 117.00
118.00 0.00 5.00 10.00 15.00 20.00 25.00
0.00 2.00 4.00 6.00 DISTANCE
8.00 10.00 12.00 14.00 16.00 18.00 20.00 DISTANCE

CHANAGE 57,150.000 M CHANAGE 57,200.000 M

120.00
121.00
R.L.

119.00 120.00
R.L.

118.00 119.00
117.00 118.00
117.00
116.00
116.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE
120.00
121.00

R.L.
119.00 120.00

R.L.
118.00 119.00
117.00 118.00
117.00
116.00
116.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE
CHANAGE 57,250.000 M CHANAGE 57,300.000 M

121.00 120.50
R.L.

120.00 120.00

R.L.
119.00 119.50
118.00 119.00
117.00 118.50
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 57,350.000 M CHANAGE 57,400.000 M

120.00 121.00
120.50
R.L.

119.50

R.L.
120.00
119.00 119.50
118.50 119.00
118.50
118.00 118.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 57,450.000 M CHANAGE 57,500.000 M

120.00 119.00
118.50
R.L.

119.50
R.L.

119.00 118.00
117.50
118.50
117.00
118.00
116.50
117.50 116.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE
117.00
118.00
116.50
117.50 116.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 57,550.000 M CHANAGE 57,600.000 M

120.50 119.50
120.00
R.L.

119.00

R.L.
119.50
118.50
119.00
118.50 118.00
118.00 117.50
117.50 117.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 57,650.000 M CHANAGE 57,700.000 M

121.00 120.50
120.50
R.L.

120.00

R.L.
120.00
119.50
119.50
119.00 119.00
118.50 118.50
118.00 118.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 57,750.000 M CHANAGE 57,800.000 M

119.50 119.00
R.L.

119.00 118.00
R.L.

118.50
117.00
118.00
117.50 116.00
117.00 115.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
117.00
118.00
117.50 116.00
117.00 115.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 57,850.000 M CHANAGE 57,900.000 M

120.50 120.50
120.00 120.00
R.L.

119.50

R.L.
119.50
119.00 119.00
118.50
118.50
118.00
118.00
117.50
117.50 117.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 57,950.000 M CHANAGE 58,000.000 M

120.00 120.50
120.00
R.L.

119.50
119.50

R.L.
119.00 119.00
118.50 118.50
118.00 118.00
117.50
117.50 117.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 58,050.000 M CHANAGE 58,100.000 M

120.00 119.00
R.L.

119.00 118.50
R.L.

118.00
118.00
117.50
117.00
117.00
116.00 116.50
0.00 5.00 10.00 15.00 20.00 25.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE
119.00

R.L
R
118.00
118.00
117.50
117.00
117.00
116.00 116.50
0.00 5.00 10.00 15.00 20.00 25.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 58,150.000 M CHANAGE 58,200.000 M

119.00 120.00
119.50
R.L.

118.50

R.L.
118.00 119.00
118.50
117.50
118.00
117.00
117.50
116.50 117.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 58,250.000 M CHANAGE 58,300.000 M

121.00 122.00
121.00
R.L.

120.00
R.L.
120.00
119.00 119.00
118.00 118.00
117.00
117.00 116.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
CHANAGE 58,350.000 M CHANAGE 58,400.000 M

120.50
120.00 121.00
R.L.

119.50 120.00

R.L.
119.00 119.00
118.50 118.00
118.00
117.00
117.50
116.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 58,450.000 M CHANAGE 58,500.000 M

120.00
121.00
R.L.

119.00 120.00

R.L.
118.00 119.00
117.00 118.00
117.00
116.00
116.00
0.00 5.00 10.00 15.00 20.00 25.00
-5.00 0.00 5.00 10.00 15.00 20.00
DISTANCE DISTANCE

CHANAGE 58,550.000 M CHANAGE 58,600.000 M

121.00 121.00
R.L.

120.00 120.00
R.L.

119.00 119.00
118.00 118.00
117.00 117.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE
DISTANCE

CHANAGE 58,650.000 M CHANAGE 58,700.000 M

122.00 121.00
R.L.

121.00 120.00
R.L.

120.00 119.00
119.00 118.00
118.00 117.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
122.00 121.00

R.L.
121.00 120.00

R.L.
120.00 119.00
119.00 118.00
118.00 117.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 58,750.000 M CHANAGE 58,800.000 M

121.00 120.50
120.00
R.L.

120.00 119.50

R.L.
119.00 119.00
118.50
118.00 118.00
117.50
117.00 117.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

CHANAGE 58,850.000 M CHANAGE 58,900.000 M

121.00 120.50
R.L.

120.00
R.L. 120.00
119.50
119.00
119.00
118.00
118.50
117.00 118.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 58,950.000 M CHANAGE 59,000.000 M

120.50 120.50
120.00 120.00
R.L.

R.L.

119.50 119.50
119.00 119.00
120.50 120.50
120.00
R.L. 120.00

R.L.
119.50 119.50
119.00 119.00
118.50 118.50
118.00 118.00
117.50 117.50
0.00 5.00 10.00 15.00 20.00 25.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 59,050.000 M CHANAGE 59,100.000 M

121.00 120.50
120.00
R.L.

120.00

R.L.
119.50
119.00 119.00
118.00 118.50
118.00
117.00 117.50
0.00 5.00 10.00 15.00 20.00 25.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 59,150.000 M CHANAGE 59,200.000 M

121.00 120.50
120.00
R.L.

120.00
R.L.

119.50
119.00 119.00
118.00 118.50
118.00
117.00 117.50
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 59,250.000 M CHANAGE 59,300.000 M


121.00 120.50
120.00
R.L.

120.00

R.L.
119.50
119.00 119.00
118.00 118.50
118.00
117.00 117.50
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
DISTANCE DISTANCE

CHANAGE 59,350.000 M CHANAGE 59,400.000 M

120.50 120.50
120.00 120.00
R.L.

R.L.
119.50 119.50
119.00 119.00
118.50 118.50
118.00 118.00
117.50 117.50
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 59,450.000 M CHANAGE 59,500.000 M

120.00 121.50
121.00
R.L.

119.50
R.L.

119.00 120.50
120.00
118.50
119.50
118.00
119.00
117.50 118.50
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
120.00
121.00

R.L.
119.50

R.L.
119.00 120.50
120.00
118.50
119.50
118.00
119.00
117.50 118.50
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
0.00 25.00

5.00 20.00

25.00

25.00
25.00

6.00 18.00 20.00

0.00 25.00
00 16.00 18.00

00 16.00 18.00

0.00 25.00
00 16.00 18.00

0.00 25.00

0.00 25.00
0.00 25.00
CHANAGE 59,550.000 M CHANAGE 59,600.000 M

115.00 114.50
114.00
R.L.

114.50

R.L.
114.00 113.50
113.00
113.50
112.50
113.00
112.00
112.50 111.50
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 59,650.000 M CHANAGE 59,700.000 M

116.00
115.50 115.50
R.L.

115.00 115.00

R.L.
114.50 114.50
114.00 114.00
113.50 113.50
113.00 113.00
112.50
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 59,750.000 M CHANAGE 59,800.000 M

115.50
115.00 114.00
R.L.

114.50 113.50
R.L.

114.00 113.00
113.50 112.50
113.00 112.00
112.50 111.50
111.00
0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE
CHANAGE 59,850.000 M CHANAGE 59,900.000 M

116.00 115.00
R.L.

115.00 114.50

R.L.
114.00 114.00
113.00 113.50
112.00 113.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
DISTANCE DISTANCE

CHANAGE 59,950.000 M CHANAGE 60,000.000 M

114.50 114.50
R.L.

114.00 114.00

R.L.
113.50 113.50
113.00 113.00
112.50 112.50
112.00 112.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
DISTANCE DISTANCE

JUNIOR ENGINEER ASST.EXECUTIVE ENGINEER EXECUTIVE ENGINEER


R&B DIVISION R&B DIVISION R&B DIVISION
BOUDH BOUDH BOUDH
Err:509 Err:509

1.2 1.2
R.L. 1 1

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE
1.2
1 1

R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1
R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2
0.2
0
0
0.80 1.00 1.20 1.40 1.60 1.80 2.00
0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE
1.2 1.2
1

R.L.
1

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2
0.2
0
0
0.80 1.00 1.20 1.40 1.60 1.80 2.00
0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

0.8 0.8
R.L.

0.6 0.6
0.4 0.4
0.2 0.2
0 0
1.2 1.2
1 1

R.L.
0.8 0.8

R.L.
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE

Err:509 Err:509

1.2 1.2
1 1
R.L.

R.L.

0.8 0.8
0.6 0.6
1.2 1.2
1 1

R.L.

R.L.
0.8 0.8
0.6 0.6
0.4 0.4
0.2 0.2
0 0
0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.80 1.00 1.20 1.40 1.60 1.80
DISTANCE DISTANCE
r:509

1.40 1.60 1.80 2.00


STANCE

r:509

1.40 1.60 1.80 2.00


STANCE

r:509

1.40 1.60 1.80 2.00


STANCE
1.40 1.60 1.80 2.00
STANCE

r:509

1.40 1.60 1.80 2.00


STANCE

r:509

1.40 1.60 1.80 2.00


STANCE

r:509

1.40 1.60 1.80 2.00


STANCE
1.40 1.60 1.80 2.00
STANCE

r:509

1.40 1.60 1.80 2.00


STANCE

r:509

1.40 1.60 1.80 2.00


STANCE

r:509

1.40 1.60 1.80 2.00


STANCE
1.40 1.60 1.80 2.00
STANCE

r:509

1.40 1.60 1.80 2.00


STANCE

r:509

1.40 1.60 1.80 2.00


STANCE

r:509
1.40 1.60 1.80 2.00
STANCE

r:509

1.40 1.60 1.80 2.00


STANCE

r:509

1.40 1.60 1.80 2.00


STANCE

r:509
1.40 1.60 1.80 2.00
STANCE
NO-1 RCC CULVERT BANGOMUNDA -CHANDOTARA ROAD
1 EARTH WORK
ABUTMENT 2.00 3.70 4.20 2.30 71.48
WING WALL 2.00 3.00 (2.65+1.65)/2 2.30 12.90
BED/FLOORING 1.00 3.00 2.00 0.30 1.80
CUTT OFF WALL 1.00 2.50 1.50 0.30 1.13
87.31 CUM

2 SAND FILLING
ABUTMENT 2.00 3.70 4.20 0.15 4.66
WING WALL 2.00 3.00 (2.65+1.65)/2 0.15 12.90
BED/FLOORING 1.00 3.00 2.00 0.15 0.90
CUTT OFF WALL 1.00 2.50 1.50 0.15 0.56
19.02 CUM

3 C.C (1;3;6)
ABUTMENT 2.00 3.70 4.20 0.15 4.66
WING WALL 2.00 3.00 (2.65+1.65)/2 0.15 12.90
BED/FLOORING 1.00 3.00 2.00 0.15 0.90
CUTT OFF WALL 1.00 2.50 1.50 0.15 0.56
19.02 CUM

4 PCC M15
ABUTMENT 2.00 3.70 4.20 0.20 6.22
2ND 2.00 3.70 3.80 0.20 5.62
3RD 2.00 3.70 3.40 0.40 10.06
4TH 2.00 3.70 (3.4+2.4)/2 0.40 21.46
ABOVE GL 2.00 3.70 (2.4+0.8)/2 2.00 23.68
WING WALL 2.00 3.00 (2.25+1.55)/2 0.40 4.56
2.00 3.00 (2.25+1.25)/2 0.40 4.2
2.00 3.00 (1.55+1.25)/2 1.20 7.38
ABOVE GL 2.00 3.00 (1.55+0.5)/2 2.10 12.915
CUTT OFF WALL 1.00 2.50 0.30 1.20 0.9
PARAPET 1.00 3.00 0.4 0.50 0.6
97.60 CUM
5 RCC M20
SLAB 1.00 3.00 2.5 0.28 2.0625 CUM

6 WEEPHOLES
ABUTMENT 1 4 4 16
WING WALL 1 4 4 16
32 NOS
7 FILTER MEDIA
ABUTMENT 4.00 3.70 0.60 1.20 10.656
WING WALL 4.00 3.00 0.60 1.60 11.52
22.176 CUM
NO-2 RCC CULVERT
1 EARTH WORK
ABUTMENT 4.00 3.70 2.65 2.20 86.28
WING WALL 4.00 2.19 1.79 2.20 34.50
BED/FLOORING 2.00 2.10 1.90 0.35 2.79
CUTT OFF WALL 2.00 2.50 1.50 0.35 2.63
126.20 CUM

2 SAND FILLING
ABUTMENT 4.00 3.70 2.65 0.20 7.84
WING WALL 4.00 2.19 1.79 0.20 3.14
BED/FLOORING 2.00 2.10 1.90 0.20 1.60
CUTT OFF WALL 2.00 2.50 1.50 0.20 1.50
14.08 CUM

3 C.C (1;3;6)
ABUTMENT 4.00 3.70 2.65 0.20 7.84
WING WALL 4.00 2.19 1.79 0.40 6.27
4.00 1.40 1.65 0.40 3.70
BED/FLOORING 2.00 2.10 1.90 0.20 1.60
CUTT OFF WALL 2.00 2.50 1.50 0.20 1.50
20.91 CUM

4 PCC M15
ABUTMENT 4.00 3.70 2.25 0.20 6.66
3RD 4.00 3.70 1.25 0.40 7.40
4TH 4.00 3.70 (1.85+1.45)/1 0.40 9.77
5TH 4.00 3.70 (1.45+0.93)/2 0.80 14.09
WING WALL 4.00 2.19 1.39 0.40 4.87
4.00 1.40 1.25 0.40 2.80
4.00 2.19 1.19 0.40 4.17
4.00 1.40 1.05 0.40 2.35
ABOVE GL 0.00 3.00 (1.55+0.5)/2 2.10 0
CUTT OFF WALL 2.00 2.50 0.30 1.20 1.8
PARAPET 2.00 9.10 0.4 0.60 4.368
58.28 CUM
5 SUB-STRUCTURE
ABOVE GL 4.00 3.70 (0.93+0.8)/2 2.00 25.604
WING WALL 4.00 2.19 0.75 1.53 10.05
WING WALL 4.00 1.40 0.68 1.00 3.81
39.464 CUM
6 RCC M20
SLAB 2.00 2.50 3.2 0.30 4.8 CUM
7 WEEPHOLES
ABUTMENT 1 4 4 16
WING WALL 1 4 4 16
32 NOS

8 FILTER MEDIA
ABUTMENT 4.00 3.70 0.60 1.53 13.586
WING WALL 4.00 2.19 0.60 1.20 6.3072
19.894 CUM

NO-3 RCC CULVERT


1 EARTH WORK
ABUTMENT 4.00 3.70 2.65 2.20 86.28
WING WALL 4.00 2.90 1.79 2.20 45.68
BED/FLOORING 2.00 2.10 1.90 0.35 2.79
CUTT OFF WALL 2.00 2.50 1.50 0.35 2.63
137.38 CUM

2 SAND FILLING
ABUTMENT 4.00 3.70 2.65 0.20 7.84
WING WALL 4.00 2.90 1.79 0.20 4.15
BED/FLOORING 2.00 2.10 1.90 0.20 1.60
CUTT OFF WALL 2.00 2.50 1.50 0.20 1.50
15.09 CUM

3 C.C (1;3;6)
ABUTMENT 4.00 3.70 2.65 0.20 7.84
WING WALL 4.00 2.90 1.79 0.40 8.31
4.00 1.65 1.65 0.40 4.36
BED/FLOORING 2.00 2.10 1.50 0.20 1.26
CUTT OFF WALL 2.00 2.50 1.50 0.20 1.50
23.27 CUM

4 PCC M15
ABUTMENT 4.00 3.70 2.25 0.20 6.66
3RD 4.00 3.70 1.25 0.40 7.40
4TH 4.00 3.70 (1.85+1.45)/1 0.40 9.77
5TH 4.00 3.70 (1.45+0.93)/2 0.80 14.09
WING WALL 4.00 2.19 1.39 0.40 4.87
4.00 1.40 1.25 0.40 2.80
4.00 2.90 1.19 0.40 5.52
4.00 1.65 1.05 0.40 2.77
CUTT OFF WALL 2.00 2.50 0.30 1.20 1.8
PARAPET 2.00 10.80 0.55 0.60 7.128
62.81 CUM
5 SUB-STRUCTURE
ABOVE GL 4.00 3.70 (0.93+0.8)/2 1.50 19.203
WING WALL 4.00 2.90 0.75 1.53 13.31
WING WALL 4.00 1.65 0.68 0.30 1.35
33.86 CUM
6 RCC M20
SLAB 2.00 3.00 2.10 0.30 3.78 CUM

7 WEEPHOLES
ABUTMENT 1 4 4 16
WING WALL 1 4 4 16
32 NOS
8 FILTER MEDIA
ABUTMENT 4.00 3.70 0.60 1.53 13.586
WING WALL 4.00 2.90 0.60 1.20 8.352
21.938 CUM

NO-4 RCC CULVERT


1 EARTH WORK
ABUTMENT 4.00 3.70 2.65 2.20 86.28
WING WALL 4.00 2.90 1.79 2.20 45.68
BED/FLOORING 2.00 2.10 1.90 0.35 2.79
CUTT OFF WALL 2.00 2.50 1.50 0.35 2.63
137.38 CUM

2 SAND FILLING
ABUTMENT 4.00 3.70 2.65 0.20 7.84
WING WALL 4.00 2.90 1.79 0.20 4.15
BED/FLOORING 2.00 2.10 1.90 0.20 1.60
CUTT OFF WALL 2.00 2.50 1.50 0.20 1.50
15.09 CUM

3 C.C (1;3;6)
ABUTMENT 4.00 3.70 2.65 0.20 7.84
WING WALL 4.00 2.90 1.79 0.40 8.31
4.00 1.65 1.65 0.40 4.36
BED/FLOORING 2.00 3.40 2.10 0.20 2.86
CUTT OFF WALL 2.00 2.50 1.50 0.20 1.50
24.86 CUM

4 PCC M15
ABUTMENT 4.00 3.70 2.25 0.20 6.66
3RD 4.00 3.70 1.25 0.40 7.40
4TH 4.00 3.70 (1.85+1.45)/1 0.40 9.77
5TH 4.00 3.70 (1.45+0.93)/2 0.80 14.09
WING WALL 4.00 2.19 1.39 0.40 4.87
4.00 1.40 1.25 0.40 2.80
4.00 2.90 1.19 0.40 5.52
4.00 1.65 1.05 0.40 2.77
CUTT OFF WALL 2.00 2.50 0.30 1.20 1.8
PARAPET 2.00 9.40 0.55 0.70 7.238
62.92 CUM
5 SUB-STRUCTURE
ABOVE GL 4.00 3.70 (0.93+0.8)/2 1.20 15.362
WING WALL 4.00 2.90 (1.25+0.93)/3 1.53 19.35
WING WALL 4.00 1.65 (0.93+0.8)/4 0.30 1.71
36.42 CUM
6 RCC M20
SLAB 1.00 3.30 2.00 0.20 1.32 CUM
1.00 3.40 2.10 0.20 1.428
2.748
7 WEEPHOLES
ABUTMENT 1 4 4 16
WING WALL 1 4 4 16
32 NOS
8 FILTER MEDIA
ABUTMENT 4.00 3.70 0.60 1.53 13.586
WING WALL 4.00 3.00 0.60 1.20 8.64
22.226 CUM
NO-5 HPC 1000 MM DIA D/R
1 EARTH WORK
HEAD WALL 2.00 9.80 1.40 1.00 27.44
PIPE PORTION 2.00 2.50 2.50 0.65 8.13
35.57 CUM

2 SAND FILLING
HEAD WALL 2.00 9.80 1.40 0.20 5.49
PIPE PORTION 2.00 2.50 2.50 0.20 2.50
7.99 CUM

3 PCC M15
HEAD WALL 2.00 9.80 1.40 1.50 41.16
BELOW PIPE 1.00 3.00 2.50 1.45 10.88
PARAPET 2.00 9.80 0.4 0.75 5.88
DEDUCT PIPE 2.00 0.78 1.41 1.50 -3.2994
54.62 CUM
4 SUB-STRUCTURE
ABOVE GL 4.00 3.70 (0.93+0.8)/2 1.50 19.203
WING WALL 4.00 2.90 0.75 1.53 13.31
WING WALL 4.00 1.65 0.68 0.30 1.35
33.86 CUM
5 C.C (1;3;6)
HEAD WALL 2.00 9.80 1.40 0.20 5.49
5.49 CUM
6 NP4 RCC HPC
1000 MM DIA 2.00 2.50 2.00 10.00
10.00 RM

NO-6 DRAIN
1 EARTH WORK
1.00 180.00 1.00 1.05 189.00
189.00 CUM
2 SAND FILLING
1.00 180.00 1.00 0.15 27.00
27.00 CUM

3 C.C (1;3;6)
1.00 180.00 1.00 0.15 27.00
27.00 CUM

4 PCC M15
1.00 180.00 0.90 0.15 24.30
24.30 CUM
5 RCC M20
FLOOR 1.00 180.00 0.90 0.15 24.30
WALL 2.00 180.00 0.15 0.60 32.40
56.70 CUM
EARTH CALCULATION

WIDENING AND STRENGTHENING OF PHULBANI-TIKARAPADA ROAD (SH-23) FROM 49/000 Km TO 60/000


DISTANCE BS IS FS HI RL
0.930 100.93 100.00
0 1.250 100.93 99.68
10 1.390 100.93 99.54
20 1.535 100.93 99.40
30 1.680 100.93 99.25
40 1.700 100.93 99.23
50 1.800 100.93 99.13
60 1.820 100.93 99.11
70 1.750 100.93 99.18
80 1.670 100.93 99.26
90 1.610 100.93 99.32
100 1.540 100.93 99.39
110 1.520 100.93 99.41
120 1.460 100.93 99.47
130 1.440 100.93 99.49
140 1.410 100.93 99.52
150 1.360 100.93 99.57
160 1.290 100.93 99.64
170 1.240 100.93 99.69
180 1.200 100.93 99.73
190 1.100 100.93 99.83
200 1.070 100.93 99.86
210 1.050 100.93 99.88
220 1.130 100.93 99.80
230 1.100 100.93 99.83
240 1.060 100.93 99.87
250 1.070 100.93 99.86
260 1.110 100.93 99.82
270 1.180 100.93 99.75
CP 1.210 1.800 100.34 99.13
280 1.360 100.34 98.98
290 1.400 100.34 98.94
300 1.460 100.34 98.88
310 1.480 100.34 98.86
320 1.460 100.34 98.88
330 1.455 100.34 98.89
340 1.460 100.34 98.88
350 1.480 100.34 98.86
360 1.460 100.34 98.88
370 1.400 100.34 98.94
380 1.330 100.34 99.01
390 1.260 100.34 99.08
400 1.230 100.34 99.11
0 0.000
10 0.131
20 0.136
30 0.136
40 0.011
50 0.091
60 0.011
70 0.079
80 0.0.89
90 0.069
100 0.079
110 0.029
120 0.069
130 0.029
140 0.039
150 0.059
160 0.079
170 0.059
180 0.049
190 0.109
200 0.039
210 0.000
220 0.029
230 0.071
240 0.039
250 0.049
260 0.001
270 0.031
280 0.061
290 0.031
300 0.051
310 0.011
320 0.029
330 0.014
340 0.004
350 0.011
360 0.029
370 0.069
380 0.079
390 0.079
400 0.039

You might also like