BOILER MAINTENANCE (U# 8) DAILY MAINTENANCE LOG

DATE Work Descriptions


1. (a) ID Fan # 8A motor to Voith coupling alignment done:
22-12-2017
00

-0.16 +0.07

-0.05

-0.03

+0.07 -0.12

00

Axial1 Axial2

Axial Final (A1-A2) Radial


00

-0.04 00

-0.02

00.9

5.36 5.36

4.73

*(Coupling Gap: 10 MM)

(b) ID Fan # 8A Fan to Voith coupling alignment done:


BOILER MAINTENANCE (U# 8) DAILY MAINTENANCE LOG

DATE Work Descriptions


00

-0.01 -0.01

-0.02

00

00 00

00

Axial1 Axial2

Axial Final (A1-A2) Radial


00

-0.01 -0.01

-0.02

6. 00

5.36 5.35

4.70

*(Coupling Gap: 220 MM)

2. ID Fan # 8A coupling & necessary job is under progress.


3. Drum vent valve servicing & maintenance job under progress, lapping job under
progress, steam cutting observed.
4. Assisted at Oil transfer job from U #8 to U #7.
5. Coal feeder #8C discharge chute side scaffoldings job for the purpose of chute
dismantling is under progress.