An inspection tools accountability form records Rahat Ullah, an inspection engineer in the lifting department, as being responsible for inspection tools. The form lists his contact information and two tools assigned to him - a vernier caliper with identification SD-VC-11 and a pull out test kit identified as BTK1-03-18-000850 - 25 KN. The form requires approval and date but these fields are blank.
An inspection tools accountability form records Rahat Ullah, an inspection engineer in the lifting department, as being responsible for inspection tools. The form lists his contact information and two tools assigned to him - a vernier caliper with identification SD-VC-11 and a pull out test kit identified as BTK1-03-18-000850 - 25 KN. The form requires approval and date but these fields are blank.
An inspection tools accountability form records Rahat Ullah, an inspection engineer in the lifting department, as being responsible for inspection tools. The form lists his contact information and two tools assigned to him - a vernier caliper with identification SD-VC-11 and a pull out test kit identified as BTK1-03-18-000850 - 25 KN. The form requires approval and date but these fields are blank.