Inspection & Test Plan FOR Electrical
Inspection & Test Plan FOR Electrical
PAGE Rev.1 Rev.2 Rev.3 Rev.4 PAGE Rev.1 Rev.2 Rev.3 Rev.4
1 45 X
2 46
3 X X 47 X
4 X X X 48 X
5 X X X 49 X
6 X X 50 X
7 X X 51
8 X X 52
9 X X 53
10 X X X 54
11 X X X 55
12 X X 56
13 X X 57
14 X X 58
15 X X 59
16 X X 60
17 X X 61
18 X X 62
19 X X X 63
20 X X X 64
21 X X 65
22 X X 66
23 X 67
24 X 68
25 X 69
26 X 70
27 X 71
28 X 72
29 X 73
30 X 74
31 75
32 76
33 77
34 X 78
35 X 79
36 80
37 81
38 82
39 83
40 84
41 85
42 86
43 87
44 X 88
SOUTH PARS FIELD DEVELOPMENT
(PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
Job No. : 99012 Page : 3/23
INSPECTION & TEST PLAN FOR
Doc No. : INSP 99012 999
ELECTRICAL
8700 0004 Rev. 4
CONTENTS
NOTE :
COMPANY reserves the right to increase surveillance from SW to W and from W to H
depending on results of site surveillance activities.
COMPANY shall be notified of inspection points by CONTRACTOR at least 3 days in Advance
of the Activity
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Earthing and Lightning Installation PAGE 4 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST REMARK
OR PROCEDURE FORMAT SUBCON HDEC/ COMPANY
TPA
RP 5561V 999
2 Earthing Installation 1620 001 CPX26
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Earthing and Lightning Installation PAGE 5 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
3 Test
RP 5561V 999
3.1 Continuity Test 1620 001 TPX26 W SW SW
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Cable Ladder Installation PAGE 6 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
1.2
1.3
2.1
2.1
2.3
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Cable Ladder Installation PAGE 7 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
Support(Type/Size/Welding/Anchoring ) W SW W
Earthing / Bonding W SW SW
Final Inspection W W W
2.4
2.5
2.6
2.7
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Cable Installation PAGE 8 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
C CABLE INSTALLATION
2 Cable Installation
CPX08
2.1 Cable Type / Size / Routing Related DWG (HV cable) W SW SW
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Cable Installation PAGE 9 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
2.5 Cable Installation(In Cable Trenches) RP 5561V 999
1630 029
- Cable Trenches Preparation W W W
- Cable Segregation W SW W
3 Cable Termination
CPX08
3.1 Crimping Lug or Plug Size / Bolting (HV cable) W SW SW
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Cable Installation PAGE 10 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
4 Cable Test
SP-COM-511
4.1 Above 1000V Cable TPX08
RP 5561V 999
- Continuity Test 1630 029 H W W
- High-Voltage Test H H H
- Continuity Test W W W
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 11 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
D EQUIPMENT INSTALLATION
1.1
1.2
1.3
2.1
2.2
2.3
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 12 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
2.5 Cleaning W SW SW
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 13 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
- LV Transformer TPX03 W W W
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 14 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
4.6 Cleaning W SW SW
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 15 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 16 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
6.8 Cleaning W SW SW
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Equipment Installation PAGE 17 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Lighting and Small Power Installation PAGE 18 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Lighting and Small Power Installation PAGE 19 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
- Final inspection W W W
Test
SP-COM-511
Continuity Test TPX18/19/25 H W W
RP 5561V 999
Insulation Resistance Test 1630 029 H W W
RP 5561V 999
1640 001
3
3.1
3.2
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Heat Tracing Installation PAGE 20 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
F HEAT TRACING INSTALLATION
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Heat Tracing Installation PAGE 21 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
Accessory(Junction Box, Thermostats, Sensor) Related DWG W SW SW
Vendor spec
Test
SP-COM-511
Insulation Resistance Test TPX22 H W W
( Before insulation ) RP 5561V 999
1630 007
Insulation Resistance Test H W W
( After insulation)
3.1
3.2
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Cathodic Protection Installation PAGE 22 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
G CATHODIC PROTECTION INSTALLATION
SUBCON :
INSPECTION & TEST PLAN FOR SITE Rev. No. 4
DESCRIPTION OF WORK :
Telecommunication Installation PAGE 23 OF 23
PARTICIPATION BY
APPLICABLE SPEC. REPORTING
NO. DESCRIPTION OF INSPECTION / TEST HDEC/ REMARK
OR PROCEDURE FORMAT SUBCON COMPANY
TPA
H TELECOMMUNICATION INSTALLATION