No change
Page 2
is
2) Foundation design by Project’s Consultant, but shall consist of 50mm sand blinding (for
levelling of installed precast tanking) over minimum 200mm thick well-compacted crusher run,
with subgrade free of unsuitable materials/USM.
Voids
Project’s Consultant
joint wrap
Eco-module
a sub-grade
9)
Details 1b
10)
Page 4
Remove all page 4, replace with following
?? ton
?? ton