6.8.1 Overview
6.8.2 Step 9a Select Design Seismic Parameters
6.9.1 Introduction
6.9.2 Short-Term Surface Water and Groundwater Control
6.9.3 Long-Term Surface Water and Groundwater Control
50 mm (2 in.) MIN
DIA. SCH 40 PVC PIPE
10° - 15°
PROTECTIVE
PVC CAP
(NOTE 1)
NOTES
1. PROTECTIVE CAP NEEDS TO BE REMOVED AFTER FINAL
SHOTCRETE IS APPLIED
GEOCOMPOSITE GEOCOMPOSITE
DRAIN STRIP CONTINUOUS DRAIN STRIP
SOIL NAIL WALL GRAVEL DRAIN
WEEP HOLE
WEEP HOLE GEOTEXTILE
CONCRETE DITCH
FACING
ORIGINAL
GROUND SURFACE
SVo
LIFT 2
SV
15° (TYP)
LOWER WALL
LIFT 3
H2
SOIL NAIL (TYP)
FINAL GRADE
LIFT 4
FOOTING DRAIN
6.10.2 Composite Walls
6.10.3 Strut-Nails
6.10.3a Overview
6.10.3b Applications
6.10.4 Considerations for Frost Protection
6.11 Step 11 Other Design Considerations
6.12.1 Pre-Construction