Project : Construction of Bonifacio Global City - Ortigas Center Road Link Project
Makati City to Pasig City
Item Task Description Possible Hazards and Risk Risk Category Control Measure
1 Mobilization
1.1 Delivery and Equipment Vehicular Condition Delay/Accident/Property Damaged/Serious Injury Check-up vehicles condition before loading and operation
Vehicular Breakdown Equipped vehicular tools, fire and traffic protections
Cargo Loading and Unloading Delay/ Property Damaged/ Injury Proper piling, cover and tied-up with precautions
Vehicular Operation Delay/ Accident Operates with License and NC II
Vehicular Traffic Problems Delays Provide Traffic Management Group
1.2 Deployment of Manpower In-appropiate Personnel Rejection, delay and penalties, accident/incident Hired Qualified Applicant
Brawls and Disturbances Rejection, delay and penalties, accident/incident Hired only with good moral character
Medical and Clearances Rejection, delay and penalties, accident/incident Hired only with valid and complete clearances, fit to work
2 Earthworks
2.1 Soil Drilling Equipment Condition Breakdown/ Delays/ Accident Check and Observe Equipment Conditon every 4hrs interval
Equipped vehicular tools, fire pro and precautions
Moving Parts Serious or fatal injury Provide tag line when lifting
Soil and Water Spills Environmental Disturbances/ Penalties Avoid Soil and water spills into the river
2.2 Soil Excavation Equipment Condition Breakdown/ Delays/ Accident Check and Observe Equipment Conditon every 4hrs interval
Equipped vehicular tools, fire pro and precautions
Moving Parts Serious or fatal injury Provide tag line when lifting
Soil and Water Spills Environmental Disturbances/ Penalties Avoid Soil and water spills into the river
2.3 Backfilling Equipment Condition Breakdown/ Delays/ Accident Check and Observe Equipment Conditon every 4hrs interval
Equipped vehicular tools, fire pro and precautions
Moving Parts Serious or fatal injury Provide tag line when lifting
2.4 Hauling Equipment Condition Breakdown/ Delays/ Accident Check and Observe Equipment Conditon every 4hrs interval
Equipped vehicular tools, fire pro and precautions
Soil and Garbages Environmental Disturbances/ Penalties Acquired Certified Haulers
Do not exceed loading capacity
3 Rebar Works
3.1 Fabrication of Rebars Activities of Others Minor or serious Injury Provide cautions, permits and good communication
( Bending, Cutting and Splicing ) Wear complete P.P.E at all times
Fatique Strength Loss or Dizziness Take rest and refreshment periods
Moving Parts Serious or fatal injury Provide tag line when lifting
Prepared By : Noted By :
Mechanics
Driver/Operators
Driver/Operato/Helper
Driver/Operators
Guards and Traffic Officers
HR Dept.
HR Dept.
Safety Dept.
Mechanic/ Operator
Mechanic/ Operator
Mechanic/ Operator
Mechanic/ Operator
All Parties
Project-in-Charge, Foreman, Leadman, Operator and
Riggers
All Parties
All Parties
All Parties
All Parties
All Parties
Engineer, Foreman, Leadman, Operator and Riggers
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
All Parties
Contractors
Contractors
Approved By :