Professional Documents
Culture Documents
ESTIMATION SHEET ON Modification Jobs On OBM NBM Which Were Proposed by FLSmith
ESTIMATION SHEET ON Modification Jobs On OBM NBM Which Were Proposed by FLSmith
Job Text Modification jobs on OBM & NBM as per FLSMITH audit points
Scope of Job
1. 4" pipeline to be installed in NBM from NBM bagfilter discharge to bottom Air Slide.( approx- 6 mtr) 2
.OBM vent line modification to be done 10" pipe has ot be fabricate d & installed from OBM bafilter to GRS silo. Old line to be removed and new
line with slope angle to be fixed.( approx- 25 mtrs).
3 .6" line has to be modified from OBM Elevator discharge to bagfilter.Line to be modified as per NBM discharge line.( approx-12 mtrs).
4.4" line from NBM bag filter to top air slide
Period of PO to be
Service Dec-18 placed by 11/20/2018
PO
Validity 1 month
3 4" line from NBM bag filter to top air slide & top air slide to silo. MTR 12 L.S
6" line has to be modified from OBM Elevator discharge to
4 bagfilter.Line to be modified as per NBM discharge line MTR 12 L.S
Scope
1 Lines modifcation to be done as per FLSmith proposal.
2
*** scaffolding to be planned & arranged before starting the job as per field requirment.
Total : 33232.70
38217.61
533672
OT Hours Total
planned/
day
0 0
0 0.00
0
0