RotainAbility/SARR(Session abnormal release rate) :-
Definition: Abily of a user to retain the E-RAB once Connected for the
desired duration,
Point:-E-RAB release can be initiated by ENB & MME
Definition based on Counter:-
SARRe[(PmErabRelAbnormalE nbAct+PmErabRelMmeAct}(PmErabRelAbnormalE
nbAct#PmErabRelNormalEnb+PmErabRelNime)]"100
Enb Initiated E-Rab Release:-
{> PmErabRelNormalEnb
2> PmErabRelAbnormalEnbAct
1> PmErabRelMme
2>PmErabRelMmeAct
RetainAbility/SARR(Session abnormal release rate) :-
1 pmErabRelAbnormalEnbActCdt(The total number of abnormal ERAB
releases by the eNB per cell due cell down time (manual intervention) with the
pre-condition thatthe hrtial Context Establishment procedure must first have
been successfully completed and that there was data in either the UL or DL buffer
(e. active).
Soin: Check Outage report or Fluctuation Report.
‘2>pmErabRelAbnormalEnbActHo{The total number of abnormal ERAB
releases per cell by the eNB due io handover execution failure and tha there was
ata in either the ULor DL buffer (e. active)
Soln:1=PCI Collision issue check(PCl Planning should be correct) There should
No PCI reuse within near by cell ter 2tier neib),
22> Coverage issue(make Any PCI Dominant which should be based on Clutter as,
per Common sense).Make EDT,Change Azimuth
3 High UL Interference issue on Target cell(>mRadiorecinterferencePun). Check
Connection blw Antenna Connector & RRU Connector.
4> Also Repeater is responsile sometimes for H-UL InterferenceMight be due to
Powor Leakage.RetainAbility/SARR(Session abnormal release rate) :-
‘4> HiW issue,Alarm issue. Correct the issue based on Problem u Identify: Take help
(of Alex if you are not Understanding the Alarm meaning,
3> pmErabRelAbnormalE nbActUeLost(The total number of abnormal ERAB
releases by the eNB per cell due thal the contact with the UE is lost with the pre-
‘condition that the Initial Context Establishment procedure must first have been
‘successfully completed and that there was data in either the UL or DL bulfer (i.
active),
‘Solh: 1> Solve the Poor Coverage issue by making TiltAzimuth change or
Parameter change(Part of Sector Pw; ENB Power), for uplink
‘Coverage(PONominalPucch,PONominalPusch,
2> High UI interfrence issue(s por earlier mentioned Also make sure Nominal
pwr Should not set very high othenwise it wll create interference in neib cel)
Retainability/SARR(Session abnormal release rate) =
42 pmErabRelAbnormalEnbLic(The total number of abnormal E-RAB
Releases initiated by the RBS due to license reject (per cal).
Soln:1. Recently this issue | have faced in “Sprint NV Project" After
analysis it was found that there was issue with LKF file. Once New LKF file
uploaded issue get resolved.
2. IFLKF is correctly loaded then This counter will Peg only When user
have crossed the ENB License limit.
Pls upgrade the License Once u think that every basic Optimization u have
done.
5>pmErabRelAbnormalEnbActTnFail(The total number of abnormal
ERAB releases per cell due to S1 interface down, "X2 interface down" or
“Transport Resource Unavailable", with the pre-condition that the Initial
Context Establishment procedure must first have been successfully
completed and that there was data in either the UL or DL butter (ie.
active).
Soln: 1> Reise Ticket to NOC or IM Team to resolved the issue.RetainAbility/SARR(Session abnormal release rate) =
6>pmErabRelAbnormalEnbActHpr(The total number of abnormal ERAB
releases by the eNB per call due to handover preparation and that there was
data in either the UL or DL buffer (i.e, active).
Soln:t>MME might be Locked! cisabled.
2> MME mismatch bfw Scource & Target cel
3 Tranpott issue suspected.
4> License issue suspected
5> Site Configuration issue.
6> Hi-Load on Target Cell.