This document outlines maintenance work for four transformers at Pahlawan Power Sdn Bhd, including oil purification, inspection, testing, and replacement of parts. The transformers range in capacity from 8 MVA to 110/155 MVA. Work will include oil purification to specified standards, inspection of all parts for rust or leaks, replacement of gaskets, bolts, and bellows as needed, and electrical testing of windings and bushings. Total costs are not provided for each transformer maintenance item or lot.
This document outlines maintenance work for four transformers at Pahlawan Power Sdn Bhd, including oil purification, inspection, testing, and replacement of parts. The transformers range in capacity from 8 MVA to 110/155 MVA. Work will include oil purification to specified standards, inspection of all parts for rust or leaks, replacement of gaskets, bolts, and bellows as needed, and electrical testing of windings and bushings. Total costs are not provided for each transformer maintenance item or lot.
This document outlines maintenance work for four transformers at Pahlawan Power Sdn Bhd, including oil purification, inspection, testing, and replacement of parts. The transformers range in capacity from 8 MVA to 110/155 MVA. Work will include oil purification to specified standards, inspection of all parts for rust or leaks, replacement of gaskets, bolts, and bellows as needed, and electrical testing of windings and bushings. Total costs are not provided for each transformer maintenance item or lot.
1 Main Tank Oil Purification (optional - Shell Diala S4 ZX-1)
To execute at least three complete cycle to achieve Dielectric Breakdown Voltage of more than 60KV and Moisture Content less than 10ppm.
2 General Inspection & Replacement of Rubber Bellow
To perform cleaning of transformer body c/w inspection of rusted sections and antirust painting application at the body. All LV chambers, radiator flanges, transformer guard and bushing inspection.To conduct transformer guard tests by actual simulation for triggering the guards that verified by TKPS personnel's . To supply gaskets / o-rings if leakage happens: Type: Neoprene Rubberized Cork Sheet Gasket Make: James Walker Type: Nebar White N6/25 Sizes: Custom cut with thickness of 6.4mm, 10mm or 12.5mm (following thickness of existing gasket replaced) To supply and replace all bolts and nuts at the HV & LV Bushing with brass-type. To supply and replace all rubber bellows at the HV & LV side with 5mm THK.
3 Electrical Testing (3 days)
To perform these tests Tan Delta Testing on Transformer Winding and Bushing IR/PI for Transformer Winding Turns Ratio Test DC Winding Resistance Test
TOTAL
AGC217083 - Global E-Technic Transformer leaking rectification and filteration work
Maintenance of Transformer at Pahlawan Power Sdn Bhd
Item Description Qty Unit Price Extended Price
No RM RM
Maintenance of GTG2 Generator Step Up Transformer 1 LOT
1 Main Tank Oil Purification (optional - Shell Diala S4 ZX-1)
To execute at least three complete cycle to achieve Dielectric Breakdown Voltage of more than 60KV and Moisture Content less than 10ppm.
2 General Inspection & Replacement of Rubber Bellow
To perform cleaning of transformer body c/w inspection of rusted sections and antirust painting application at the body.
All LV chambers, radiator flanges, transformer guard and
bushing inspection.To conduct transformer guard tests by actual simulation for triggering the guards that verified by TKPS personnel's . To supply gaskets / o-rings if leakage happens: Type: Neoprene Rubberized Cork Sheet Gasket Make: James Walker Type: Nebar White N6/25 Sizes: Custom cut with thickness of 6.4mm, 10mm or 12.5mm (following thickness of existing gasket replaced) To supply and replace all bolts and nuts at the HV & LV Bushing with brass-type. To supply and replace all rubber bellows at the HV & LV side with 5mm THK.
3 Electrical Testing (3 days with GT2 Unit Aux. Tx)
To perform these tests Tan Delta Testing on Transformer Winding and Bushing IR/PI for Transformer Winding Turns Ratio Test DC Winding Resistance Test
TOTAL -
AGC217083 - Global E-Technic Transformer leaking rectification and filteration work
Maintenance of Transformer at Pahlawan Power Sdn Bhd
Item Description Qty Unit Price Extended Price
No RM RM Maintenance of ST Generator Step Up Transformer 1 LOT Specification and Job Scope
1 Main Tank Oil Purification (optional - Shell Diala S4 ZX-1)
To execute at least three complete cycle to achieve Dielectric Breakdown Voltage of more than 60KV and Moisture Content less than 10ppm.
2 General Inspection & Replacement of Rubber Bellow
To perform cleaning of transformer body c/w inspection of rusted sections and antirust painting application at the body.
All LV chambers, radiator flanges, transformer guard and
bushing inspection.To conduct transformer guard tests by actual simulation for triggering the guards that verified by TKPS personnel's . To supply gaskets / o-rings if leakage happens: Type: Neoprene Rubberized Cork Sheet Gasket Make: James Walker Type: Nebar White N6/25 Sizes: Custom cut with thickness of 6.4mm, 10mm or 12.5mm (following thickness of existing gasket replaced) To supply and replace all bolts and nuts at the HV & LV Bushing with brass-type. To supply and replace all rubber bellows at the HV & LV side with 5mm THK.
3 Electrical Testing (3 days with GT1 Unit Aux. Tx)
To perform these tests Tan Delta Testing on Transformer Winding and Bushing IR/PI for Transformer Winding Turns Ratio Test DC Winding Resistance Test
TOTAL -
AGC217083 - Global E-Technic Transformer leaking rectification and filteration work
Maintenance of Transformer at Pahlawan Power Sdn Bhd
Item Description Qty Unit Price Extended Price
No RM RM Maintenance of ST Unit Auxiliarry Transformer 1 LOT Specification and Job Scope
1 Main Tank Oil Purification (optional - Shell Diala S4 ZX-1)
To execute at least three complete cycle to achieve Dielectric Breakdown Voltage of more than 60KV and Moisture Content less than 10ppm.
2 General Inspection & Replacement of Rubber Bellow
To perform cleaning of transformer body c/w inspection of rusted sections and antirust painting application at the body.
All LV chambers, radiator flanges, transformer guard and
bushing inspection.To conduct transformer guard tests by actual simulation for triggering the guards that verified by TKPS personnel's . To supply gaskets / o-rings if leakage happens: Type: Neoprene Rubberized Cork Sheet Gasket Make: James Walker Type: Nebar White N6/25 Sizes: Custom cut with thickness of 6.4mm, 10mm or 12.5mm (following thickness of existing gasket replaced) To supply and replace all bolts and nuts at the HV & LV Bushing with brass-type. To supply and replace all rubber bellows at the HV & LV side with 5mm THK.
3 Electrical Testing (3 days with ST Generator Step Up)
To perform these tests Tan Delta Testing on Transformer Winding and Bushing IR/PI for Transformer Winding Turns Ratio Test DC Winding Resistance Test
TOTAL -
AGC217083 - Global E-Technic Transformer leaking rectification and filteration work
Maintenance of Transformer at Pahlawan Power Sdn Bhd
Item Description Qty Unit Price Extended Price
No RM RM Maintenance of GT1 Station Transformer 1 LOT Specification and Job Scope
Transformer Capacity : 8 MVA 11.5 KV/ 6.6 KV
Oil Volume 6122.3 Liters Vector group: Dyn11
1 Main Tank Oil Purification (optional - Shell Diala S4 ZX-1)
To execute at least three complete cycle to achieve Dielectric Breakdown Voltage of more than 60KV and Moisture Content less than 10ppm.
2 General Inspection & Replacement of Rubber Bellow
To perform cleaning of transformer body c/w inspection of rusted sections and antirust painting application at the body.
All LV chambers, radiator flanges, transformer guard and
bushing inspection.To conduct transformer guard tests by actual simulation for triggering the guards that verified by TKPS personnel's . To supply gaskets / o-rings if leakage happens: Type: Neoprene Rubberized Cork Sheet Gasket Make: James Walker Type: Nebar White N6/25 Sizes: Custom cut with thickness of 6.4mm, 10mm or 12.5mm (following thickness of existing gasket replaced) To supply and replace all bolts and nuts at the HV & LV Bushing with brass-type. To supply and replace all rubber bellows at the HV & LV side with 5mm THK.
3 Electrical Testing (3 days with GT1 Generator Step Up Tx)
To perform these tests Tan Delta Testing on Transformer Winding and Bushing IR/PI for Transformer Winding Turns Ratio Test DC Winding Resistance Test
TOTAL -
AGC217083 - Global E-Technic Transformer leaking rectification and filteration work
Maintenance of Transformer at Pahlawan Power Sdn Bhd
Item Description Qty Unit Price Extended Price
No RM RM Maintenance of GT2 Station Transformer 1 LOT Specification and Job Scope
Transformer Capacity : 8 MVA 11.5 KV/ 6.6 KV
Oil Volume 6122.3 Liters Vector group: Dyn11
1 Main Tank Oil Purification (optional - Shell Diala S4 ZX-1)
To execute at least three complete cycle to achieve Dielectric Breakdown Voltage of more than 60KV and Moisture Content less than 10ppm.
2 General Inspection & Replacement of Rubber Bellow
To perform cleaning of transformer body c/w inspection of rusted sections and antirust painting application at the body.
All LV chambers, radiator flanges, transformer guard and
bushing inspection.To conduct transformer guard tests by actual simulation for triggering the guards that verified by TKPS personnel's . To supply gaskets / o-rings if leakage happens: Type: Neoprene Rubberized Cork Sheet Gasket Make: James Walker Type: Nebar White N6/25 Sizes: Custom cut with thickness of 6.4mm, 10mm or 12.5mm (following thickness of existing gasket replaced) To supply and replace all bolts and nuts at the HV & LV Bushing with brass-type. To supply and replace all rubber bellows at the HV & LV side with 5mm THK.
3 Electrical Testing (3 days with GT1 Generator Step Up Tx)
To perform these tests Tan Delta Testing on Transformer Winding and Bushing IR/PI for Transformer Winding Turns Ratio Test DC Winding Resistance Test
TOTAL -
AGC217083 - Global E-Technic Transformer leaking rectification and filteration work