You are on page 1of 26

AS PLANNED DRAWING

PROYEK PEMBANGUNAN BTS PT. CENTRATAMA MENARA INDONESIA

NAMA SITE : RAMBUTAN_BPP_SPLIT3


SITE ID : R6400083
SITE ID I-SAT : 19BPP122
TYPE TOWER : Pole 12M
AREA : KALIMANTAN
TAHUN : 2018
CATATAN / KETERANGAN

DRAWING LIST
NO DRAWING TITLE NO DRAWING REMARK

1 SITE MAP 01
MENYETUJUI
2 STRUCTURE LAYOUT 02
PT. CENTRATAMA MENARA INDONESIA
3 SITE LAYOUT 03

4 SECTION A DAN B 04

5 DETAIL COUNTERWIGHT 05
PROYEK
6 GROUNDING SYSTEM LAYOUT 06

7 STANDART DESIGN POLE 12M (OVERVIEW) 07 PEMBANGUNAN BTS


8 PONDASI BTS RECTIFIER 08
SITE ID LOKASI

9 PONDASI BTS RECTIFIER 09


R6400083 /
RAMBUTAN
10 WIRING DIAGRAM PANEL KWH 1 PHASE 10 19BPP122
BPP_SPLIT3
11 LAYOUT PANEL KWH 1 PHASE 11 NAMA GAMBAR

12 SPESIFIKASI LIST PANEL KWH 1 PHASE 12


DRAWING LIST
13 WIRING DIAGRAM PANEL ACPDB 1 PHASE OUTDOOR 13

14 LAYOUT PANEL ACPDB 1 PHASE OUTDOOR 14

15 SPESIFIKASI LIST PANEL ACPDB 1 PHASE OUTDOOR 15

16 BAK KONTROL BAWAH 16 DIGAMBAR DIPERIKSA DIKETAHUI

17 DETAIL MOUNTING GSM 17

18 DETAIL MOUNTING RRU 18

19 DETAIL MOUNTING RRU 19

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

00 A3
N

CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

MASJID JAMI AL-WUSTHO

Jl.Jendral Ahmad Yani , Kel.Karang Jati


Kec Balikpapan Tengah Balikpapan PROYEK

-1.24663°
Bank BTN 116.83483°
PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR
Jl. Jenderal Ahmad Yani
SIte
Location
SDN 003
SITE LOCATION

400
300

Jl. KARANG JATI

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF
SITE MAP
Scale NTS

NO. REGISTER

01 A3
21350
1000 4250 4050 4000 4050 4000

3 N
B 260x460 B 260x460 B 260x460 B 260x460 B 260x460
C 430x430 C 430x430 C 430x430 C 430x430 C 430x430 C 430x430

B 260x460

B 260x460

B 260x460

B 260x460

B 260x460

B 300x600
2330

2330
CATATAN / KETERANGAN

5500
B 230x330 B 230x330 B 230x330 B 230x330 B 230x330

B 260x460

B 260x460

B 260x460

B 300x600

2330
6990
B 260x460

B 260x460
3170
C 430x430 C 430x430 B 230x330 B 230x330 B 230x330
C 430x430

B 260x460

B 260x460

B 260x460

B 300x600
B 260x460 B 260x460
2

2330
C 430x430 C 430x430 C 430x430 C 430x430
B 260x460 B 260x460 B 260x460
1
4000 4050 4000
MENYETUJUI
A B C D E F G
PT. CENTRATAMA MENARA INDONESIA
1st-2nd STRUCTURE LAYOUT
Scale NTS

21350
1000 4250 4050 4000 4050 4000
3
B 260x460 B 260x460 B 260x460 B 260x460 B 260x460
C 340x340 C 340x340 C 340x340 C 340x340 C 340x340 C 340x340
PROYEK
B 260x460

B 260x460

B 260x460

B 260x460

B 260x460

B 300x600
2330

2330
PEMBANGUNAN BTS
5500

B 230x330 B 230x330 B 230x330 B 230x330 B 230x330

B 260x460

B 260x460

B 260x460

B 300x600

2330
6990
B 260x460

B 260x460

SITE ID LOKASI
3170

C 340x340 C 340x340 C 340x340


B 230x330 B 230x330 B 230x330
R6400083 /
B 260x460

B 260x460

B 260x460

B 300x600
B 260x460
2
B 260x460
RAMBUTAN
19BPP122

2330
BPP_SPLIT3
1490

C 340x340 C 340x340 C 340x340 C 340x340


B 260x460 B 260x460 B 260x460
1 NAMA GAMBAR
1000 4250 4050 4000 4050 4000

A B C D E F G
STRUCTURE LAYOUT

3rd STRUCTURE LAYOUT


Scale NTS

8300 12050
1000 4000 4050 4000

B 260x460 B 260x460 B 260x460


C 340x340 C 340x340 C 340x340 C 340x340
B 260x460

B 260x460

B 260x460

B 300x600

2330
DIGAMBAR DIPERIKSA DIKETAHUI
5500

Lantai 3 B 230x330 B 230x330 B 230x330


B 260x460

B 260x460

B 260x460

B 300x600
Elv.+11.00 M

2330
6990
Elv.+13.70 M

B 230x330 B 230x330 B 230x330


C 340x340
B 260x460

B 260x460

B 260x460

B 300x600 REVISI

2330
SKALA
1490

C 340x340 C 340x340 C 340x340 C 340x340 NO. TANGGAL PARAF


B 260x460 B 260x460 B 260x460

8300 4000 4050 4000

D E F G
NO. REGISTER
4th STRUCTURE LAYOUT
Scale NTS 02 A3
N

CATATAN / KETERANGAN

MENYETUJUI
870 2400 5860 12390
PT. CENTRATAMA MENARA INDONESIA
350

POLE 1
1500

ACPDB

PROYEK
1166

ATAP
PEMBANGUNAN BTS
BTS
Elv.+11.00 M
TELKOMSEL Elv.+13.70 M

7330
ACCES SITE ID LOKASI
2500

PROPOSED
POLE 12m R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
300

NAMA GAMBAR

POLE 2
B SITE LAYOUT

830 300 2500 1100 4398 12390

SITE LAYOUT
Scale NTS
DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

03 A3
CATATAN / KETERANGAN
PROPOSED
PROPOSED
POLE 12m
POLE 12m

POLE 1
MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA


BTS
TELKOMSEL

ACCES ELEV.+13.70 M
PROYEK
B 260x460 B 260x460 B 260x460

PEMBANGUNAN BTS

2700
C 340x340

C 340x340

C 340x340

C 340x340
Proposed

ELEV.+11.00 M
PAD BTS
ELEV.+11.00 M
SITE ID LOKASI
B 260x460 B 260x460 B 260x460 B 260x460 B 260x460 B 260x460 B 260x460
B 230x330 R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
C 340x340

C 340x340

C 340x340

C 340x340

C 340x340

C 340x340

C 340x340

C 340x340
3500

3500
NAMA GAMBAR

ELEV.+7.50 M ELEV.+7.50 M
SECTION A & B
B 260x460 B 260x460 B 260x460 B 260x460 B 260x460 B 260x460 B 260x460

13700
B 230x330

3500

3500
C 430x430

C 430x430

C 430x430

C 430x430

C 430x430

C 430x430

C 430x430

C 430x430

11000
ELEV.+4.00 M ELEV.+4.00 M

B 260x460 B 260x460 B 260x460 B 260x460 B 260x460 B 260x460 B 260x460 DIGAMBAR DIPERIKSA DIKETAHUI
B 230x330
C 430x430

C 430x430

C 430x430

C 430x430

C 430x430

C 430x430

C 430x430

C 430x430
4000

4000
ELEV.±0.00 M ELEV.±0.00 M
REVISI
1000 4250 4050 4000 4050 4000 SKALA
NO. TANGGAL PARAF

SECTION A SECTION B
Scale NTS Scale NTS

NO. REGISTER

04 A3
3000
250 2500 250

250

500
CATATAN / KETERANGAN

200
3000
2500

70

70
300 100

2500
MENYETUJUI

250
500 2500 PT. CENTRATAMA MENARA INDONESIA

70
3000
100 300 2200 300 100 PROYEK

300 100

100 300 100


500
PEMBANGUNAN BTS

SITE ID LOKASI
Ø10 - 150
R6400083 /
3000

2200
RAMBUTAN
19BPP122

2500
BPP_SPLIT3
NAMA GAMBAR

DETAIL COUNTRWIGHT

100 300
500 2500
100 300 100

a b c d e f L.potong Berat Satuan Berat


Dia Qty
COUNTERWEIGHT (mm) (mm) (mm) (mm) (mm) (mm) (mm) (m) (kg/m) (kg)
DIGAMBAR DIPERIKSA DIKETAHUI

Longitudinal b a 2880 80 - - - - 13 3.04 1.04 16 50.586

a
Sengkang b 440 340 80 - - - 10 1.72 0.617 40 42.450
c

Hilti Konektor c b a - - - 5.616


70 300 80 13 0.45 1.04 12

REVISI
Berat Total Pembesian Counterweight = 98.652 kg SKALA
Volume Total Beton Counterweight = 1.10m3
NO. TANGGAL PARAF
Kebutuhan HILTI HIT RE-500 = 12 Titik
200
400

400

NB :
300 2500 200  Concrete material K-225 (f'c = 18.675 MPa)
Reinforcement Bar Material
3000 Diameter 13 mm fy = 3900 (BJTD) NO. REGISTER
Diameter 13 mm fy = 2400 (BJTD)
 Untuk Perekat antara beton lama dan baru digunakan
SIKACIM BONDING ADHESIVE (atau produk sejenis)
05 A3
N

CATATAN / KETERANGAN

AAAC-S 70MM2
From Splitzen to Bimetalic Clamp SPLITZEN MENYETUJUI
AAC 50mm2
PT. CENTRATAMA MENARA INDONESIA
AAC 50mm2 From ACPDB to EGB
From EGB to Grounding PIT 2
Bimetal

4x Copper Bonded Rod KWH POLE 1


Bimetal

ACPDB
PROYEK

Ring Perimeter Grounding PIT 2


BC 50mm2 PEMBANGUNAN BTS
BC 50mm2 ATAP
Grounding PIT 1
From Bimetalic Clamp to Copper Rod SITE ID LOKASI
Lower
BTS
Elv.+11.00 M
AAC 50mm2 TELKOMSEL R6400083 /
From KWH meter to Grounding PIT 1 ACCES RAMBUTAN
Upper

19BPP122
PROPOSED
BPP_SPLIT3
POLE 12m
NAMA GAMBAR

GROUNDING SYSTEM LAYOUT

AAC 50mm2 POLE 2


From Pole to EGB
AAC 50mm2
From Lower Busbar to EGB
GROUNDING SYSTEM LAYOUT
Scale NTS DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

06 A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

FOUNDATION POSITIONING
PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

STANDART DESIGN POLE 12M

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

B NO. REGISTER

07A A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

STANDART DESIGN POLE 12M

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

07C A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

STANDART DESIGN POLE 12M

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

07B A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

STANDART DESIGN POLE 12M

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

07D A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

STANDART DESIGN POLE 12M

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

07E A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

STANDART DESIGN POLE 12M

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

07F A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

STANDART DESIGN POLE 12M

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

07G A3
2400

CATATAN / KETERANGAN
Ø12-200

Ø12-200
Pad t : 100 mm

1500
MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

DETAIL PAD BTS PROYEK


Scale NTS

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR
Ø12 - 200
PONDASI BTS

100
1500

SECTION A DIGAMBAR DIPERIKSA DIKETAHUI


Scale NTS

Ø12 - 200

100
REVISI
2400 SKALA
NO. TANGGAL PARAF

SECTION B NO. REGISTER


Scale NTS
08 A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA


a b Dia L.Potong Berat
(mm) (mm) (mm) (m) Qty (Kg)
PROYEK
PAD
PEMBANGUNAN BTS
a
L = 1500 b 1400 75 12 1.55 24 33.033 SITE ID LOKASI

a R6400083 /
RAMBUTAN
19BPP122
L = 2400 b 2300 75 12 2.45 16 34.81 BPP_SPLIT3
NAMA GAMBAR

Berat Total Pembesian Pad : 67.843 kg PONDASI BTS

3
Volume Total Beton Pad : 0.36 M

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

09 A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

WIRING DIAGRAM
PANEL KWH 3 PHASE

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

10 A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

LAYOUT
PANEL KWH 1 PHASE

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

11 A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

LIST MATERIAL
PANEL KWH 3 PHASE

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

12 A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

WIRING DIAGRAM
PANEL ACPDB 3 PHASE OUTDOOR

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

13 A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

LAYOUT PANEL
ACPDB 1 PHASE OUTDOOR

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

14 A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

LIST MATERIAL
PANEL ACPDB 3 PHASE OUTDOOR

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

15 A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

BAK KONTROL BAWAH

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

16 A3
CATATAN / KETERANGAN

MENYETUJUI

PT. CENTRATAMA MENARA INDONESIA

PROYEK

PEMBANGUNAN BTS

SITE ID LOKASI

R6400083 /
RAMBUTAN
19BPP122
BPP_SPLIT3
NAMA GAMBAR

DETAIL MOUNTING

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

NO. REGISTER

17 A3
PROPOSED
ANTENNA RF ISAT ON ... M CATATAN / KETERANGAN

PROPOSED
RRU ON ... M

MENYETUJUI

SECTOR ANTENNA PT. CENTRATAMA MENARA INDONESIA


AZIMUT °
Elev. ... to M.A.G.L

PROYEK

PEMBANGUNAN BTS
12000

SECTOR ANTENNA SITE ID LOKASI

AZIMUT °
.......

R6400083 /
.......

RAMBUTAN
Elev. ... to M.A.G.L 19BPP122
BPP_SPLIT3
NAMA GAMBAR

ANTENNA PLACEMENT

DIGAMBAR DIPERIKSA DIKETAHUI

REVISI
SKALA
NO. TANGGAL PARAF

ANTENNA PLACEMENT
Scale NTS

NO. REGISTER

18 A3