Professional Documents
Culture Documents
Site Organization and Management: István Vidovszky PHD
Site Organization and Management: István Vidovszky PHD
Introduction
Site management
Site planning
INTRODUCTION
1
04/11/2015
1 DEFINITION
Site management…
2
SITE LOGISTICS
• design
• delivery
• procurement
• movement
• construction practices
• installation
SITE MANAGEMENT
INPUT OUTPUT
process optimization
ensuring efficiency
minimization of waste
2
04/11/2015
2
SUSTAINABLE WASTE MANAGEMENT
2
WASTE MANAGEMENT ON THE SITE
3
04/11/2015
2
CONSTRUCTION SITE COMMUNICATION
• information management
• information distribution
• plan utilization
• change management
SITE MANAGEMENT
2
SITE SECURITY AND SAFETY
• to protect public
4
04/11/2015
2
CONSTRUCTION EQUIPMENT LOGISTICS
• to minimize/reduce waste
SITE MANAGEMENT
1 DEFINITION
DEF.:
5
04/11/2015
• hospital
• factory
• museum
• other
Minimize
Optimization
• accidents, damage and health injury
• time • resource consumption
• cost • transport times
• material logistic • material loss
• transport • waste
Maximize
• work safety
SITE PLANNING
6
04/11/2015
3
METHODS
3 INFLUENCING FACTORS
7
04/11/2015
3 PLANNING CONSTRUCTION
Construction Site
Cost calculation
Plan
3 CONTENT
Drawings:
• site map
• general site plan
• organizational phase plans
• detailed operation plans
Written documentations:
• Transportation, etc.)
• work safety documentation
• description on machinery, equipment,
temporary objects
• waste management documentation
• supporting calculations
• schedule
8
04/11/2015
Minimum information:
9
04/11/2015
3
CONSTRUCTION SITE PHASE PLANS
Representing a certain construction phase (e.g. earthwork, slab construction, etc.)
(M1:100, M1:500)
(M1:100, M1:50)
10
04/11/2015
3 SITE ORGANIZATION
SITE PLANNING
Central zone:
External zone
The structure and the closest place around. (Usually
Intermediate zone
place for tower crane, lifting equipment, scaffolding)
Internal zone Internal zone:
Uploading places, active depots (e.g. formwork,
Central zone
prefabricated elements, etc.)
External zone:
The tower crane does not reaches this zone. Ideal
for temporary facilities, staging buildings, parking
places, small machine and power tool container, etc.
11
04/11/2015
- management office
- documentation and back-up (archive) office
- subcontractor’s offices
- meeting (conference) room
- toilet (restroom)
- dressing room
SITE PLANNING
3 STORING FACILITIES
Closed space required for power tools and weather sensitive materials/components
(UV, heat, freeze, rain, wind):
- small machines, power-handtool storage
- closed material depot (per each technology per each subcontractor)
- formwork
- reinforcement bars and armature
12
04/11/2015
3 CONTAINERS
SITE PLANNING
3 CONTAINERS
13
04/11/2015
3 SILOS
Technical data:
• volume:18m³ / 22m³
• empty weight: 2.4t / 2.7t
• max. capacity 27t / 33t
• max. height 6.6m /7.2m
• basic area: 3x3m
14
04/11/2015
3 MOVING MATERIALS
Minimize the elements movement on the site!
• by manpower
• by palette lifter/palette truck
• by elevator and pushcart
• by crane (grab and lifting spots: optimal if the crane operator can see both)
15
04/11/2015
regulated,
• the sidewalks of the attaching streets/roads permission is
• the traffic lanes on the attaching street/road required and a fee
• park area, green lane, etc. have to be paid
SITE PLANNING
private contract
• empty plot, part of the neighbouring garden or yard required, rent have
to be paid
Step 3…
SITE PLANNING
Step 2
Step 1
16
04/11/2015
neigboring buildings
topographic lines
inclinations
vegetation
(trees, bushes)
Existing building on
the site
SITE PLANNING
Planned
direction of the building Gas, water,
traffic) wastewater,
Streets/roads around the site electricity, etc.
Streets/roads
around the
site
SITE PLANNING
17
04/11/2015
transportation
routes machinery (for
temporary material
(for machinery, structures
for workers) movement,
welfare, office and
and storing technology)
first aid point
protection (closed)
equipment
(guard post,
fence, gate)
+
SITE PLANNING
?
?
? ?
?
SITE PLANNING
18
04/11/2015
1) Collect all the input information and questions about the building
2) Collect all the input information and questions about the site and environment
3) Arrange the site layout, make your decisions:
a) Mark the neighborhood and the environment (roads, trees, etc.)
b) Mark the site and the existing elements of the building
c) Main equipment
d) Main materials and depots
e) Inside roads
f) Welfare facilities (calculated amount)
g) Health & safety objects
SITE PLANNING
S REFERENCES