Project: ETAP Page: 1

7.0.0
Location: Date: 27-06-2012
Contract: SN: 12345678
Engineer: Revision: Base
Study Case: SC
Filename: SC 6-6KV Config.: Normal

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

Bus1 33.000 14.313 35.378 13.122 13.891 34.335 13.891 13.891 12.393 30.633 12.393 12.393 14.115 34.890 14.115 14.115
Bus2 6.600 27.720 71.056 20.252 28.211 72.314 28.211 28.211 23.990 61.494 23.990 23.990 28.206 72.302 28.206 28.206
Bus3 6.600 27.667 70.852 20.190 28.074 71.893 28.074 28.074 23.944 61.317 23.944 23.944 28.095 71.947 28.095 28.095

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.