ETAP

Project:

Page:

Date:

12-01-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
GI WATES

Short-Circuit Summary Report


1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents
Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus
ID
Bus2261

3-Phase Fault

Line-to-Ground Fault

Line-to-Line Fault

kV

Real

Imag.

Mag.

Real

Imag.

Mag.

Real

20.00

1.425

-3.348

3.639

0.390

-1.581

1.628

2.900

All fault currents are symmetrical momentary (1/2 Cycle network) values in rms kA
* LLG fault current is the larger of the two faulted line currents

Imag.
1.234

Mag.
3.151

*Line-to-Line-to-Ground
Real
2.798

Imag.
1.746

Mag.
3.298

ETAP

Project:

Page:

Date:

12-01-2015

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

6.0.0

Location:

Filename:

Study Case: SC
GI WATES

Short-Circuit Summary Report

Bus
ID
Bus2261

Positive Sequence Imp. (ohm)


kV
20.000

Negative Sequence Imp. (ohm)

Zero Sequence Imp. (ohm)

Resistance

Reactance

Impedance

Resistance

Reactance

Impedance

Resistance

Reactance

Impedance

1.24245

2.91995

3.17329

1.24245

2.91995

3.17329

2.61055

14.81959

15.04777