AMERICAN SEGMENTAL BRIDGE INSTITUTE COST DATA

October 22, 2002


AMERICAN SEGMENTAL BRIDGE INSTITUTE

COST OF CONCRETE SEGMENTAL BRIDGES

TYPE PROJECT SPAN TYPE C.I.P SPAN/SPAN OVERLAY YEAR SPECIAL BRIDGE TOTAL TOTAL SQ. FT. COST SUBMITTED
OF NAME RANGE OF P.C. BALANCE GRINDING BID CONDITION WIDTH COST OF COST OF OF PER LOCATION OWNER DESIGNER CONTRACTOR BY
BRIDGE PILE OTHER OTHER GROOVING PROJECT BRIDGE BRIDGE SQ. FT.
285’-340’ Contractor
BRIDGE 450’-380’ Mined Shafts redesign I-008, 40 mi
OVER Pine Valley 266’ & grouted C.I.P. Balanced Membrane 1971 from draped 2@42’ $ 10.48 M 144,144 $72.68 East of CALTRANS CALTRANS Dyckerhoff J.Hare
WATER Creek (Parallel not anchors Cantiliver & AC strand to San Diego & Widmann
same) straight bars
26" sq. 36"
BRIDGE 120’ diam. Precast C.I.P. Balanced
OVER Napa River to prestress + P.C. Cantiliver 2" AC 1974 62’ $ 8.17 M 138,260 $59.07 Route 29 CALTRANS CALTRANS Guy F.Atkinson J.Hare
WATER 250’ cast-in-drilled Lightweight & span/span near Napa
hole 16"

BRIDGE 375’
OVER Beltway B over to 24" dia. C.I.P. Balanced Asphalt 1979 3 Webs 59’4" $ 19.5 M 88,875 $219.90 Houston TxDOT HNTB Williams M.Miller
WATER Ship Channel 750’ Pipe piles Cantilever Texas Bros.

BRIDGE
OVER Long Key 118’ P.C. Span/Span 1979 38’ $ 14.5 M 468,400 $31.00 Florida Keys FL DOT Figg Michael A. Moreton
WATER Engineering Construction

BRIDGE
OVER Seven Mile 135’ P.C. Span/Span 1979 38’ $ 43.0 M 1,376,300 $31.20 Florida Keys FL DOT Figg Misener A. Moreton
WATER Engineering Marine Const.

BRIDGE West Seattle Pipe Pile & West Seattle


OVER Bridge 375’ - 590’ Hollow C.I.P. Balanced Overlay 1980 102’ $ 24.8 M $ 24.8 M 136,680 $181.45 Seattle,WA City of Bridge Design Kiewit-Grice Paul Giuntini
WATER Contract 4 Concrete Cantilever Seattle Team JV
Pile

BRIDGE
OVER Dauphin 118’-400’ P.C. Balanced 1980 85’ Clearance 102’ $ 13.0 M 166,666 $78.00 Alabama AL DOT Figg Brown & Root Figg
WATER Island Cantiliver Engineering Engineering

BRIDGE
OVER Niles Channel 118’ P.C. Span/Span 1981 38’ $ 7.7 M 175,600 $43.90 Florida Keys FL DOT Figg Michael A. Moreton
WATER Engineering Construction

BRIDGE
OVER Channel Five 135’0 P.C. Span/Span 1981 38’ $ 4.63 M 91,300 $50.70 Florida Keys FL DOT Figg Michael A. Moreton
WATER Engineering Construction

Latex Modif.
BRIDGE Columbia River 260’-450’ 70T C.I.P. Concrete WSDOT
OVER Bridges 450’-450’ Steel Piles Haunched Balanced Overlay 1981 3 main spans 63’-3" $ 23.8 M $ 22.7 M 236,555 $95.96 Richland WSDOT BRIDGE & Johnson Chuck Ruth
WATER @ Richland 260’ @End Piles Segmental Cantiliver After of 450’ each Washington STRUCTURES Bros
Grinding

BRIDGE Muskspan
OVER River 270’ C.I.P. Span/Span Latex 1982 46’ $ 4.6 M 44,160 $104.23 Big Rapids Michigan HNTB M.Miller
WATER Bridge Michigan DOT

219’-285’-
BRIDGE Columbia 480’-660’- C.I.P. Latex Modif.
OVER River at 660’-660’- Haunched Balanced Overlay 1984 49.3’ $19.3 M $ 15.9 M 165,726 $96.03 Umatilla WSDOT WSDOT Johnson Bros. J.A. Weigel
WATER Umatilla 480’-330’- Segmental Cantilever after Oregon
251’ Grinding

Nov. 1-2, 1999


1 Annual Convention
AMERICAN SEGMENTAL BRIDGE INSTITUTE

COST OF CONCRETE SEGMENTAL BRIDGES

TYPE PROJECT SPAN TYPE C.I.P SPAN/SPAN OVERLAY YEAR SPECIAL BRIDGE TOTAL TOTAL SQ. FT. COST SUBMITTED
OF NAME RANGE OF P.C. BALANCE GRINDING BID CONDITION WIDTH COST OF COST OF OF PER LOCATION OWNER DESIGNER CONTRACTOR BY
BRIDGE PILE OTHER OTHER GROOVING PROJECT BRIDGE BRIDGE SQ. FT.

BRIDGE 175’ Lift Span &


OVER Valey City to Steel H C.I.P. Balanced Asphalt 1986 42’ $ 24.0 M 274,386 $87.46 Valley City Illinois HNTB Shasppert M.Miller
WATER Eagles Bridge 550’ Cantiliver Illinois DOT

BRIDGE Centenial
OVER Memorial 540’ Spread C.I.P. Balanced Latex 1988 Cocur Idaho HNTB Maseman M.Miller
WATER Bridge Footing Cantiliver d’A’ens DOT

BRIDGE Port Port of Misener Marine


OVER of 96’-195’ 30" PC P.C. Balanced Grinding 1988-89 Ship Impact 53’-2" $ 40.0 M $ 25.60 M 268,105 $95.48 Miami Miami, Dade Beiswenger, and L.M. Vargas
WATER Miami Cantiliver & Grooving Florida County & Hoch & Assoc. Volker Stevin
FDOT

BRIDGE Main sp.480’


OVER West Seattle Tail sp.s 178’ Pipe Pile C.I.P. Balanced Overlay 1989 Double Leaf 51’ $ 34.3 M 90,000 $381.11 Seattle,WA City of WSB-2 Kiewit-Global Paul Giuntini
WATER Swing Bridge Approaches Cantilever Swing Bridge Seattle Design Team JV
106’ - 142’

BRIDGE
OVER Baldwin Bridge 177’ - 275’ P.C. Balanced Overlay 1989 86’-0", $ 93.8 M $ 93.8 M 411,935 $227.71 Old Saybrook, Connecticut Parsons Perini/PCL/O&G P. Hartsfield
WATER Cantilever 76’-11" Connecticut DOT Brinckerhoff

BRIDGE 220’/360’ Existing Bridge


OVER Acosta Bridge 630’ 60" dia. C.I.P. Balanced Grinding 1990 Underwater 75"-8" $ 48.3 M $ 44.1 M 250,000 $176.95 Jacksonville FDOT DRC Recchi Recchi
WATER 275’/160’ Drill Shafts Cantilever & Grooving Protection Varies Florida America, Inc

Latex Modif. 1 Span over RR


BRIDGE 2 Piers 10’ C.I.P. Concrete Track, 2 Spans $ 14.04 M
OVER Puyallup 285’-445’ drilled shaft Haunch Balanced Overlay 1994 Over Sewage 74’ $ 21.7 M For Seg. 108,040 $129.95 Tacoma WSDOT WSDOT Walter & SCI J.A. Weigel
WATER River Bridge 445’-285’ 3 piers 36" Segmental Cantiliver after Plant, 1 span Spans Only Washington
CIP Piles Grinding over River

BRIDGE 196’ Pier Segments Some LoBuono,


OVER Roosevelt to 30" Cast in Place Balanced Grinding 1994 microslica 61’ $ 54.0 M $ 43.6 M 552,533 $79.40 Stuart, FDOT Armstrong & Recchi Ch.Cross
WATER Bridge 260’ P.C. Piles Typ. Segments Cantilever & Grooving concrete Florida Associates America, Inc
Precast Over 2 RR
Contractor
BRIDGE Presumpscot 180 Ft. Arch Cabled Bituminous redesign erection $ 2.6 M Near
OVER Falls River 2@42’-8@25’ Spread C.I.P. Stayed Paving with 1994 scheme to 36’ Including $ 2.6 M 13,248 $196.25 Falmouth, Maine DOT Main DOT Cianbro Corp. Finley McNary
WATER Bridge 2@ 42’ Footing Cantiliver Membrane stayed segmental Appr Span Maine T. Stelmack
Superstructure for arch.

BRIDGE Garcon Santa Rosa Odebrecht-


OVER Santa Rosa 140’ P.C. 30" P.C. Span/Span None 1995 P.C. Piers 43’-1" $ 53.6 M $ 39.5 M 787,718 $50.15 Point Bridge Figg Metric ASBI
WATER Bay Bridge No Epoxy Florida Authority Engineering J.V.

BRIDGE 230’ 5 % Grade


OVER Wabasha to Steel H C.I.P. Balanced 1995 Limited 47’-8" $ 26.0 M $ 14.6 M 130,357 $112.00 St Paul City of Figg Lunda T. DeHaven
WATER Street 400’ 14 x 89 Cantiliver Access Minnesota St. Paul Engineering Construction

BRIDGE Balanced Limited Charleston


OVER Wando River 150’ Steel H & P.C. Cantiliver & 1995 Access 47’-8" $ 32.8 M $ 32.8 M 753,132 $43.55 South SCDOT Figg T.L.James & T.DeHaven
WATER Bridge 300’/400’/300’ P.C. 24" Span/Span Wetlands Carolina Engineering Associates J.V.

Nov. 1-2, 1999


2 Annual Convention
AMERICAN SEGMENTAL BRIDGE INSTITUTE

COST OF CONCRETE SEGMENTAL BRIDGES

TYPE PROJECT SPAN TYPE C.I.P SPAN/SPAN OVERLAY YEAR SPECIAL BRIDGE TOTAL TOTAL SQ. FT. COST TIME
OF NAME RANGE OF P.C. BALANCE GRINDING BID CONDITION WIDTH COST OF COST OF OF PER ADJUST LOCATION OWNER DESIGNER CONTRACTOR
BRIDGE PILE OTHER OTHER GROOVING PROJECT BRIDGE BRIDGE SQ. FT. COST

BRIDGE Daytona Parsons GLF


OVER Seabreeze 250' 24" P.C. P.C. Balanced Grinding 1995 Value 50' $ 24.0 M $ 20.5 M 225,824 $90.80 $99.77 Beach FDOT Brickenhoff / Construction
WATER Bridge Cantiliver & Grooving Engineering Florida Finley McNary Corporation

BRIDGE
OVER Bath-Woolwich 203'-420' 8' Diameter P.C. Balanced 1997 89' $ 46.6 M $ 42.1 M 221,647 $190.00 $194.84 Bath. Maine Maine DOT Figg Flatiron
WATER Drilled Shaft Cantiliver Engineering

BRIDGE Delaware
OVER Sailboat 122' 108" Drilled P.C. Span/Span 1998 2 @ 41'-4" $ 20.4 M $ 20.4 M 252,052 $80.90 $82.33 County OK DOT Figg Traylor Bros.
WATER Bridge Shaft Grand Lake Engineering
Oklahoma

BRIDGE 182'
OVER Putnam St. 322' 72" Drill C.I.P. Balanced Microsilica 1998 70' $ 11.1 M $ 7.9 M 48,000 $164.58 $167.49 Marietta Washington HNTB/Finley Kokosing
WATER 182' Shaft Cantiliver WS Ohio County McNary

BRIDGE Class V Beiswenger,


OVER Evans 180' 30" PC P.C. Span/Span Grinding 1998 Ship Impact 49'-4" $30.75 M $ 25.85 M 294,380 $87.84 $89.39 Stuart FDOT Hoch & Assoc./ PCL Civil
WATER Crary Sr & Grooving Shallow Water Florida Finley McNary Constructors

Fender System
BRIDGE 164' Class V Cofferdam & Daytona
OVER Broadway to 48" & 60" P.C. Balanced Grinding 1998 Seal in Ftgs 48.4' $ 30.9 M $ 25.9 M 291,189 $89.04 $90.61 Beach FDOT Figg Misener Marine
WATER 262' Drill Shafts Variable Depth Cantiliver & Grooving Architectural Florida Engineering
Features

BRIDGE I-895 Bridge 387'


OVER Over James 615' Drilled C.I.P Balanced Microsilica 1998 Over River 57' $ 125.90 M $ 47.61 M 232,341 $204.92 $208.54 Richmond VDOT Parsons Condotte
WATER River 354' Shafts Cantiliver Virginia Brickenhoff America, Inc.

BRIDGE Creve Coeur H-Piles Silica Fume Missouri


OVER Park 185' to 469' Spread Foot. C.I.P Balanced Concrete 1999 182' $ 73.5 M $ 73.5 M 460,105 $159.68 $159.68 St. Louis Highway and Sverdrup Walter & SCI
WATER Memorial Drilled Shafts Cantiliver Wearing Missouri Transportation Civil
Surface Commision

BRIDGE Hathaway 60" Florida


OVER Bridge 178' to 330' Cylinder Piles P.C. Balanced Grinding and 2000 Design-Build 80'0.5" $ 81.5 M $ 61.5 M 576,241 $106.73 $106.73 Panama City DOT HNTB Granite Const.
WATER Replacement Cantilever Grooving Florida

High Level
BRIDGE Memorial 84" Variable Depth Clearwater Florida HDR and PCL
OVER Causeway 168' to 360' Drilled Shafts CIP Balanced Grinding and 2001 VECP 112' 7" $ 47.02 M $ 29.54 M 263,445 $112.16 $112.16 Florida DOT JMI/Earthtech
WATER Cantilever Grooving

BRIDGE Ringling
OVER Bridge 300' 96" CIP-Pier Seg. Balanced Grinding and 2001 106' $ 76.0 M $ 56.0 M 328,255 $170.60 $170.60 Sarasota Florida JMI PCL
WATER Replacement Drilles Shafts PC-Other Seg. Cantilever Grooving Florida DOT

BRIDGE Royal Park Bascule Main span


OVER Bridge 59' to 131' Drilled Shafts CIP Balanced Grinding and 2001 Twin Bridges 42' 9" $ 52.0 M $ 20.27 M 72,534 $279.52 $279.52 West Palm B. Florida E.C.Driver Ballast Nedam
WATER Cantilever Grooving x2 Florida DOT

279.52

Nov. 1-2, 1999


Rev. 11/99 3 Annual Convention
AMERICAN SEGMENTAL BRIDGE INSTITUTE

COST OF CONCRETE SEGMENTAL BRIDGES

TYPE PROJECT SPAN TYPE C.I.P SPAN/SPAN OVERLAY YEAR SPECIAL BRIDGE TOTAL TOTAL SQ. FT. COST SUBMITTED
OF NAME RANGE OF P.C. BALANCE GRINDING BID CONDITION WIDTH COST OF COST OF OF PER LOCATION OWNER DESIGNER CONTRACTOR BY
BRIDGE PILE OTHER OTHER GROOVING PROJECT BRIDGE BRIDGE SQ. FT.

153.5’
VIADUCT SR- 90 DENNY 166-188’ NONE C.I.P. Span/Span 1981 52’ $ 11.4 M 187,351 $60.80 SR90 WSDOT Dickerhoff Hensel Phelps M.Myint Lwin
CREEK BRIDGE 166’-144’ Denny Creek & Widmann Construction
131.4’

Beiswenger
VIADUCT Ramp "I" Over 116’-224’ 18" PC P.C. Balanced Grinding 1982 42’-9" $ 4.97 M 91,271 $54.44 Dade County FDOT Hock and Capaletti Bros. L.M.Vargas
Fla. Tturnpike Cantiliver & Grooving Florida Associates

I-75/I-595 Beiswenger
VIADUCT Interchange 60’ - 206’ 18" PC P.C. Balanced Grinding 1984 42’-9" $ 27.10 M $ 8.77 M 251,680 $34.85 Ft. Lauderdale FDOT Hoch and Cianbro L.M. Vargas
Phase I Cantiliver & Grooving Florida Associates Corporation

VIADUCT Palmetto 84’ to 215’ P.C. Balanced 1984 $ 7.83 M 197,700 $39.60 Florida FDOT A. Moreton
Cantiliver

VIADUCT Airport 85’ to 162’ P.C. Balanced 1985 $ 5.29 M 124,500 $42.50 Florida FL DOT A. Moreton
Cantiliver

VIADUCT US 441 / I-595 124’ to 224’ P.C. Balanced 1986 $11.94 M 177,199 $67.10 Florida FL DOT A. Moreton
Cantiliver

VIADUCT French Creek 200’/210’ 66" drilled P.C. Balanced Bituminous 1987 33’-6" $ 2.78 M 44,220 $63.03 Glenwood HNTB Flatiron M.Miller
Viaduct shafts Cantilever Paving Canyon,CO.

Steel H &
VIADUCT Bridge F-08-3H 200’/210’ Drilled P.C. Balanced Bituminous 1987 33’-6" $ 7.12 M 113,700 $62.63 Glenwood HNTB Flatiron M.Miller
Caissons Cantilever Paving Canyon,CO.

I-75/I-595 Beiswenger Haarbert


VIADUCT Interchange 60’ - 200’ 18" PC P.C. Balanced Grinding 1988 42’-9" $ 51.1 M $ 27.05 M 536,943 $51.16 Ft. Lauderdale FDOT Hoch and Westbrook L.M. Vargas
Phase II Cantiliver & Grooving Florida Associates JV

Overlay Recchi
VIADUCT C & D CANAL 150’ P.C. 24" P.C. Span/Span and 1991 58’-4" $ 58.0 M $ 34.3 M 444,463 $71.17 Middletown, DelDOT Figg America Em.Rosiello
Bridge Grooving Delaware Engineering Inc

Metro Greenline 320’-185’


VIADUCT Bridge - Kramer segmental CIDH C.I.P. Balanced n/a 1991 Rail 27’ $ 8.6 M $ 8.6 M 35,000 $245.71 Los Angeles,CA Los Angeles T.Y. Lyn Kiewit Pacific,Co. Paul Giuntini
& Rosecrans 125’ Cantiliver County MTA International
conv.falsework

VIADUCT H3-North Halawa 350’ - 375’ CIHD C.I.P. Balanced Overlay 1991 Overhead 2 x 41’ /ea $ 149.4 M 479,000 $311.90 Honolulu,HI Hawaii DOT T.Y. Lyn Kiewit Pacific,Co. Paul Giuntini
Cantiliver Gantry International

Nov. 1-2, 1999


1 Annual Convention
AMERICAN SEGMENTAL BRIDGE INSTITUTE

COST OF CONCRETE SEGMENTAL BRIDGES

TYPE PROJECT SPAN TYPE C.I.P SPAN/SPAN OVERLAY YEAR SPECIAL BRIDGE TOTAL TOTAL SQ. FT. COST SUBMITTED
OF NAME RANGE OF P.C. BALANCE GRINDING BID CONDITION WIDTH COST OF COST OF OF PER LOCATION OWNER DESIGNER CONTRACTOR BY
BRIDGE PILE OTHER OTHER GROOVING PROJECT BRIDGE BRIDGE SQ. FT.

450’ Engineering
VIADUCT LA River Bridge Segmental CIDH C.I.P. Balanced n/a 1993 Rail 27.5’ $ 13.4 M 38,913 $344.36 Los Angeles,CA Los Angeles Management Kiewit Pacific,Co. Paul Giuntini
140’ Cantiliver County, MTA Consultants
conv.falsework

Span/Span
VIADUCT US 183 Viaduct 135’ to 180’ P.C. & Overlay 1993 26’ - 58’ X 2 $ 71.3 M 1,300,000 $39.00 Austin, Tx TxDOT TxDOT Eby-Flatiron D. VanLanduyt
Balanced
Cantiliver
Greater
95’ Concrete Erected Cleveland
VIADUCT GCRTA Conrail 158’-139’-158’ Filled Pipe P.C. Balanced Rail Bridge 1994 over active 28’ $ 8.4 M $ 8.4 M 18,000 $465.00 Cleveland, Regional Parsons Kokosing Finley McNary
Bridge 95’ Piles Cantiliver N/A RR Ohio Transit Brickenhoff Construction Co. T. Stelmack
Authority

56’ WMATA
VIADUCT WMATA to P.C. 14" P.C. Span/Span n/a 1995 Narrow 32’-5" $ 44.0 M $ 10.2 M 84,940 $119.95 Washington WMATA Figg Recchi America, Em.Rosiello
Branch Avenue 150’ Curved D.C. Engineering Inc.

106’ Varies Finley


VIADUCT WMATA to NIC P.C. Span/Span Rail Bridge 1995 Superstructure 17’ $ 48.0 M $ 9.2 M 10,000 $92.00 Washington WMATA McNary Lane Construction Finlay McNary
F8A 149’ n/a Only Average D.C. VECP W.S. McNary
Redesign

105’ P.C. Varies


VIADUCT I-93/I-90 Interchan. to Drill Shafts w/integral Balanced Latex or 1996 81’-0" $ 397.0 M $ 50.0 M 300,000 $166.67 Boston Mass DOT LoBuono, Slattery,Interbeton C. Finley
I-93 NB (CO9AA) 217’ Piers Cantiliver Microsilica Max. Ma. Armstrong White & Perini

VIADUCT SR 87 Arizona 235’ to 405’ C.I.P. Balanced Overlay 1996 $ 7.0 M $145.00 Arizona AZDOT T. Y. Lin Edward T. Y. Lin
Cantiliver International Kreemer International

High Seismic
I-95 / US 95 92’ - 6" Span/Span Region Erected 26’ - 7"
VIADUCT Interchange to Drilled Shaft P.C. & Grooving 1997 over I-95 & & $ 92.0 M $ 24.0 M 253,270 $94.76 Las Vegas, NV Nevada Parsons Walter & SCI Finley McNary
(Spaghetti Bowl) 212’ - 6" Balanced US-95 Complex 38’ - 5" Superstr. Superstr. DOT Brickenhoff T. Stelmack
Cantiliver Geometry Only Only
100’ Appr.
I-205 Bridge Span Single 96" 1998 High Seismic 39,730
VIADUCT Portland Light 180’ Diameter Balanced Rail Bridge Design Region 34’ - 3" Total Portland, OR Tri-Met Finley Bechtel Finley McNary
Rail Airport 2 - 250’ Drilled Cantiliver n/a Build Erected over 29,455 McNary Infrastructure T. Stelmack
Max Extension 180’ Shafts I-205 Segmental

Span/Span
VIADUCT I-93 Viaducts 90’ to 204’ Drilled Shafts C.I.P. & 1998 22’ - 46’ $ 79.3 M 520,000 $152.00 Boston, MA Mass DOT Figg Modern Figg
and Ramps 7’ - 8’ - 9’ Balanced Engineering Continental Emgineering
Cantiliver

I-895
VIADUCT Main Line 192’ to 141’ H Piles P.C. Balance Microsilica 1998 57’ +/- $ 125.9 M $ 42.82 M 374,047 $114.47 Richmond VDOT Parsons Recchi America, C. Bellero
East - West Cantiliver Virginia Brickenhoff Inc.
Approach

VIADUCT I-895 135’ +/- H Piles P.C. Span/Span Microsilica 1998 30’ +/- $ 125.9 M $ 17.97 M 128,043 $140.34 Richmond VDOT Parsons Recchi America, C. Bellero
Ramps E, G, H Virginia Brickenhoff Inc.

Nov. 1-2, 1999


2 Annual Convention
AMERICAN SEGMENTAL BRIDGE INSTITUTE

COST OF CONCRETE SEGMENTAL BRIDGES

TYPE PROJECT SPAN TYPE C.I.P SPAN/SPAN OVERLAY YEAR SPECIAL BRIDGE TOTAL TOTAL SQ. FT. COST TIME
OF NAME RANGE OF P.C. BALANCE GRINDING BID CONDITION WIDTH COST OF COST OF OF PER ADJUST LOCATION OWNER DESIGNER CONTRACTOR
BRIDGE PILE OTHER OTHER GROOVING PROJECT BRIDGE BRIDGE SQ. FT. COST

I-25/I-40 32'-6"
VIADUCT Interchange 150' --> 203' Drilled P.C. Balance Grinding 2000 & $ 222.0 M $ 26.60 M 321,290 $82.79 $82.79 Albuquerque NMSHTD URS Twin Mountain
Big I Shafts Cantiliver Grooving 42'-4" New Mexico Kiewit

Single
Palm Beach No Excuse Lane 40' Modern
VIADUCT International Airport 115' to 236' 24" Piles P.C. Balance Grinding 2000 Bonus 1030 Dual $ 110.0 M $ 50.0 M 500,979 $99.80 $99.80 West Palm FDOT BHA Continental
SR9/i95 Interchange Cantiliver days to Lane 58' Beach, Florida South
Complete

Jacksonville South 134' to 239 Ramp G-2 25' 6" $ 5.8 M 55,412 $105.74 $105.74 Parsons
VIADUCT Interchange 134' to 219' 24" Piles P.C. Balance Grinding and 2001 Ramp H-1 42' 6" $ 99.8 M $ 12.7 M 142,826 $88.85 $88.85 Jacksonville FDOT Transportation AMEC Civil
SR9A/i95/i295 144' to 246' Cantilever Grooving Ramp I-2 42' 6" $ 9.0 M 104,582 $86.25 $86.25 Florida Group

Ft. Lauderdale
VIADUCT Airport 120' to 220' 18" Piles P.C. Balance Grinding and 2000 Design-Build 55' Max $ 88 M $ 24 M 241,215 $99.00 $99.00 Ft. Lauderdale Broward BHA PCL
Interchange Cantilever Grooving Florida County

Demolition of
Viaducts/C09C1 Steel 16" Dia. Existing Struc. Massachusetts
VIADUCT I-93 / I90 and Drilled P.C. 1996 not included $ 108.6 M $ 27.64 M 138,400 $199.71 $214.12 Boston, MA Highway Modern
Interchange Shafts 9' in cost of new Department Continental
bridge

Viaducts/C019B1 Steel and Massachusetts


VIADUCT North of Charles Drilled Shafts P.C. 1997 $ 187.9 M $ 70.36 M 487,900 $144.21 $147.89 Boston, MA Highway DRC Modern
River 8' - 9' Department Continental

Viaducts/C09A4 Precast Piles Massachusetts Slattery


VIADUCT I-93 and Drilled P.C. 1997 $ 397.5 M $ 53.5 M 273,550 $195.57 $209.68 Boston, MA Highway Interbeton
North Bound Shafts Department White Perini
6' - 7' - 9' JV

Viaducts/C009C4 Massachusetts
VIADUCT P.C. 1997 $ 17.6 M 43,250 $406.93 $436.28 Boston, MA Highway
Department

Viaducts/C009C2 Massachusetts
VIADUCT P.C. 1997 $ 45.7 M 130,800 $349.39 $374.59 Boston, MA Highway
Department

Tampa
VIADUCT Leroy Selmon Drill Shafts P.C. Span by Span 2002 Large wing $ 158.8 M Tampa Hilsborough Figg PCL Civil
Bridge Curved bottom Florida Xway Authority Engineering
and sides

Rev. 11/99 3
AMERICAN SEGMENTAL BRIDGE INSTITUTE

COST OF CONCRETE SEGMENTAL BRIDGES

TYPE PROJECT SPAN TYPE C.I.P SPAN/SPAN OVERLAY YEAR SPECIAL BRIDGE TOTAL TOTAL SQ. FT. COST SUBMITTED
OF NAME RANGE OF P.C. BALANCE GRINDING BID CONDITION WIDTH COST OF COST OF OF PER LOCATION OWNER DESIGNER CONTRACTOR BY
BRIDGE PILE OTHER OTHER GROOVING PROJECT BRIDGE BRIDGE SQ. FT.

470’ Overlay
CABLE Talmage 1100’ Steel H C.I.P. Balanced and 1987 79’ $ ? M $ 34.0 M 161,160 $211.00 Savannah Ga DOT DRC Monterey-Groves B. West
STAYED Bridge 470’ Cantilever Grooving Georgia J.V.

Overlay
CABLE C & D CANAL 750’ P.C. 24" P.C. Cantiliver and 1991 58’-4" $ 58.0 M $ 17.7 M 95,497 $185.35 Middletown, DelDOT Figg Recchi America, Em.Rosiello
STAYED Bridge Construction Grooving Delaware Engineering Inc

Varies
2 Approach Over Total from
CABLE Foss 138’/148’ 9_’ - 12’ C.I.P. Falsework None 1994 water/urban 117.2’ $ 17.9 M $16.8 M 102,531 $164.50 Tacoma WsDOT Max J. Kuney J.A. Weigel
STAYED Waterway 375’/32’ Drilled Shaft Supported area to Washington
89.2’

625’
CABLE Sidney 1250’ 72" Diam. C.I.P. Balanced Grooving 1996 Two Rock Isl. 79’-6" $ 65.4 M $ 53.6 M 198,750 $269.95 Brunswick Ga DOT DRC Recchi/GLF B. West
STAYED Lanier 625’ Drill Shafts Cantilever Georgia J.V.