LADANG ZAHARAH MAJU S/B - Solar Power Usage Estimation

LOCATION: BLOCK 8

No. of Unit 4

1 ESTIMATED POWER CONSUMPTION


Power Usage Per No. Used by Each Total Power Grand Total Power
Unit (W) Unit Total Used Required (W) Hour Used Consumption in a
Day (W)

Light (Unit 1) 22 8 8 176 6 1,056


Light (Unit 2-7) 22 4 16 352 6 2,112
Mobile Charging 5 2 8 40 6 240
TV 200 0 1 200 6 1,200
DVD PLAYER 15 0 1 15 6 90

4,698
30% ADDITIONAL 6,107

2 SOLAR PANEL
ESTIMATED 6- POWER
HOURS OF CONSUMPTION / PANEL REQUIRED
SUNLIGHT PANEL CAPACITY
(A) 345W (POLY) 2070 2.9504347826 4 Short Circuit Current 9.64 A Current 9.09570261
Open Circuit Voltage 47.46 V
COST EACH RM655 Max Power Current 9.09 A
TOTAL COST: RM2,620 Maximum Power Voltage 37.93 V

(B) 290W (MONO) 1740 3.51 4 Short Circuit Current 5.99 A Current 5.57692308
Open Circuit Voltage 63.7 V
COST EACH RM498 Max Power Current 5.58 A Total Current 22.3076923
TOTAL COST: RM1,992 Maximum Power Voltage 52 V

3 BATTERY
Battery Capacity 150AH 12V (37 KG)
Storage Capacity 1800 KWh
No Required 3.393
Rounded To Unit Required 4 7,200 KWh

COST EACH RM880


TOTAL COST: RM3,520

Battery Capacity 200AH 12V (54 KG) TEL: 019-6505752


Storage Capacity 2400 KWh
No Required 2.54475
Rounded To Unit Required 3 7,200 KWh

COST EACH RM1,200


TOTAL COST: RM3,600

4 EQUIPMENT / ACCIDENTAL
A CHARGE CONTROLLER
Required 30A
1st YEAR Price] Month Total
COST EACH RM266 ROI Genset 500 1 500
Petrol 200 12 2400
Spark Plug 12 12 144
Engine Oil 8 12 96
B INVERTER * 2000-W FROM BLOCK C 3140

2nd YEAR Petrol 200 12 2400


Total: RM6,000 Spark Plug 12 12 144
Engine Oil 8 12 96
2640