BASIC INFORMATION
Location: POK FU LAM ROAD, SW
CONSEQUENCE-TO-LIFE CATEGORY
Facility at Crest: Undeveloped green belt
SLOPE PART
(1) Max. Height (m): 18 Length (m): 170 Average Angle (deg): 65
(2) Max. Height (m): 26 Length (m): 170 Average Angle (deg): 50
WALL PART
N/A
MAINTENANCE RESPONSIBILITY
(1) Sub Div.: 0 Government Feature Party: HyD Agent: HyD Land Cat.: 5b(iii) Reason Code: 56 MR Endorsement Date: 23-Nov-2009
WALL PART
N/A
SERVICES
(1) Utilities Type: Gas Size(mm): 0 Location: On slope Remark: N/A
(2) Utilities Type: Water Main Size(mm): 100 Location: On slope Remark: N/A
(3) Utilities Type: Water Main Size(mm): 150 Location: On slope Remark: N/A
BACKGROUND INFORMATION
GIU Cell Ref.: 11SW12C1
Map Sheet Reference (1:1000): 11SW-12C
Aerial Photos: Photo Number (Year)
27117 (1979)
27118 (1979)
Nearest Rainguage Station St. Clare's Girls' School, 50 Mount Davis Road. (H01)
(Station Number):
Remarks: N/A
eLPMIS
LPM/LPMit Details Report
LPM Study Feature No.: 11SW-C/C 79
Location: 100M NORTHWEST OF QUEEN MARY HOSPITAL, POK FU LAM
District Council: Southern
Maintenance Responsibility (At the Time of Selection): Government
Responsible Party for Maintenance of Government Portion: HyD
Private Lot No.: N/A
LPM/LPMit Study
Agreement No.: CE45/2001
Study Type: Stage 3 Study Under Schedule of Rates Contract
Consultant: Fugro (HK) Ltd.
GEO Managing Section / Engineer: LPM1/CM13
Study Status: Study completed
Design Approach: Conventional (GI + Analysis)
Option Assessment Accepted: N/A
Study Report No.: S3R130/2003
Programme / Actual Commencement: 12-Nov-2001
Programme / Actual Completion: 31-Oct-2003
Report Recommendation (For Stage 2 Study): Upgrading Works
District Check Status: Exempted from checking
Checking Certificate No.: GEO/LPM268/2005
GEO Engineer's Remarks: N/A
LPM/LPMit Works
Works Contract No.: GE/2003/28
GEO Managing Section / Engineer: LPM1/CM13
Contractor: Kenly (Hong Kong) Limited
Progress Status: Maintenance completed
Reason of Study Termination / Works Deletion (If Necessary): N/A
Forecast Commencement Date: 20-Sep-2004
Forecast Completion Date: 19-Mar-2005
Completion Cert. Issued: N/A
Site Handed Over to Maintenance Department on: N/A
Estimated Cost for Upgrading (HK$M): 2.96
Maintenance Manual No.: MM292/2005
Actual Works: Raking drain,Soil nail,Typical rock slope treatment,Vegetated cover,Wire mesh
No. of Tree Felled: N/A
No. of Tree Planted (Incl. Transplant): N/A
% Bare of Slope Surfacing: N/A
% Vegetated of Slope Surfacing: N/A
% Shotcrete of Slope Surfacing: N/A
Other Hard Surface of Slope Surfacing: N/A
PHOTO