Professional Documents
Culture Documents
√ √ √ √
√ √ √ √
√ √ √ √
NOTE:-
1. STUB BUS DIFFRENTIAL PROTECTION SHALL BE PROVIDED TO THE INTERCONNECTION LINE.
FOR THIS, DEDICATED CORE OF TRAFO HV CT & BUS CT OF POOLING SUBSTATION SHALL BE USED.
2. THERE SHALL BE TWO SEPARATE AUXILIARY SUPPLY SYSTEM FOR SPS-1 & SPS-2.EACH AUXILIARY HYBRID POWER PROJECT 450 MW ,
TIRUCHIRAPPALLI , TAMILNADU
SYSTEM SHALL HAVE ONE NOS 33/0.415 kV AUXILIARY TRAFO & ONE NO DG SET (AUTO CUT-IN) RESPECTIVELY.
3. THE AUXILIARY LT SYSTEM OF PS WILL HAVE TWO INCOMERS ONE EACH FROM SPS-1 & SPS-2. PLOT NO.
SINGLE LINE DIAGRAM
4. SAPARATE CONTROL SYSTEM INCLUDING SCADA SHALL BE PROVIDED FOR SPS-1, SPS-2 & PS
FOR 450 MW
RESPECTIVELY PLACED IN COMMON MCR BUILDING.
5. ALL 400kV CTS SHALL HAVE SAME CORE CONFIGURATION EXCEPT O/G LINE.
SBE-001-E-LD-008