MS. CHRISMYLEEN LACADEN

SUBJECT : COST PROPOSAL FOR BUILDING PLANS AS REQUIRED BY QC CITY


HALL

Sir/ Maam,

In connection to the above mentioned subject, we are pleased to offer you the
following for your consideration.

i. SCOPE OF THE WORK

8 sets of Blueprint all signed and sealed, the plan includes the following

a. Exterior Perspective g. Structural Plans


h
b. Site Development Plan Structural Analysis
.
c. Architectural Plans i. Plumbing Plans
d. Elevations j. Bill of Materials
e. Electrical Plans k. Specification of Materials
f. Electrical Load Computation l. E-file of the Drawings

ii. COST PROPOSAL


Seventy Nine Thousand and Seventy Nine Pesos Only, (79,079.00)

iii PAYMENT TERMS

1. 70% DP
2. 30% Upon Completion

Thank you for giving us the opportunity to quote on your valued requirements. We
hope that you’ll find the above in order.

Respectfully,

RCOP DESIGN AND BUILD SERVICES


Ada Christine Copiaco
General Manager