11kV switchgear:
This test is to confirm the busbar joints are connected properly and verify
the tightness. The test connection diagram is as shown in Figure below.
The test shall be done with CBs inserted and closed. Measure the contact
dc resistance between panels by injecting 100A DC. This will include
busbar joint, CB contact resistance, CB cluster resistance, and CT
primary resistance (if applicable).
Result:
The obtained results should be similar for all phases for each set
of measurement. Other influencing factors to be considered, like length of
the measured path, rating of the busbar, rating of CB, rating of CT and
temperature.