PROPOSAL

JUNE 27, 2019


Project : MANHOLE INSTALLATION GIM AND CCIM
Owner : CAVITEX INFRASTRUCTURE
Location : C-5 SOUTH LINK EXP. SEGMENT 3A-1
Subcontractor : DLQ RAMAZ CONSTRUCTION

BILL OF QUOTATION (MANHOLE INSTALLATION)


ITEM DISCRIPTION QUAN UNIT UNIT MATERIAL LABOR TOTAL
TITY COST COST COST AMOUNT

1 SUPERVISION 1 lot P 30,000 P 30,000.00


2 TEMPORARY FACILITIES 1 lot P 18,000 P 18,000.00
3 CLEARING 30 pcs P 1,900 P 57,000.00
4 DEWATERING 30 pcs P 900 P 27,000.00
5 MANHOLE INSTALLATION 30 sets P 28,500 P 855,000.00
6 MISCELANEOUS & CONSUMABLES 1 lot P 25,000 P 25,000.00

TOTAL P 0.00 P 0.00 P 1,012,000.00

Note: 1.) 100% billing process


2.) Less 10% percent retention
3.) 30 % down payment
4.) Personal protective equipment c/o DLQ RAMAZ
5.) barracks/accommodation of workers c/o DLQ RAMAZ

Prepared by: Cheeked by Approved by:


DLQ RAMAZ CONSTRUCTION Date: _______________ Date: _______________